Hon. Giselle Mary L. Maceda Representative, Manila City (Fourth District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Manila City (Fourth District) Dear Representative Giselle Mary L. Maceda: Good day. I live in Manila City (Fourth District), and I would like to ask about some DPWH lines for the North Manila DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Rehabilitation of Drainage System along Makiling St. Chainage 000 to Chainage 338, Manila City (North Manila DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office] 2. Rehabilitation of Drainage System along M. Roxas Service Road (S02328LZ) Chainage 264.00 to Chainage 471.00, Manila City, Metro Manila (North Manila DEO): not in the NEP; ₱39,700,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office] 3. Rehabilitation of Drainage System along Corregidor St., Manila City (North Manila DEO): not in the NEP; ₱38,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office] 4. Construction (Completion) of the DPWH North Manila District Engineering Office (New Building) including Support Facilities, Manila City, 14.59787372, 121.00369026 (North Manila DEO): not in the NEP; ₱35,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 924; no matching NEP line for this office] 5. Rehabilitation of Drainage System along Galicia Street Chainage 163.20 to Chainage 337.80, Manila City (North Manila DEO): not in the NEP; ₱28,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office] 6. Rehabilitation of Drainage System along Bagac Street, Tondo, Manila City, Metro Manila (North Manila DEO): not in the NEP; ₱27,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 317; no matching NEP line for this office] 7. Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897 (North Manila DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 652; no matching NEP line for this office] 8. Rehabiltiation and Improvement of DPWH North Manila District Engineering Office (Existing Building), Manila City (North Manila DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 924; no matching NEP line for this office] 9. A Maceda St - K0005 + 304 - K0006 + 000 (North Manila DEO): not in the NEP; ₱13,700,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 134; no matching NEP line for this office] 10. Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749 (North Manila DEO): not in the NEP; ₱12,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 134; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - North Manila DEO: 1,766 contracts (2016–2025) in public DPWH records; 1,578 recorded as completed and 135 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Rehabilitation of Drainage System, Zone 1-12, Tondo, Manila City (24OE0180): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/494c331d-9557-4da3-9c05-fddddf5ca09b - Installation of Booster Pump including Accessories at Estero de Vitas, Barangay 151, Manila City (22OE0007): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/8a5b7cb1-6ca9-48a3-967f-8c7fbf429347 - Rehabilitation of Drainage System at Zone 41-57 (Phase 2), Manila City (23OE0089): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/a6f1e215-d33f-4056-905e-fe9fd963ad64 - Construction of Pumping Station at Estero dela Reina, Barangay 55 (Phase II), Tondo, Manila City (24OE0002): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/b3284acb-a20b-4997-9887-f6fe7317b66e - Rehabilitation of Drainage System at Zone 41-57, Manila City (22OE0030): Duplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/91a245c3-c5d5-498d-8e09-c25c82fca047 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/manila-4th
Write your representative · FY2027 budget
Manila City (Fourth District)
Representative: Giselle Mary L. Maceda · bills and roles · official House profile
Served by: North Manila DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 27 lines selected.
North Manila DEO
This district engineering office also serves Manila City (First District); Manila City (Second District); Manila City (Third District); Manila City (Sixth District). The budget lines below belong to the office, not to one district.
- House version (HB 10858)
- ₱1.37B
- 89 lines
- President’s NEP
- ₱1.00B
- 66 lines
- Added by the House
- 25
- ₱378.4M
- Changed / removed
- 0 / 2
- 64 lines unchanged
Lines that differ from the NEP (25)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Rehabilitation of Drainage System along Makiling St. Chainage 000 to Chainage 338, Manila City | Added by the House | — | ₱50,000,000 | HB p. 317 |
| Rehabilitation of Drainage System along M. Roxas Service Road (S02328LZ) Chainage 264.00 to Chainage 471.00, Manila City, Metro Manila | Added by the House | — | ₱39,700,000 | HB p. 317 |
| Rehabilitation of Drainage System along Corregidor St., Manila City | Added by the House | — | ₱38,000,000 | HB p. 317 |
| Construction (Completion) of the DPWH North Manila District Engineering Office (New Building) including Support Facilities, Manila City, 14.59787372, 121.00369026 | Added by the House | — | ₱35,000,000 | HB p. 924 |
| Rehabilitation of Drainage System along Galicia Street Chainage 163.20 to Chainage 337.80, Manila City | Added by the House | — | ₱28,000,000 | HB p. 317 |
| Rehabilitation of Drainage System along Bagac Street, Tondo, Manila City, Metro Manila | Added by the House | — | ₱27,000,000 | HB p. 317 |
| Rehabilitation of Multi Purpose Building located inside of Patricia Paraiso Sports Complex, Manila City, 14.6341862, 120.9740897 | Added by the House | — | ₱20,000,000 | HB p. 652 |
| Rehabiltiation and Improvement of DPWH North Manila District Engineering Office (Existing Building), Manila City | Added by the House | — | ₱15,000,000 | HB p. 924 |
| A Maceda St - K0005 + 304 - K0006 + 000 | Added by the House | — | ₱13,700,000 | HB p. 134 |
| Ma. Clara St. (S02454LZ) K0008 + 421 - K0008 + 749 | Added by the House | — | ₱12,000,000 | HB p. 134 |
| Rehabilitation of Drainage System at Barangay 158 Zone 14, Manila City, Metro Manila | Added by the House | — | ₱10,000,000 | HB p. 317 |
| Construction of Multi-Purpose Building, Dolmar Golden Hills, Barangay 167, Caloocan City | Added by the House | — | ₱10,000,000 | HB p. 652 |
| Repair/Improvement of Multi-Purpose Building, Rene Cayetano, Barangay 176-D, Caloocan City | Added by the House | — | ₱10,000,000 | HB p. 652 |
| Rehabilitation of Roads along Dagupan St., (Bulacan St., to Dead End), Manila City | Added by the House | — | ₱7,500,000 | HB p. 449 |
| Rehabilitation of Drainage System along Moret Street Chainage 193 to Chainage 238.20, Manila City | Added by the House | — | ₱7,000,000 | HB p. 317 |
| Construction of Drainage along Yuseco St. (PNR Crossing), C885.70 to C900.30, Manila City, Metri Manila | Added by the House | — | ₱7,000,000 | HB p. 317 |
| VG Cruz St. (S02472LZ) K0005 + 520 - K0005 + 662 | Added by the House | — | ₱6,500,000 | HB p. 134 |
| Blumentritt St (LZ) - K0006 + (-1186) - K0006 + (-784) | Added by the House | — | ₱6,000,000 | HB p. 121 |
| Rehabilitation of Drainage System along Loreto Ext. (M. Francisco to A.H. Lacson) Chainage 0 to Chainage 98, Manila City | Added by the House | — | ₱6,000,000 | HB p. 317 |
| Rehabilitation of Drainage System at Barangay 154 Zone 14, Manila City, Metro Manila | Added by the House | — | ₱5,000,000 | HB p. 317 |
| Rehabilitation of Drainage System at Barangay 179 Zone 16, Manila City, Metro Manila | Added by the House | — | ₱5,000,000 | HB p. 317 |
| Rehabilitation of Roads along Yuseco St., (Yuseco Br. - PNR), Manila City | Added by the House | — | ₱5,000,000 | HB p. 449 |
| Improvement of of Multi-Purpose Building, Natividad Subdivision Phase 1, Barangay 168, Caloocan City | Added by the House | — | ₱5,000,000 | HB p. 652 |
| Improvement of of Multi-Purpose Building, Natividad Subdivision Phase 3, Barangay 168, Caloocan City | Added by the House | — | ₱5,000,000 | HB p. 652 |
| Rehabilitation of Multi-Purpose Building at Barangay 186, Manila City, Metro Manila, 14.63081252, 120.97503361 | Added by the House | — | ₱5,000,000 | HB p. 652 |
NEP lines with no match in the House version (2)
- Pacheco Street · ₱6,189,000 · NEP PDF p. 133
- A. H. Lacson Avenue · ₱6,059,000 · NEP PDF p. 133
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,766 contracts from 2016 to 2025 in public DPWH records (₱57.53B): 1,578 recorded as completed, 135 as ongoing. 1,700 have a satellite image check on file. Browse them.
40 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Rehabilitation of Drainage System, Zone 1-12, Tondo, Manila City 24OE0180 · Completed · ₱96.2MDuplicate or Near-Duplicate Projects · satellite before / after
- Installation of Booster Pump including Accessories at Estero de Vitas, Barangay 151, Manila City 22OE0007 · Completed · ₱93.8MDuplicate or Near-Duplicate Projects · satellite before / after
- Rehabilitation of Drainage System at Zone 41-57 (Phase 2), Manila City 23OE0089 · Completed · ₱67.5MDuplicate or Near-Duplicate Projects
- Construction of Pumping Station at Estero dela Reina, Barangay 55 (Phase II), Tondo, Manila City 24OE0002 · Completed · ₱64.2MDuplicate or Near-Duplicate Projects
- Rehabilitation of Drainage System at Zone 41-57, Manila City 22OE0030 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Installation of Booster Pump along Estero de Sampaloc (Phase III), Manila City 23OE0071 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Retarding Basin at Estero dela Reina, (Phase IV), Manila City 22OE0012 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Installation of Booster Pump Accessories along Estero de Vitas, Barangay 151, Manila City 24OE0172 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Rehabilitation of drainage system along Various Major Roads within Zone 13 to Zone 24, Tondo, Manila City 22OE0031 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Installation of Booster Pump along Estero dela Reina (Phase I), Barangay 9, Tondo, Manila City 23OE0070 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Bank Improvement (Steel Sheet Pile) along Estero do Magdalena, sta. 0+076.00 to Sta. 0+155.20 Both side, Tondo, Manila City 22OE0164 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Bank Improvement (Steel Sheet Pile) along Estero do Magdalena, sta. 0155.20 to Sta. 0+307.20 Left side Tondo, Manila City 22OE0166 · Completed · ₱49.0MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.