Hon. Rosalie Ang Salvame Representative, Palawan (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Palawan (First District) Dear Representative Rosalie Ang Salvame: Good day. I live in Palawan (First District), and I would like to ask about some DPWH lines for the Palawan 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction/Improvement of Bantulan - Sandoval Airport Access Road, Taytay, Palawan (Palawan 1st DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] 2. Construction of Multi-Purpose Building, Barangay Tenga- tenga, Cuyo, Palawan (Palawan 1st DEO): not in the NEP; ₱44,435,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 782; no matching NEP line for this office] 3. Concreting of Road, Sitio Gue, Barangay San Miguel, Linapacan, Palawan (Palawan 1st DEO): not in the NEP; ₱36,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] 4. Construction of DPWH Palawan 1st Quality Assurance and Laboratory Building, Roxas, Palawan (Palawan 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 927; no matching NEP line for this office] 5. Construction of Road, So. Demegan Barangay Poblacion,Busuanga,Palawan (Palawan 1st DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] 6. Construction of Water System Level II,Barangay San Miguel, Roxas, Palawan (Palawan 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 379; no matching NEP line for this office] 7. Construction of Multi-Purpose Building,Barangay Catep, Dumaran,Palawan (Palawan 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 782; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Palawan 1st DEO: 1,223 contracts (2016–2025) in public DPWH records; 1,088 recorded as completed and 83 as ongoing. I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/palawan-1st
Write your representative · FY2027 budget
Palawan (First District)
Representative: Rosalie Ang Salvame · bills and roles · official House profile
Served by: Palawan 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
7 of 10 lines selected.
Palawan 1st DEO
- House version (HB 10858)
- ₱575.0M
- 52 lines
- President’s NEP
- ₱379.6M
- 44 lines
- Added by the House
- 8
- ₱195.4M
- Changed / removed
- 2 / 0
- 42 lines unchanged
Lines that differ from the NEP (10)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction/Improvement of Bantulan - Sandoval Airport Access Road, Taytay, Palawan | Added by the House | — | ₱50,000,000 | HB p. 547 |
| Construction of Multi-Purpose Building, Barangay Tenga- tenga, Cuyo, Palawan | Added by the House | — | ₱44,435,000 | HB p. 782 |
| Concreting of Road, Sitio Gue, Barangay San Miguel, Linapacan, Palawan | Added by the House | — | ₱36,000,000 | HB p. 547 |
| Construction of DPWH Palawan 1st Quality Assurance and Laboratory Building, Roxas, Palawan | Added by the House | — | ₱20,000,000 | HB p. 927 |
| Construction of Road, So. Demegan Barangay Poblacion,Busuanga,Palawan | Added by the House | — | ₱15,000,000 | HB p. 547 |
| Construction of Water System Level II,Barangay San Miguel, Roxas, Palawan | Added by the House | — | ₱10,000,000 | HB p. 379 |
| Construction of Multi-Purpose Building,Barangay Catep, Dumaran,Palawan | Added by the House | — | ₱10,000,000 | HB p. 782 |
| Construction of Multi-Purpose Building, Barangay Rizal, Roxas, PalawanA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱10,000,000 | HB p. 783 |
| Construction of Multi-Purpose Building, Barangay Tumarbong, Roxas, PalawanMatched to the NEP by a close title, not an exact one. | Reduced | ₱12,000,000 | ₱10,000,000 | HB p. 782 NEP PDF p. 626 (scan reading; check the page) |
| Construction of Multi-Purpose Building, Barangay Magara, Roxas, PalawanMatched to the NEP by a close title, not an exact one. | Increased | ₱10,000,000 | ₱12,000,000 | HB p. 783 NEP PDF p. 626 |
Past DPWH contracts under this office
1,223 contracts from 2016 to 2025 in public DPWH records (₱15.62B): 1,088 recorded as completed, 83 as ongoing. 1,100 have a satellite image check on file. Browse them.
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.