← All districts

Write your representative · FY2027 budget

Samar (Second District)

Representative: Reynolds Michael T. Tan · bills and roles · official House profile

Served by: Samar 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 10 lines selected.

Hon. Reynolds Michael T. Tan
Representative, Samar (Second District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Samar (Second District)

Dear Representative Reynolds Michael T. Tan:

Good day. I live in Samar (Second District), and I would like to ask about some DPWH lines for the Samar 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Road, Barangay Malino to Barangay Jidanao to Barangay Nagbac to Barangay Casapa, Jiabong Samar (Sta. 1 + 333.5 - Sta. 2+200) (Samar 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 592; no matching NEP line for this office]
2. Construction of Road, Barangay Pacao - Barangay Banquil, Villareal, Samar (Sta. 0+000.00 - 0+860.00) (Samar 2nd DEO): not in the NEP; ₱40,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office]
3. Construction of Multi-Purpose Building, Barangay Sawa, Basey, Samar, (11.312437, 125.087217) (Samar 2nd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 855; no matching NEP line for this office]
4. Construction of Access Road leading to Sports Complex in Catbalogan City, Samar , Sta. 0+000.00 - Sta. 0+230.00 (Samar 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 591; no matching NEP line for this office]
5. Construction of Multi-purpose Building, Paranas, Samar (11.7689, 125.0221) (Samar 2nd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 855; no matching NEP line for this office]
6. Construction of Access Road, New DPWH Building, Samar 2nd DEO, Catbalogan City, Samar, Start 11.757841, 124.9057 End 11.75784, 124.9057 (Samar 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 592; no matching NEP line for this office]
7. Rehabilitation / Strengthening of Bridge, Tinoon Steel Bridge, Barangay Lokilokon, Paranas, Samar, 11.802441, 125.102497 (Samar 2nd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 592; no matching NEP line for this office]
8. Rehabilitation of Multi Purpose Building, Barangay 5, Catbalogan City, Samar (Samar 2nd DEO): not in the NEP; ₱13,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 855; no matching NEP line for this office]
9. Rehabilitation of Multi Purpose Building, Barangay Payao, Catbalogan City, Samar, 11.80411944, 124.8656972 (Samar 2nd DEO): not in the NEP; ₱11,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 855; no matching NEP line for this office]
10. Construction of Multi-Purpose Building, Barangay Payao, Catbalogan City, Samar, (11.80411944, 124.8656972) (Samar 2nd DEO): not in the NEP; ₱5,500,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 855; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Samar 2nd DEO: 730 contracts (2016–2025) in public DPWH records; 471 recorded as completed and 207 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Tide Embankment Brgy Catadman, Basey, Samar (22IK0051): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/8aa2cd7d-b956-4175-93b3-63f36b2659ce
- Construction of Coastal Dike/Shoreline Protection (Esplanade) in Barangay Poblacion, Villareal, Samar (22IK0053): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/3c22ac3a-0ba9-424a-8a3a-06c0b269eedc
- Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar (23IK0021): Schedule / Date Inconsistencies; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/8b28306c-42ca-42f3-877b-072d53c839fd
- Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar (23IK0017): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/511c46f8-a673-4c43-aa89-ad7edc3bd8c1
- Construction of Flood Control Protection works Structure, Golden Bridge, San Juanico Basey- Sohoton Road, Basey, Samar (22IK0032): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/e3b8aad1-95d3-4eef-921e-34e8a6fbd511

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/samar-2nd

Samar 2nd DEO

House version (HB 10858)
₱294.5M
14 lines
President’s NEP
₱80.0M
4 lines
Added by the House
10
₱214.5M
Changed / removed
0 / 0
4 lines unchanged
Lines that differ from the NEP (10)
LineChangeNEPHouseSources
Construction of Road, Barangay Malino to Barangay Jidanao to Barangay Nagbac to Barangay Casapa, Jiabong Samar (Sta. 1 + 333.5 - Sta. 2+200)Added by the House—₱50,000,000HB p. 592
Construction of Road, Barangay Pacao - Barangay Banquil, Villareal, Samar (Sta. 0+000.00 - 0+860.00)Added by the House—₱40,000,000HB p. 591
Construction of Multi-Purpose Building, Barangay Sawa, Basey, Samar, (11.312437, 125.087217)Added by the House—₱25,000,000HB p. 855
Construction of Access Road leading to Sports Complex in Catbalogan City, Samar , Sta. 0+000.00 - Sta. 0+230.00Added by the House—₱20,000,000HB p. 591
Construction of Multi-purpose Building, Paranas, Samar (11.7689, 125.0221)Added by the House—₱20,000,000HB p. 855
Construction of Access Road, New DPWH Building, Samar 2nd DEO, Catbalogan City, Samar, Start 11.757841, 124.9057 End 11.75784, 124.9057Added by the House—₱15,000,000HB p. 592
Rehabilitation / Strengthening of Bridge, Tinoon Steel Bridge, Barangay Lokilokon, Paranas, Samar, 11.802441, 125.102497Added by the House—₱15,000,000HB p. 592
Rehabilitation of Multi Purpose Building, Barangay 5, Catbalogan City, SamarAdded by the House—₱13,000,000HB p. 855
Rehabilitation of Multi Purpose Building, Barangay Payao, Catbalogan City, Samar, 11.80411944, 124.8656972Added by the House—₱11,000,000HB p. 855
Construction of Multi-Purpose Building, Barangay Payao, Catbalogan City, Samar, (11.80411944, 124.8656972)Added by the House—₱5,500,000HB p. 855

Past DPWH contracts under this office

730 contracts from 2016 to 2025 in public DPWH records (₱17.41B): 471 recorded as completed, 207 as ongoing. 647 have a satellite image check on file. Browse them.

6 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.