Hon. Alfonso Jr. V. Umali Representative, Oriental Mindoro (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Oriental Mindoro (Second District) Dear Representative Alfonso Jr. V. Umali: Good day. I live in Oriental Mindoro (Second District), and I would like to ask about some DPWH lines for the Southern Mindoro DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: (No differences were found between the NEP and the House version for this office.) For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Southern Mindoro DEO: 1,180 contracts (2016–2025) in public DPWH records; 1,095 recorded as completed and 63 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure - Mauhao River, Bagong Sikat Section, Bulalacao, Oriental Mindoro (21EI0172): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/77e7ca2c-b9b6-46c1-b42e-d8cd6a432937 - Construction of Flood Control Structure, Brgy. Balite, Gloria, Oriental Mindoro (22EI0096): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/f9666f68-b7eb-4ad6-9e26-9f02a4838935 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/oriental-mindoro-2nd
Write your representative · FY2027 budget
Oriental Mindoro (Second District)
Representative: Alfonso Jr. V. Umali · bills and roles · official House profile
Served by: Southern Mindoro DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
0 of 0 lines selected.
Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.
Southern Mindoro DEO
- House version (HB 10858)
- ₱653.4M
- 55 lines
- President’s NEP
- ₱653.4M
- 55 lines
- Added by the House
- 0
- ₱0
- Changed / removed
- 0 / 0
- 55 lines unchanged
Every House line for this office matches the NEP line and amount.
Past DPWH contracts under this office
1,180 contracts from 2016 to 2025 in public DPWH records (₱15.67B): 1,095 recorded as completed, 63 as ongoing. 984 have a satellite image check on file. Browse them.
2 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure - Mauhao River, Bagong Sikat Section, Bulalacao, Oriental Mindoro 21EI0172 · Completed · ₱9.9MAwards Very Close to the Budget Ceiling
- Construction of Flood Control Structure, Brgy. Balite, Gloria, Oriental Mindoro 22EI0096 · Completed · ₱19.6MAwards Very Close to the Budget Ceiling
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.