Hon. Jaime R. Fresnedi Representative, City Of Muntinlupa (Lone District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for City Of Muntinlupa (Lone District) Dear Representative Jaime R. Fresnedi: Good day. I live in City Of Muntinlupa (Lone District), and I would like to ask about some DPWH lines for the Las Piñas-Muntinlupa DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Rehabilitation of Road and Drainage, BFRV, Barangay Talon 2, Las Piñas City (Las Piñas-Muntinlupa DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 440; no matching NEP line for this office] 2. Construction of Multi-Purpose Building (Covered Court), BarangayTunasan, Muntinlupa City (Las Piñas-Muntinlupa DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 647; no matching NEP line for this office] 3. Construction of Multi-Purpose Building (Covered Court), Barangay Sucat, Muntinlupa City, 14.4574023, 121.0528488 (Las Piñas-Muntinlupa DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 647; no matching NEP line for this office] 4. Construction of Flood Control Structure, Bubugan Creek, Muntinlupa City (Las Piñas-Muntinlupa DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 362; no matching NEP line for this office] 5. Construction of Retaining Wall along Talon Creek (Julio's Compound and PAGIBIG Homes), Barangay Talon 1 and Barangay Talon 4, Las Piñas City (Las Piñas-Muntinlupa DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 363; no matching NEP line for this office] 6. Construction of Multi-purpose Building (Social Services Area), Bayanan Old Plaza, Muntinlupa City, 14.40963177, 121.04971832 (Las Piñas-Muntinlupa DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 647; no matching NEP line for this office] 7. Construction of Multi-Purpose Building (Social Services Area), Barangay Alabang, Muntinlupa City, 14.4095884, 121.04997165 (Las Piñas-Muntinlupa DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 647; no matching NEP line for this office] 8. Construction of Road and Drainage along San Jose Alleys, Barangay Daniel Fajardo, Las Piñas City (Las Piñas-Muntinlupa DEO): not in the NEP; ₱14,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 440; no matching NEP line for this office] 9. Zapote-Alabang Rd - K0023 + 408 - K0023 + 538 (Las Piñas-Muntinlupa DEO): not in the NEP; ₱12,030,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 120; no matching NEP line for this office] 10. Zapote-Alabang Rd - (S03274LZ) Chainage 260 - Chainage 383 (Las Piñas-Muntinlupa DEO): not in the NEP; ₱4,006,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 134; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Las Piñas-Muntinlupa DEO: 1,276 contracts (2016–2025) in public DPWH records; 1,007 recorded as completed and 237 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure, Kantarilla Creek, Las Piñas City (23OI0008): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/1fc8facc-5bd3-4166-8b38-2806d37f5d66 - Construction of Flood Control Structure at Balihatar, Brgy. Manuyo 1, Las Piñas City (22OI0022): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/f3ec8054-ad78-4a97-a2ff-2740750fac51 - Construction of Flood Control Structure, Las Piñas River and Its Tributaries, Las Piñas City (23OI0033): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/e8b9c055-2372-4c53-a624-2411624f6aa5 - Rehabilitation of Drainage System at Brgy. Almanza 2, Las Piñas City (22OI0036): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/0fd09826-2c80-4649-945c-668c97218347 - Construction of Flood Control Structure, Kantarilla Creek, Las Piñas City (22OI0002): Pattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/ece0073f-c41f-4888-8e94-f035459b8886 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/muntinlupa-city-lone
Write your representative · FY2027 budget
City Of Muntinlupa (Lone District)
Representative: Jaime R. Fresnedi · bills and roles · official House profile
Served by: Las Piñas-Muntinlupa DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 19 lines selected.
Las Piñas-Muntinlupa DEO
This district engineering office also serves City Of Las Piñas (Lone District). The budget lines below belong to the office, not to one district.
- House version (HB 10858)
- ₱1.26B
- 65 lines
- President’s NEP
- ₱1.15B
- 63 lines
- Added by the House
- 11
- ₱197.2M
- Changed / removed
- 0 / 8
- 54 lines unchanged
Lines that differ from the NEP (11)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Rehabilitation of Road and Drainage, BFRV, Barangay Talon 2, Las Piñas City | Added by the House | — | ₱40,000,000 | HB p. 440 |
| Construction of Multi-Purpose Building (Covered Court), BarangayTunasan, Muntinlupa City | Added by the House | — | ₱30,000,000 | HB p. 647 |
| Construction of Multi-Purpose Building (Covered Court), Barangay Sucat, Muntinlupa City, 14.4574023, 121.0528488 | Added by the House | — | ₱25,000,000 | HB p. 647 |
| Construction of Flood Control Structure, Bubugan Creek, Muntinlupa City | Added by the House | — | ₱20,000,000 | HB p. 362 |
| Construction of Retaining Wall along Talon Creek (Julio's Compound and PAGIBIG Homes), Barangay Talon 1 and Barangay Talon 4, Las Piñas City | Added by the House | — | ₱20,000,000 | HB p. 363 |
| Construction of Multi-purpose Building (Social Services Area), Bayanan Old Plaza, Muntinlupa City, 14.40963177, 121.04971832 | Added by the House | — | ₱15,000,000 | HB p. 647 |
| Construction of Multi-Purpose Building (Social Services Area), Barangay Alabang, Muntinlupa City, 14.4095884, 121.04997165 | Added by the House | — | ₱15,000,000 | HB p. 647 |
| Construction of Road and Drainage along San Jose Alleys, Barangay Daniel Fajardo, Las Piñas City | Added by the House | — | ₱14,000,000 | HB p. 440 |
| Zapote-Alabang Rd - K0023 + 408 - K0023 + 538 | Added by the House | — | ₱12,030,000 | HB p. 120 |
| Zapote-Alabang Rd - (S03274LZ) Chainage 260 - Chainage 383 | Added by the House | — | ₱4,006,000 | HB p. 134 |
| Paranaque-Sucat Rd - K0020 + 233 - K0020 + 271 | Added by the House | — | ₱2,183,000 | HB p. 120 |
NEP lines with no match in the House version (8)
- Construction of Retaining Wall at Julio ' s Compound (Sta. 0 + 376 - Sta. 0 + 476) Barangay Talon 1, Las Pi ñ as City · ₱20,000,000 · NEP PDF p. 401
- Zapote-Alabang Rd - K0023 + 408 - K0023 + 610 · ₱12,030,000 · NEP PDF p. 209
- Construction of Road including Drainage St Joseph Ave, Barangay Pulanglupa 2, Las Pi ñ as City · ₱9,000,000 · NEP PDF p. 455
- Alabang Viaduct · ₱6,149,000 · NEP PDF p. 134
- MSR Quirino Avenue · ₱5,589,000 · NEP PDF p. 134
- Rehabilitation of Road and Drainage at Renesance Street, Barangay Talon 2, Las Pi ñ as City · ₱5,000,000 · NEP PDF p. 455
- Zapote-Alabang Rd - (S03274LZ) Chainage 245 - Chainage 467 · ₱4,006,000 · NEP PDF p. 219
- Paranaque-Sucat Rd - K0020 + 233 - K0020 + 354 · ₱2,183,000 · NEP PDF p. 209
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,276 contracts from 2016 to 2025 in public DPWH records (₱25.52B): 1,007 recorded as completed, 237 as ongoing. 1,088 have a satellite image check on file. Browse them.
13 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure, Kantarilla Creek, Las Piñas City 23OI0008 · Completed · ₱67.5MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure at Balihatar, Brgy. Manuyo 1, Las Piñas City 22OI0022 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Las Piñas River and Its Tributaries, Las Piñas City 23OI0033 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Rehabilitation of Drainage System at Brgy. Almanza 2, Las Piñas City 22OI0036 · Completed · ₱49.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Kantarilla Creek, Las Piñas City 22OI0002 · Completed · ₱49.0MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
- Construction of Flood Control Structure at Las Piñas River and Its Tributaries, Las Piñas City 22OI0039 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Zapote River, Las Piñas City 23OI0032 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Talon Creek, Las Piñas City 22OI0056 · Completed · ₱46.6MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure at Zapote River, Las Piñas City 22OI0038 · Completed · ₱28.2MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection at Pasong Baka Creek, Brgy. Talon 5, Las Piñas City 22OI0015 · Completed · ₱67.4MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection at Pasong Baka Creek, Las Piñas City 22OI0067 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Rehabilitation of Road and Drainage System, Barangay Pamplona 1, Las Piñas City 22OI0135 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.