Hon. Niko Raul S.J. Daza Representative, Northern Samar (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Northern Samar (First District) Dear Representative Niko Raul S.J. Daza: Good day. I live in Northern Samar (First District), and I would like to ask about some DPWH lines for the Northern Samar 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Multi-Purpose Building , Mondragon, Northern Samar, 12.520214, 124.760949 (Northern Samar 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 852; no matching NEP line for this office] 2. Construction of Road, Barangay Poblacion 5 to Barangay Sawang, Capul, Northern Samar (Northern Samar 1st DEO): NEP ₱8,000,000 → House ₱18,000,000 (up ₱10,000,000). [HB 10858 (3rd Reading) Vol. I-C, p. 588; NEP FY2027 Vol. II-B, PDF p. 541] 3. Completion of Multi-Purpose Building, Mondragon, Northern Samar, 12.520558, 124.760912 (Northern Samar 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 852; no matching NEP line for this office] 4. Construction of Multi-Purpose Building, Bobon, Northern Samar, 12.52535, 124.567633 (Northern Samar 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 852; no matching NEP line for this office] 5. Construction of Multi-Purpose Building , San Isidro, Northern Samar, 12.386384, 124.329555 (Northern Samar 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 852; no matching NEP line for this office] 6. Construction of Multi-Purpose Building, Allen, Northern Samar, 12.5005116, 124.283274 (Northern Samar 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 852; no matching NEP line for this office] 7. Construction of Multi-Purpose Building, Barangay Caragas, Lavezares, Northern Samar, 12.532376. 124.330521 (Northern Samar 1st DEO): not in the NEP; ₱9,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 852; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Northern Samar 1st DEO: 1,006 contracts (2016–2025) in public DPWH records; 739 recorded as completed and 212 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Dalakit Shore Protection, Brgy. Dalakit, Catarman, Northern Samar (22IH0010): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/65c5b6c2-fe22-474b-aa41-aa14901937ed - Construction of Dalakit Shore Protection, Brgy. Dalakit, Catarman, Northern Samar (23IH0109): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/709237a2-0127-400f-a3fc-0f526ba69c22 - Construction of Mondragon Bantayan Old Road Shore Protection, Mondragon, Northern Samar (23IH0116): Cross-Source Mismatch (PhilGEPS vs DPWH). https://lovethephilippines.com/projects/1d97a059-d3a3-4f9c-8019-95e3cd91f790 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/northern-samar-1st
Write your representative · FY2027 budget
Northern Samar (First District)
Representative: Niko Raul S.J. Daza · bills and roles · official House profile
Served by: Northern Samar 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
7 of 8 lines selected.
Northern Samar 1st DEO
- House version (HB 10858)
- ₱679.8M
- 70 lines
- President’s NEP
- ₱610.8M
- 65 lines
- Added by the House
- 6
- ₱69.0M
- Changed / removed
- 1 / 1
- 63 lines unchanged
Lines that differ from the NEP (7)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Multi-Purpose Building , Mondragon, Northern Samar, 12.520214, 124.760949 | Added by the House | — | ₱20,000,000 | HB p. 852 |
| Construction of Road, Barangay Poblacion 5 to Barangay Sawang, Capul, Northern Samar | Increased | ₱8,000,000 | ₱18,000,000 | HB p. 588 NEP PDF p. 541 |
| Completion of Multi-Purpose Building, Mondragon, Northern Samar, 12.520558, 124.760912 | Added by the House | — | ₱10,000,000 | HB p. 852 |
| Construction of Multi-Purpose Building, Bobon, Northern Samar, 12.52535, 124.567633 | Added by the House | — | ₱10,000,000 | HB p. 852 |
| Construction of Multi-Purpose Building , San Isidro, Northern Samar, 12.386384, 124.329555 | Added by the House | — | ₱10,000,000 | HB p. 852 |
| Construction of Multi-Purpose Building, Allen, Northern Samar, 12.5005116, 124.283274 | Added by the House | — | ₱10,000,000 | HB p. 852 |
| Construction of Multi-Purpose Building, Barangay Caragas, Lavezares, Northern Samar, 12.532376. 124.330521 | Added by the House | — | ₱9,000,000 | HB p. 852 |
NEP lines with no match in the House version (1)
- Construction of Road, Barangay Poblacion 5 to Barangay Sawang, Sta. 000 + 715 - Sta. 000 + 995 Capul, Northern Samar · ₱10,000,000 · NEP PDF p. 541
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,006 contracts from 2016 to 2025 in public DPWH records (₱13.62B): 739 recorded as completed, 212 as ongoing. 906 have a satellite image check on file. Browse them.
3 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Dalakit Shore Protection, Brgy. Dalakit, Catarman, Northern Samar 22IH0010 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Dalakit Shore Protection, Brgy. Dalakit, Catarman, Northern Samar 23IH0109 · Completed · ₱22.7MDuplicate or Near-Duplicate Projects
- Construction of Mondragon Bantayan Old Road Shore Protection, Mondragon, Northern Samar 23IH0116 · Completed · ₱3.9MCross-Source Mismatch (PhilGEPS vs DPWH)
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.