← All districts

Write your representative · FY2027 budget

Manila City (Third District)

Representative: Joel R. Chua · bills and roles · official House profile

Served by: North Manila DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 27 lines selected.

Hon. Joel R. Chua
Representative, Manila City (Third District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Manila City (Third District)

Dear Representative Joel R. Chua:

Good day. I live in Manila City (Third District), and I would like to ask about some DPWH lines for the North Manila DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Rehabilitation of Drainage System along Makiling St. Chainage 000 to Chainage 338, Manila City (North Manila DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
2. Rehabilitation of Drainage System along M. Roxas Service Road (S02328LZ) Chainage 264.00 to Chainage 471.00, Manila City, Metro Manila (North Manila DEO): not in the NEP; ₱39,700,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
3. Rehabilitation of Drainage System along Corregidor St., Manila City (North Manila DEO): not in the NEP; ₱38,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
4. Construction (Completion) of the DPWH North Manila District Engineering Office (New Building) including Support Facilities, Manila City, 14.59787372, 121.00369026 (North Manila DEO): not in the NEP; ₱35,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 924; no matching NEP line for this office]
5. Rehabilitation of Drainage System along Galicia Street Chainage 163.20 to Chainage 337.80, Manila City (North Manila DEO): not in the NEP; ₱28,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
6. Rehabilitation of Drainage System along Bagac Street, Tondo, Manila City, Metro Manila (North Manila DEO): not in the NEP; ₱27,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office]
7. Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897 (North Manila DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 652; no matching NEP line for this office]
8. Rehabiltiation and Improvement of DPWH North Manila District Engineering Office (Existing Building), Manila City (North Manila DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 924; no matching NEP line for this office]
9. A Maceda St - K0005 + 304 - K0006 + 000 (North Manila DEO): not in the NEP; ₱13,700,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 134; no matching NEP line for this office]
10. Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749 (North Manila DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 134; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- North Manila DEO: 1,766 contracts (2016–2025) in public DPWH records; 1,578 recorded as completed and 135 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Rehabilitation of Drainage System, Zone 1-12, Tondo, Manila City (24OE0180): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/494c331d-9557-4da3-9c05-fddddf5ca09b
- Installation of Booster Pump including Accessories at Estero de Vitas, Barangay 151, Manila City (22OE0007): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/8a5b7cb1-6ca9-48a3-967f-8c7fbf429347
- Rehabilitation of Drainage System at Zone 41-57 (Phase 2), Manila City (23OE0089): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/a6f1e215-d33f-4056-905e-fe9fd963ad64
- Construction of Pumping Station at Estero dela Reina, Barangay 55 (Phase II), Tondo, Manila City (24OE0002): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/b3284acb-a20b-4997-9887-f6fe7317b66e
- Rehabilitation of Drainage System at Zone 41-57, Manila City (22OE0030): Duplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/91a245c3-c5d5-498d-8e09-c25c82fca047

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/manila-3rd

Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.

North Manila DEO

This district engineering office also serves Manila City (First District); Manila City (Second District); Manila City (Fourth District); Manila City (Sixth District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱1.37B
89 lines
President’s NEP
₱1.00B
66 lines
Added by the House
25
₱378.4M
Changed / removed
0 / 2
64 lines unchanged
Lines that differ from the NEP (25)
LineChangeNEPHouseSources
Rehabilitation of Drainage System along Makiling St. Chainage 000 to Chainage 338, Manila CityAdded by the House—₱50,000,000HB p. 317
Rehabilitation of Drainage System along M. Roxas Service Road (S02328LZ) Chainage 264.00 to Chainage 471.00, Manila City, Metro ManilaAdded by the House—₱39,700,000HB p. 317
Rehabilitation of Drainage System along Corregidor St., Manila CityAdded by the House—₱38,000,000HB p. 317
Construction (Completion) of the DPWH North Manila District Engineering Office (New Building) including Support Facilities, Manila City, 14.59787372, 121.00369026Added by the House—₱35,000,000HB p. 924
Rehabilitation of Drainage System along Galicia Street Chainage 163.20 to Chainage 337.80, Manila CityAdded by the House—₱28,000,000HB p. 317
Rehabilitation of Drainage System along Bagac Street, Tondo, Manila City, Metro ManilaAdded by the House—₱27,000,000HB p. 317
Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897Added by the House—₱20,000,000HB p. 652
Rehabiltiation and Improvement of DPWH North Manila District Engineering Office (Existing Building), Manila CityAdded by the House—₱15,000,000HB p. 924
A Maceda St - K0005 + 304 - K0006 + 000Added by the House—₱13,700,000HB p. 134
Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749Added by the House—₱12,000,000HB p. 134
Rehabilitation of Drainage System at Barangay 158 Zone 14, Manila City, Metro ManilaAdded by the House—₱10,000,000HB p. 317
Construction of Multi-Purpose Building, Dolmar Golden Hills, Barangay 167, Caloocan CityAdded by the House—₱10,000,000HB p. 652
Repair/Improvement of Multi-Purpose Building, Rene Cayetano, Barangay 176-D, Caloocan CityAdded by the House—₱10,000,000HB p. 652
Rehabilitation of Roads along Dagupan St., (Bulacan St., to Dead End), Manila CityAdded by the House—₱7,500,000HB p. 449
Rehabilitation of Drainage System along Moret Street Chainage 193 to Chainage 238.20, Manila CityAdded by the House—₱7,000,000HB p. 317
Construction of Drainage along Yuseco St. (PNR Crossing), C885.70 to C900.30, Manila City, Metri ManilaAdded by the House—₱7,000,000HB p. 317
VG Cruz St. (S02472LZ) K0005 + 520 - K0005 + 662Added by the House—₱6,500,000HB p. 134
Blumentritt St (LZ) - K0006 + (-1186) - K0006 + (-784)Added by the House—₱6,000,000HB p. 121
Rehabilitation of Drainage System along Loreto Ext. (M. Francisco to A.H. Lacson) Chainage 0 to Chainage 98, Manila CityAdded by the House—₱6,000,000HB p. 317
Rehabilitation of Drainage System at Barangay 154 Zone 14, Manila City, Metro ManilaAdded by the House—₱5,000,000HB p. 317
Rehabilitation of Drainage System at Barangay 179 Zone 16, Manila City, Metro ManilaAdded by the House—₱5,000,000HB p. 317
Rehabilitation of Roads along Yuseco St., (Yuseco Br. - PNR), Manila CityAdded by the House—₱5,000,000HB p. 449
Improvement of of Multi-Purpose Building, Natividad Subdivision Phase 1, Barangay 168, Caloocan CityAdded by the House—₱5,000,000HB p. 652
Improvement of of Multi-Purpose Building, Natividad Subdivision Phase 3, Barangay 168, Caloocan CityAdded by the House—₱5,000,000HB p. 652
Rehabilitation of Multi-Purpose Building at Barangay 186, Manila City, Metro Manila, 14.63081252, 120.97503361Added by the House—₱5,000,000HB p. 652
NEP lines with no match in the House version (2)
  • Pacheco Street · ₱6,189,000 · NEP PDF p. 133
  • A. H. Lacson Avenue · ₱6,059,000 · NEP PDF p. 133

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

1,766 contracts from 2016 to 2025 in public DPWH records (₱57.53B): 1,578 recorded as completed, 135 as ongoing. 1,700 have a satellite image check on file. Browse them.

40 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.