Hon. Keith Micah "Atty. Mike" D.L. Tan Representative, Quezon (Fourth District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Quezon (Fourth District) Dear Representative Keith Micah "Atty. Mike" D.L. Tan: Good day. I live in Quezon (Fourth District), and I would like to ask about some DPWH lines for the Quezon 4th DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Sumulong Br. (B05219LZ) along Maharlika Highway (LZ) (Quezon 4th DEO): not in the NEP; ₱71,736,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 260; no matching NEP line for this office] 2. Pandanan Br. (B02591LZ) along Maharlika Highway (LZ) (Quezon 4th DEO): not in the NEP; ₱57,108,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 260; no matching NEP line for this office] 3. MSR JCT-Lopez-Catanauan Rd - K0232 + 200 - K0232 + 400, K0232 + 450 - K0232 + 600, K0233 + 000 - K0233 + 585, K0233 + 633 - K0233 + 745 (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 126; no matching NEP line for this office] 4. Plaridel By-Pass Road - Sta 2 + 050 - Sta 2 + 060, Sta 2 + 282 - Sta 2 + 307, Sta 2+395 - Sta 2+580, Quezon (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 222; no matching NEP line for this office] 5. Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 2+275 - Sta. 2+464, Sta. 3+089 - Sta. 3+750 (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 234; no matching NEP line for this office] 6. Atimonan-Mauban Road - STA 003+660 - STA 004+460 (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 234; no matching NEP line for this office] 7. Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 11 + 770 - Sta. 12 + 970 (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 234; no matching NEP line for this office] 8. Quezon - Alabat - Perez Circumferential Road - Sta. 23 + 920 - Sta. 24 + 920 (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 234; no matching NEP line for this office] 9. Construction of Road, Barangay Bocboc, Sta. 0+531 - Sta. 1+101, Lopez, Quezon (Quezon 4th DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 542; no matching NEP line for this office] 10. Candelaria Bypass Rd - K0109 + 911 - K0110 + 236 (Quezon 4th DEO): not in the NEP; ₱40,750,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 198; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Quezon 4th DEO: 1,796 contracts (2016–2025) in public DPWH records; 1,612 recorded as completed and 155 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control along Pipisik River, Gumaca, Quezon (22DL0069): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/3416ed88-bb04-4818-8341-5aa679ea788d - Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon, Package B (23DL0101): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/0ceaf43e-e194-4f86-a572-8222860d6c66 - Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon (24DL0064): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/899cae7c-4c9d-46d1-81ab-5d6aad1f11e8 - Construction of Flood Control Structure along Bocboc Creek, Lopez, Quezon (23DL0039): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/0a94b406-1838-480b-bd65-b62952dbd220 - Construction of Flood Control Structure, Talolong River, Lopez, Quezon (23DL0041): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/2dabe57e-ab98-47d6-bbc3-3690381fcc22 I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/quezon-4th
Write your representative · FY2027 budget
Quezon (Fourth District)
Representative: Keith Micah "Atty. Mike" D.L. Tan · bills and roles · official House profile
Served by: Quezon 4th DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
10 of 75 lines selected.
Quezon 4th DEO
- House version (HB 10858)
- ₱1.46B
- 86 lines
- President’s NEP
- ₱816.2M
- 47 lines
- Added by the House
- 55
- ₱1.11B
- Changed / removed
- 4 / 16
- 27 lines unchanged
Lines that differ from the NEP (59)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Sumulong Br. (B05219LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱71,736,000 | HB p. 260 |
| Pandanan Br. (B02591LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱57,108,000 | HB p. 260 |
| MSR JCT-Lopez-Catanauan Rd - K0232 + 200 - K0232 + 400, K0232 + 450 - K0232 + 600, K0233 + 000 - K0233 + 585, K0233 + 633 - K0233 + 745 | Added by the House | — | ₱50,000,000 | HB p. 126 |
| Plaridel By-Pass Road - Sta 2 + 050 - Sta 2 + 060, Sta 2 + 282 - Sta 2 + 307, Sta 2+395 - Sta 2+580, Quezon | Added by the House | — | ₱50,000,000 | HB p. 222 |
| Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 2+275 - Sta. 2+464, Sta. 3+089 - Sta. 3+750 | Added by the House | — | ₱50,000,000 | HB p. 234 |
| Atimonan-Mauban Road - STA 003+660 - STA 004+460 | Added by the House | — | ₱50,000,000 | HB p. 234 |
| Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 11 + 770 - Sta. 12 + 970 | Added by the House | — | ₱50,000,000 | HB p. 234 |
| Quezon - Alabat - Perez Circumferential Road - Sta. 23 + 920 - Sta. 24 + 920 | Added by the House | — | ₱50,000,000 | HB p. 234 |
| Construction of Road, Barangay Bocboc, Sta. 0+531 - Sta. 1+101, Lopez, Quezon | Added by the House | — | ₱50,000,000 | HB p. 542 |
| Candelaria Bypass Rd - K0109 + 911 - K0110 + 236 | Added by the House | — | ₱40,750,000 | HB p. 198 |
| Lopez Bypass Rd - K0216 + (-540) - K0216 + (-163), K0216 + 030 - K0216 + 323, K0217 + 386 - K0217 + 499, K0217 + 725 - K0217 + 775 | Added by the House | — | ₱40,000,000 | HB p. 198 |
| Maligaya Br. (B02568LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱34,137,000 | HB p. 260 |
| Construction of Duhat Bridge and Approaches, Barangay Duhat, STA 002+362 - STA 002+382, Plaridel, Quezon, Phase II | Added by the House | — | ₱28,400,000 | HB p. 541 |
| Construction of Barangay Argosino Bridge and Approaches, STA 005+835 - STA 005+851, Quezon, Quezon, Phase II | Added by the House | — | ₱25,600,000 | HB p. 541 |
| Construction (Continuation) of Multi-Purpose Building, Barangay Maunlad, Gumaca, Quezon | Added by the House | — | ₱25,000,000 | HB p. 777 |
| Talaba Br. (B02569LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱23,542,000 | HB p. 260 |
| MSR Jct-Lopez-Buenavista Rd - K0230 + 900 - K0230 + 940, K0235 + 546 - K0235 + 591, K0235 + 874 - K0235 + 910 | Added by the House | — | ₱23,000,000 | HB p. 171 |
| Quezon-Alabat-Perez Rd - K0003 + 230 - K0003 + 275, K0017 + 670 - K0017 + 800, K0220 + 328 - K0020 + 513 | Added by the House | — | ₱22,005,000 | HB p. 162 |
| Construction of A. Mabini - Sta. Maria Road, Sta. 0+083 - Sta. 0+617, Guinayangan, Quezon | Added by the House | — | ₱20,000,000 | HB p. 541 |
| Construction of Capuluan Tulon to San Isidro Road, Sta. 0+120 - Sta. 0+652, Guinayangan, Quezon | Added by the House | — | ₱20,000,000 | HB p. 541 |
| Construction of Cogorin Ilaya to Binahian B. Barangay Road, Sta. 0+400 - Sta. 1+000, Lopez, Quezon | Added by the House | — | ₱20,000,000 | HB p. 541 |
| Construction of Road Bahay Serena, Sta. 0+000 - Sta. 0+310, Gumaca, Quezon | Added by the House | — | ₱20,000,000 | HB p. 541 |
| Construction of Sto. Niño-Cagascas-Del Rosario Road, Sta. 0+650 - Sta. 0+750, Sta. 3+250 - Sta. 3+385, Sta. 5+520 -Sta. 5+655, Sta. 4+600 - Sta. 4+735, Tagkawayan, Quezon | Added by the House | — | ₱20,000,000 | HB p. 542 |
| Construction (Completion) of Barangay Villa Hiwasayan Bridge and Approaches, STA. 007+700 - STA. 007+725, Guinayangan, Quezon | Added by the House | — | ₱18,000,000 | HB p. 542 |
| Construction (Completion) of Bridge and Approaches, Barangay Villa Gomez, STA 008+005 - STA 008+030, Quezon, Quezon | Added by the House | — | ₱18,000,000 | HB p. 542 |
| Inagbuhan Br. (B02574LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱17,201,000 | HB p. 260 |
| Construction of Duhat-Kulawit Road, Atimonan, Quezon | Added by the House | — | ₱15,750,000 | HB p. 541 |
| Malusak Br. (B04968LZ) along Talaba-Summit-Panaon Rd | Added by the House | — | ₱14,697,000 | HB p. 260 |
| Lumutan Br. (B05218LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱13,897,000 | HB p. 260 |
| Magsaysay Br. (B02566LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱13,330,000 | HB p. 260 |
| Inalakanan Br. (B02590LZ) along Maharlika Highway (LZ) | Added by the House | — | ₱11,469,000 | HB p. 260 |
| Construction of San Rafael-Cawayan Roa, Gumaca, Quezon | Added by the House | — | ₱10,000,000 | HB p. 541 |
| Construction (Completion) of Tunton-Maguibuay Bridge and Approaches, Sta. 0+579 - Sta. 0+649, Sta. 0+679 - Sta. 749, Tagkawayan, Quezon | Added by the House | — | ₱10,000,000 | HB p. 542 |
| Construction of Multi-Purpose Building, Kapaluhan Elementary School, Barangay Kapaluhan, Calauag, Quezon | Added by the House | — | ₱10,000,000 | HB p. 776 |
| Construction of Multi-Purpose Building, Severo Tejada Integrated School, Barangay Mainit Sur, Perez, Quezon | Added by the House | — | ₱10,000,000 | HB p. 776 |
| Construction of Multi-Purpose Building, San Francisco B National High School, San Francisco B, Lopez, Quezon | Added by the House | — | ₱10,000,000 | HB p. 777 |
| Construction of Multi-Purpose Building, Tagbakin Elementary School, Barangay Tagbakin, Atimonan, Quezon | Added by the House | — | ₱8,000,000 | HB p. 777 |
| Construction of Multi-Purpose Building, Rizal Ibaba Elementary School, Barangay Rizal Ibaba, Calauag, Quezon | Added by the House | — | ₱8,000,000 | HB p. 777 |
| Construction (Completion) of Multi-Purpose Building, Barangay Mabanban, Lopez, QuezonA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱8,000,000 | HB p. 777 |
| Construction (Completion) of Multi-Purpose Building, Santa Catalina National High School, Barangay Santa Catalina, Lopez, Quezon | Added by the House | — | ₱7,500,000 | HB p. 776 |
| MSR Jct-Lopez-Buenavista Rd - K0226 + 095 - K0226 + 162, K0226 + 527 - K0226 + 576 | Added by the House | — | ₱7,150,000 | HB p. 153 |
| Rehabilitation of Multi-Purpose Building, Lagay Elementary School, Barangay Lagay, Calauag, Quezon | Added by the House | — | ₱7,000,000 | HB p. 776 |
| Rehabilitation of Multi-Purpose Building, Barangay Tabing Dagat, Gumaca, Quezon | Added by the House | — | ₱7,000,000 | HB p. 777 |
| Construction (Completion) of Multi-Purpose Building, Camohaguin National High School, Barangay Camohaguin, Gumaca Quezon | Added by the House | — | ₱5,000,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Malbog, Tagkawayan, QuezonA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱5,000,000 | HB p. 777 |
| Construction (Completion) of Multi-Purpose Building, Barangay V (Pob.) Quezon, QuezonA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱5,000,000 | HB p. 777 |
| Rehabilitation of Multi-Purpose Building, Gumaca East Central School, Barangay Villa Nava, Gumaca, Quezon | Added by the House | — | ₱4,500,000 | HB p. 777 |
| Construction (Completion) of Multi-Purpose Building, Barangay Rizal, Perez, Quezon | Added by the House | — | ₱4,000,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Manguisian, Lopez, QuezonMatched to the NEP by a close title, not an exact one. | Reduced | ₱8,000,000 | ₱4,000,000 | HB p. 776 NEP PDF p. 623 |
| Construction (Completion) of Multi-Purpose Building, Barangay Poblacion 2, Alabat, Quezon | Added by the House | — | ₱4,000,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Villa Prinsipe, Gumaca, Quezon | Added by the House | — | ₱4,000,000 | HB p. 777 |
| Construction (Completion) of Multi-Purpose Building, Barangay Buenavista, Alabat, Quezon | Added by the House | — | ₱3,000,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Poblacion 2, Quezon, Quezon | Added by the House | — | ₱3,000,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Magsino, Quezon, Quezon | Added by the House | — | ₱3,000,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Villa Mercedes, Quezon, Quezon | Added by the House | — | ₱2,500,000 | HB p. 776 |
| Construction (Completion) of Multi-Purpose Building, Barangay Bamban, Tagkawayan, QuezonMatched to the NEP by a close title, not an exact one. | Increased | ₱7,500,000 | ₱10,000,000 | HB p. 776 NEP PDF p. 623 |
| Construction (Completion) of Multi-Purpose Building, Barangay Katimo, Tagkawayan, QuezonMatched to the NEP by a close title, not an exact one. | Increased | ₱5,000,000 | ₱7,500,000 | HB p. 777 NEP PDF p. 623 |
| MSR Jct-Lopez-Catanauan Rd - K0226 + 425 - K0226 + 444 | Added by the House | — | ₱1,964,000 | HB p. 153 |
| Construction (Completion) of Multi-Purpose Building, Barangay Del Pilar Quezon, QuezonMatched to the NEP by a close title, not an exact one. | Reduced | ₱5,000,000 | ₱4,000,000 | HB p. 776 NEP PDF p. 623 |
NEP lines with no match in the House version (16)
- Gumaca Bypass Road - K0193 + 375 - K0193 + 405, K0194 + 027 - K0194 + 094, Quezon · ₱50,000,000 · NEP PDF p. 290
- Plaridel By-Pass Road - Sta 2 + 050 - Sta 2 + 060, Sta 2 + 282 - Sta 2 + 307, Sta 2 + 400 - Sta 2 + 580, Sta. 3 + 750 - Sta. 4 + 046 Quezon · ₱50,000,000 · NEP PDF p. 291
- Calauag-Guinayangan-Buenavista-Lopez Road - Sta. 2 + 018 - Sta. 2 + 587, Sta. 2 + 787 - Sta. 3 + 088 · ₱50,000,000 · NEP PDF p. 301
- Quezon - Alabat - Perez Circumferential Road - Sta. 21 + 070 - Sta. 21 + 709.67 · ₱50,000,000 · NEP PDF p. 301
- Construction of Road, Barangay Bocboc, Lopez, Quezon · ₱50,000,000 · NEP PDF p. 512
- MSR Jct-Lopez-Buenavista Rd - K0219 + 492 - K0219 + 592, K0222 + 658 - K0222 + 677, K0232 + 024 - K0232 + 110 · ₱45,000,000 · NEP PDF p. 248
- Lopez Bypass Rd - K0216 + (- 540 ) - K0216 + (- 163 ), K0216 + 030 - K0216 + 323, Quezon · ₱40,000,000 · NEP PDF p. 291
- Construction of A. Mabini - Sta. Maria Road, Guinayangan, Quezon · ₱20,000,000 · NEP PDF p. 512
- Construction of Capuluan Tulon to San Isidro Road, Guinayangan, Quezon · ₱20,000,000 · NEP PDF p. 512
- Construction of Cogorin Ilaya to Binahian B. Barangay Road, Lopez, Quezon · ₱20,000,000 · NEP PDF p. 512
- Construction of Road leading to Bahay Serena, Gumaca, Quezon · ₱20,000,000 · NEP PDF p. 512
- Construction of Sto. Ni ñ o-Cagascas-Del Rosario Road, Tagkawayan, Quezon · ₱20,000,000 · NEP PDF p. 512
- Jct MSR-Old Zigzag Rd - K0156 + (- 317.50 ) - K0156 + (- 144.50 ), K0156 + 027 - K0156 + 065, K0156 + 343 - K0156 + 480, K0156 + 644 - K0156 + 800, K0157 + 085 - K0157 + 180, K0158 + 009 - K0158 + 020 · ₱11,287,000 · NEP PDF p. 240
- Quezon-Alabat-Perez Rd - K0009 + 053 - K0009 + 588, K0012 + 097 - K0012 + 181, K0015 + 520 - K0015 + 660, K0016 + 820 - K0016 + 900, K0020 + 328 - K0020 + 582, K0021 + 740 - K0021 + 800, K0027 + 632 - K0027 + 762, K0031 + 383 - K0031 + 434 · ₱10,718,000 · NEP PDF p. 240
- MSR Jct-Lopez-Buenavista Rd - K0221 + 401 - K0221 + 551, K0226 + 540 - K0226 + 563, K0228 + 050 - K0228 + 150, K0229 + 744 - K0229 + 835 · ₱7,150,000 · NEP PDF p. 233
- MSR Jct-Lopez-Catanauan Rd - K0231 + 150 - K0231 + 200, K0232 + 400 - K0232 + · ₱1,964,000 · NEP PDF p. 233
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
1,796 contracts from 2016 to 2025 in public DPWH records (₱31.22B): 1,612 recorded as completed, 155 as ongoing. 1,766 have a satellite image check on file. Browse them.
19 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control along Pipisik River, Gumaca, Quezon 22DL0069 · Completed · ₱92.8MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon, Package B 23DL0101 · Completed · ₱82.0MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon 24DL0064 · Completed · ₱67.5MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Bocboc Creek, Lopez, Quezon 23DL0039 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Talolong River, Lopez, Quezon 23DL0041 · Completed · ₱49.0MDuplicate or Near-Duplicate Projects
- Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon, Package A 23DL0089 · Completed · ₱44.1MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Talolong River, Lopez, Quezon 22DL0145 · Completed · ₱29.4MDuplicate or Near-Duplicate Projects
- Construction of Seawall Atimonan, Quezon 22DL0148 · Completed · ₱24.5MDuplicate or Near-Duplicate Projects
- Construction of Breakwater Alabat, Quezon 23DL0083 · Completed · ₱24.5MDuplicate or Near-Duplicate Projects
- Construction of Flood Control along Bocboc Creek, Lopez, Quezon 22DL0061 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
- Construction of Flood Control and Drainage Structure along Pipisik River, Gumaca, Quezon 22DL0070 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure along Maling River, Atimonan, Quezon 22DL0072 · Completed · ₱19.6MDuplicate or Near-Duplicate Projects
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.