Hon. Jose C. Alvarez Representative, Palawan (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Palawan (Second District) Dear Representative Jose C. Alvarez: Good day. I live in Palawan (Second District), and I would like to ask about some DPWH lines for the Palawan 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Road, Sitio Katutubo, Barangay Punta Baja, Rizal, Palawan (Palawan 2nd DEO): not in the NEP; ₱28,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] 2. Construction of Road, Purok Pagkakaisa, Barangay Punta Baja, Rizal, Palawan (Palawan 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] 3. Construction of Road, Barangay Taritien, Narra, Palawan (Palawan 2nd DEO): not in the NEP; ₱22,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] 4. Construction of Access Road of Narra Integrated School, Narra, Palawan (Palawan 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 547; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Palawan 2nd DEO: 1,218 contracts (2016–2025) in public DPWH records; 1,076 recorded as completed and 101 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Panacan Seawall, Brgy. Panacan, Narra, Palawan (22EF0008): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/e1dc61ed-0579-42b7-8352-3eeb56be936c - Construction of Panacan Seawall, Brgy. Panacan, Municipality of Narra, Palawan (23EF0075): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/82fd7523-6bb6-4b60-aacf-2ecb814dfa45 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/palawan-2nd
Write your representative · FY2027 budget
Palawan (Second District)
Representative: Jose C. Alvarez · bills and roles · official House profile
Served by: Palawan 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
4 of 4 lines selected.
Palawan 2nd DEO
- House version (HB 10858)
- ₱537.8M
- 20 lines
- President’s NEP
- ₱447.8M
- 16 lines
- Added by the House
- 4
- ₱90.0M
- Changed / removed
- 0 / 0
- 16 lines unchanged
Lines that differ from the NEP (4)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Road, Sitio Katutubo, Barangay Punta Baja, Rizal, Palawan | Added by the House | — | ₱28,000,000 | HB p. 547 |
| Construction of Road, Purok Pagkakaisa, Barangay Punta Baja, Rizal, Palawan | Added by the House | — | ₱25,000,000 | HB p. 547 |
| Construction of Road, Barangay Taritien, Narra, Palawan | Added by the House | — | ₱22,000,000 | HB p. 547 |
| Construction of Access Road of Narra Integrated School, Narra, Palawan | Added by the House | — | ₱15,000,000 | HB p. 547 |
Past DPWH contracts under this office
1,218 contracts from 2016 to 2025 in public DPWH records (₱15.79B): 1,076 recorded as completed, 101 as ongoing. 1,078 have a satellite image check on file. Browse them.
2 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Panacan Seawall, Brgy. Panacan, Narra, Palawan 22EF0008 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Construction of Panacan Seawall, Brgy. Panacan, Municipality of Narra, Palawan 23EF0075 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
