← All districts

Write your representative · FY2027 budget

South Cotabato (First District)

Representative: Isidro D. Lumayag · bills and roles · official House profile

Served by: South Cotabato 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 23 lines selected.

Hon. Isidro D. Lumayag
Representative, South Cotabato (First District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for South Cotabato (First District)

Dear Representative Isidro D. Lumayag:

Good day. I live in South Cotabato (First District), and I would like to ask about some DPWH lines for the South Cotabato 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Concrete Road with Drainage, Purok Balakayo, Olympog, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
2. Construction of Concrete Road with Drainage, Fabian Natad, Barangay Lagao, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
3. Construction of Concrete Road, Purok 3, Barangay Olympog, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
4. Construction of Multi-Purpose Building at Mindanao State University–General Santos City (South Cotabato 1st DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 892; no matching NEP line for this office]
5. Construction of Concrete Road, FVR Road, Brangay Tambler, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
6. Construction of Concrete Road, Purok Nopol Road, Barangay Conel, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
7. Construction of Concrete Road, Guinto St., Barangay San Isidro, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱13,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
8. Construction of Concrete Road, Salinda St., Barangay Lagao, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱13,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]
9. Construction of Water System at Purok Gawan, Barangay San Jose, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 392; no matching NEP line for this office]
10. Construction of Concrete Road, Jct. Albert Morrow Blvd. connecting to Marcos Avenue, Barangay Sinawal, General Santos City (South Cotabato 1st DEO): not in the NEP; ₱10,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 613; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- South Cotabato 1st DEO: 1,329 contracts (2016–2025) in public DPWH records; 1,251 recorded as completed and 62 as ongoing.

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/south-cotabato-1st

South Cotabato 1st DEO

This district engineering office also serves General Santos City (Lone District). The budget lines below belong to the office, not to one district.

House version (HB 10858)
₱429.2M
28 lines
President’s NEP
₱177.2M
7 lines
Added by the House
22
₱296.0M
Changed / removed
0 / 1
6 lines unchanged
Lines that differ from the NEP (22)
LineChangeNEPHouseSources
Construction of Concrete Road with Drainage, Purok Balakayo, Olympog, General Santos CityAdded by the House—₱50,000,000HB p. 613
Construction of Concrete Road with Drainage, Fabian Natad, Barangay Lagao, General Santos CityAdded by the House—₱20,000,000HB p. 613
Construction of Concrete Road, Purok 3, Barangay Olympog, General Santos CityAdded by the House—₱20,000,000HB p. 613
Construction of Multi-Purpose Building at Mindanao State University–General Santos CityAdded by the House—₱20,000,000HB p. 892
Construction of Concrete Road, FVR Road, Brangay Tambler, General Santos CityAdded by the House—₱15,000,000HB p. 613
Construction of Concrete Road, Purok Nopol Road, Barangay Conel, General Santos CityAdded by the House—₱15,000,000HB p. 613
Construction of Concrete Road, Guinto St., Barangay San Isidro, General Santos CityAdded by the House—₱13,000,000HB p. 613
Construction of Concrete Road, Salinda St., Barangay Lagao, General Santos CityAdded by the House—₱13,000,000HB p. 613
Construction of Water System at Purok Gawan, Barangay San Jose, General Santos CityAdded by the House—₱10,000,000HB p. 392
Construction of Concrete Road, Jct. Albert Morrow Blvd. connecting to Marcos Avenue, Barangay Sinawal, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road, Purok Paradise, Barangay City Heights, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road, Perez Avenue, Barangay San Isidro, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road with Drainage, Lower Lot 1 Sogod, Barangay Apopong, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road, Purok 6, Lower Labay to Upper Labay, Barangay Tinagacan, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road, Purok 11, Barangay Katangawan, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road, Purok 15, Barangay Tinagacan, General Santos CityAdded by the House—₱10,000,000HB p. 613
Construction of Concrete Road, Purok 28, Barangay Mabuhay, General Santos CityAdded by the House—₱10,000,000HB p. 614
Construction of Concrete Road, Aviation Road, Purok San Lorenzo, Barangay Apopong, General Santos CityAdded by the House—₱10,000,000HB p. 614
Construction of Multi-Purpose Building, Purok Sagrado, Barangay Poblacion, Polomolok, South CotabatoAdded by the House—₱10,000,000HB p. 892
Construction of Multi-purpose Building in National High-way Lower Poblacion, Tupi, South CotabatoAdded by the House—₱10,000,000HB p. 892
Construction of Multi-purpose Building (Covered Court), Purok 8, Barangay Kinilis, Polomolok, South CotabatoAdded by the House—₱5,000,000HB p. 892
Construction of Multi-purpose Building (Covered Court), Purok Lapid, Barangay Magsaysay, Polomolok, South CotabatoAdded by the House—₱5,000,000HB p. 892
NEP lines with no match in the House version (1)
  • Albert Morrow Blvd - K1666 + 895 - K1667 + 322.16 · ₱43,985,000 · NEP PDF p. 216

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

1,329 contracts from 2016 to 2025 in public DPWH records (₱16.97B): 1,251 recorded as completed, 62 as ongoing. 1,227 have a satellite image check on file. Browse them.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.