Hon. Maria Rachel J. Arenas Representative, Pangasinan (Third District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Pangasinan (Third District) Dear Representative Maria Rachel J. Arenas: Good day. I live in Pangasinan (Third District), and I would like to ask about some DPWH lines for the Pangasinan 4th DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Maramba Br. (B00580LZ) along Sta. Barbara Old Rd (Pangasinan 4th DEO): not in the NEP; ₱33,795,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 280; no matching NEP line for this office] 2. Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Road, K0187+000 - K0188+000 (Pangasinan 4th DEO): not in the NEP; ₱29,860,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 121; no matching NEP line for this office] 3. Sn Carlos - Calasiao Road, K0209+128 - K0210+080 (Pangasinan 4th DEO): not in the NEP; ₱28,340,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 121; no matching NEP line for this office] 4. Judge Jose De Venecia Sr. Avenue Road, K0207+617 - K0207+996 (Pangasinan 4th DEO): not in the NEP; ₱22,588,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 111; no matching NEP line for this office] 5. Sn Carlos - Calasiao Road, K0204+(-1000) - K0204+(-040) (Pangasinan 4th DEO): not in the NEP; ₱20,700,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 121; no matching NEP line for this office] 6. Carmen Jct - Bayambang - Manat Road, K0204+928 - K0206+000 (Pangasinan 4th DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 121; no matching NEP line for this office] 7. Construction of Calasiao Diversion Road, Doña Maria Road, Calasiao, Pangasinan (Pangasinan 4th DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 467; no matching NEP line for this office] 8. Construction of Slope Protection Structure at Barangay Caoayan Bogtong, Malasiqui, Pangasinan (Pangasinan 4th DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 325; no matching NEP line for this office] 9. Rehabilitation of Slope Protection Structure at Barangay Salinap, San Carlos City, Pangasinan (Pangasinan 4th DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 325; no matching NEP line for this office] 10. Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd, K0201+(-200) - K0201+050 (Pangasinan 4th DEO): not in the NEP; ₱11,400,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 150; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Pangasinan 4th DEO: 1,100 contracts (2016–2025) in public DPWH records; 955 recorded as completed and 121 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Slope Protection Works along Agno River, Brgy. Supo, San Carlos City, Pangasinan (22AJ0011): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/c35f645d-8ccf-4bba-b19b-c30523bf1210 - Construction of Slope Protection along Agno River, Barangay Pugo, Bayambang, Pangasinan (Phase II) (24AJ0030): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/4c55fddf-e68f-4d16-b4ea-421b8a178e9e - Construction of Slope Protection along Agno River, Barangay Iton, Bayambang, Pangasinan (Phase II) (24AJ0028): Duplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/c3c90cac-a47b-445e-a236-b777980b17f7 - Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan (Phase II) (24AJ0038): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/b49a2c5d-f560-4b87-899a-58a0664c986f - Construction of Flood Control Structure along Agno River, Pacuan, Malasiqui, Pangasinan (24AJ0021): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/9a9c39c5-e126-490e-bfcb-9cdeed0a46ce I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/pangasinan-3rd
Write your representative · FY2027 budget
Pangasinan (Third District)
Representative: Maria Rachel J. Arenas · bills and roles · official House profile
Served by: Pangasinan 4th DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 39 lines selected.
Letters for this district so far: 1 opened · 0 copied · 0 sent to email. Anonymous totals only; we store no names, emails or IP addresses.
Pangasinan 4th DEO
- House version (HB 10858)
- ₱993.5M
- 82 lines
- President’s NEP
- ₱621.4M
- 49 lines
- Added by the House
- 35
- ₱379.1M
- Changed / removed
- 2 / 2
- 45 lines unchanged
Lines that differ from the NEP (37)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Maramba Br. (B00580LZ) along Sta. Barbara Old Rd | Added by the House | — | ₱33,795,000 | HB p. 280 |
| Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Road, K0187+000 - K0188+000 | Added by the House | — | ₱29,860,000 | HB p. 121 |
| Sn Carlos - Calasiao Road, K0209+128 - K0210+080 | Added by the House | — | ₱28,340,000 | HB p. 121 |
| Judge Jose De Venecia Sr. Avenue Road, K0207+617 - K0207+996 | Added by the House | — | ₱22,588,000 | HB p. 111 |
| Sn Carlos - Calasiao Road, K0204+(-1000) - K0204+(-040) | Added by the House | — | ₱20,700,000 | HB p. 121 |
| Carmen Jct - Bayambang - Manat Road, K0204+928 - K0206+000 | Added by the House | — | ₱20,000,000 | HB p. 121 |
| Construction of Calasiao Diversion Road, Doña Maria Road, Calasiao, Pangasinan | Added by the House | — | ₱20,000,000 | HB p. 467 |
| Construction of Slope Protection Structure at Barangay Caoayan Bogtong, Malasiqui, Pangasinan | Added by the House | — | ₱15,000,000 | HB p. 325 |
| Rehabilitation of Slope Protection Structure at Barangay Salinap, San Carlos City, Pangasinan | Added by the House | — | ₱15,000,000 | HB p. 325 |
| Construction of Slope Protection Structure at Barangay Tayambani, San Carlos City, PangasinanA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱15,000,000 | HB p. 327 |
| Camiling - Wawa - Bayambang - Malasiqui - Sta. Barbara Rd, K0201+(-200) - K0201+050 | Added by the House | — | ₱11,400,000 | HB p. 150 |
| Carmen Jct - Bayambang - Manat Road, K0207+008 - K0207+612 | Added by the House | — | ₱11,275,000 | HB p. 121 |
| Camiling - Wawa - Bayambang - Malasiqui - Sta. barbara Road, K0196+000 - K0196+577 | Added by the House | — | ₱10,800,000 | HB p. 121 |
| Construction of Slope Protection Structure at Barangay San Vicente, Bayambang, PangasinanA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱10,000,000 | HB p. 327 |
| Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd (S05942LZ), K0175+336 - K0175+941 | Added by the House | — | ₱9,596,000 | HB p. 121 |
| Construction of Slope Protection Structure at Barangay San Vicente, Calasiao, PangasinanMatched to the NEP by a close title, not an exact one. | Increased | ₱10,000,000 | ₱18,000,000 | HB p. 325 NEP PDF p. 372 |
| Construction of Road, Barangay Lasip, Malasiqui, Pangasinan | Added by the House | — | ₱8,000,000 | HB p. 467 |
| Construction of Road, Barangay Bacundao West, Malasiqui, Pangasinan | Added by the House | — | ₱8,000,000 | HB p. 467 |
| Villasis - Malasiqui - Sn Carlos Road, K0186+607 - K0186+903 | Added by the House | — | ₱6,216,000 | HB p. 121 |
| Construction of Multi-Purpose Building, Barangay Batangcaoa, Bayambang, Pangasinan | Added by the House | — | ₱6,000,000 | HB p. 682 |
| Villasis-Malasiqui-Sn Carlos Rd (S00026LZ), K0192+018 - K0192+283 | Added by the House | — | ₱5,078,000 | HB p. 121 |
| Construction of Local Road, Barangay Bongato East, Bayambang, Pangasinan | Increased | ₱5,000,000 | ₱10,000,000 | HB p. 467 NEP PDF p. 468 (scan reading; check the page) |
| Construction of Road, Barangay Apaya, Malasiqui, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 467 |
| Construction of Road, Barangay Warey, Bayambang, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 467 |
| Contruction of Local Road, Barangay Telbang, Bayambang, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 467 |
| Construction of Road, Barangay Nalsian, Calasiao, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 467 |
| Construction of Road, Barangay Cabueldatan, Malasiqui, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 467 |
| Construction of Multi-Purpose Building, Barangay Naguilayan, San Carlos City, Pangasinan 15.963213, 120.334897 | Added by the House | — | ₱5,000,000 | HB p. 681 |
| Construction of Multi-Purpose Building, Barangay Pagal, San Carlos City, Pangasinan 15.950175N 120.331978E | Added by the House | — | ₱5,000,000 | HB p. 681 |
| Construction of Multi-Purpose Building, Cabueldatan Elementary School, Malasiqui, Pangasinan 15.895601, 120.408428 | Added by the House | — | ₱5,000,000 | HB p. 681 |
| Construction of Multi-Purpose Building, Alinggan-Banaban Elementary School, Bayambang, Pangasinan 15.836897, 120.415663 | Added by the House | — | ₱5,000,000 | HB p. 681 |
| Construction of Multi-Purpose Building, Tanolong National High School, Bayambang, Pangasinan 15.808961, 120.410791 | Added by the House | — | ₱5,000,000 | HB p. 681 |
| Construction of Multi-Purpose Building, Buenlag 1st Elementary School, Bayambang, Pangasinan 15.833316, 120.464651 | Added by the House | — | ₱5,000,000 | HB p. 681 |
| Construction of Multi-Purpose Building, Barangay Bocboc, San Carlos City, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 682 |
| Construction of Multi-Purpose Building, Barangay Lokeb Norte, Malasiqui, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 682 |
| Construction of Multi-Purpose Building, Barangay Guilig, Malasiqui, Pangasinan | Added by the House | — | ₱5,000,000 | HB p. 682 |
| Construction of Multi-Purpose Building, Barangay Amancosiling Sur, Bayambang, Pangasinan 15.775175, 120.456444 | Added by the House | — | ₱2,500,000 | HB p. 681 |
NEP lines with no match in the House version (2)
- Construction of Road at Barangay Bega (Sitio Cabelew-Manadag ), San Carlos City Pangasinan · ₱10,000,000 · NEP PDF p. 469
- Construction of Multi-Purpose Building, Barangay Nalsian, Calasiao, Pangasinan · ₱10,000,000 · NEP PDF p. 581
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,100 contracts from 2016 to 2025 in public DPWH records (₱15.40B): 955 recorded as completed, 121 as ongoing. 1,067 have a satellite image check on file. Browse them.
36 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Slope Protection Works along Agno River, Brgy. Supo, San Carlos City, Pangasinan 22AJ0011 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection along Agno River, Barangay Pugo, Bayambang, Pangasinan (Phase II) 24AJ0030 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection along Agno River, Barangay Iton, Bayambang, Pangasinan (Phase II) 24AJ0028 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of Slope Protection along Agno River, Barangay San Gabriel 2nd, Bayambang, Pangasinan (Phase II) 24AJ0038 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Agno River, Pacuan, Malasiqui, Pangasinan 24AJ0021 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Protection Works along Agno River, Barangay Tampog, Bayambang, Pangasinan (Phase III) 24AJ0025 · Completed · ₱48.1MSchedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects
- Construction of Slope Protection Works along Ingalera River, Brgy. Dinalaoan, Calasiao, Pangasinan 23AJ0002 · Completed · ₱48.0MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection Works along Agno River, Barangay Guelew, San Carlos City, Pangasinan 24AJ0017 · Completed · ₱47.8MPattern Consistent with Contract Splitting
- Construction of Slope Protection Works along Agno River, Barangay Supo, San Carlos City, Pangasinan 24AJ0004 · Completed · ₱47.6MSchedule / Date Inconsistencies; Pattern Consistent with Contract Splitting
- Construction of Slope Protection Works along Agno River, Barangay Supo, San Carlos City, Pangasinan 23AJ0044 · Completed · ₱47.6MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection Structure along Ingalera River, Brgy. Malimpec, Malasiqui, Pangasinan (Phase V) 24AJ0096 · Completed · ₱24.1MDuplicate or Near-Duplicate Projects
- Construction of Slope Protection Works along San Juan River, Brgy. Turac, San Carlos City, Pangasinan 22AJ0062 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.
