Hon. Ruth M. Sakaluran Representative, Sultan Kudarat (First District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Sultan Kudarat (First District) Dear Representative Ruth M. Sakaluran: Good day. I live in Sultan Kudarat (First District), and I would like to ask about some DPWH lines for the Sultan Kudarat 1st DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Road, Junction National Highway to Lasedeco Road, Barangay Kalawag I, Isulan, Sultan Kudarat (Sultan Kudarat 1st DEO): not in the NEP; ₱22,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 617; no matching NEP line for this office] 2. Construction of Road, Chua Road, Barangay Kalawag II, Isulan, Sultan Kudarat (Sultan Kudarat 1st DEO): not in the NEP; ₱16,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 616; no matching NEP line for this office] 3. Construction of Road, from Canja Street to Manua Street, Barangay Kalawag 1, Isulan, Sultan Kudarat (Sultan Kudarat 1st DEO): not in the NEP; ₱5,860,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 616; no matching NEP line for this office] 4. Construction of Road, Panes-Gacayan Street, Barangay Kalawag I, Isulan, Sultan Kudarat (Sultan Kudarat 1st DEO): not in the NEP; ₱5,780,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 616; no matching NEP line for this office] 5. Construction of Road, Gabion Street, Barangay Kalawag I, Isulan, Sultan Kudarat (Sultan Kudarat 1st DEO): not in the NEP; ₱5,147,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 616; no matching NEP line for this office] 6. Construction of Road, from Leonora to Isulan National High School Road, Barangay Kalawag II, Isulan, Sultan Kudarat (Sultan Kudarat 1st DEO): not in the NEP; ₱5,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 617; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Sultan Kudarat 1st DEO: 706 contracts (2016–2026) in public DPWH records; 645 recorded as completed and 47 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Flood Control Structure, Ala River (Impao Section), Isulan, Sultan Kudarat (22MF0011): Pattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/ef6531e5-df33-401b-82c5-1f53ae1ecbaa - Construction of Flood Control Structure, Ala River Basin (Panas-Bambad Section), Isulan, Sultan Kudarat (23MF0014): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/677b1870-a131-44b4-aeaf-ed0ec4a5014b - Construction of Flood Control Structure, Ala River (Madanding Section), Lambayong, Sultan Kudarat (22MF0013): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/464b9551-acfc-4554-ad88-c946b1c1b7a3 - Construction of Flood Control Structure, Banga River (Sampao Section), Isulan, Sultan Kudarat (23MF0017): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/558bb891-8656-4d14-91fe-8b015e55fb2d - Construction of Flood Control Structure, Ala River (Dansuli Section), Isulan, Sultan Kudarat (22MF0010): Pattern Consistent with Contract Splitting. https://lovethephilippines.com/projects/a12c996e-7128-4697-a75e-b51a5672fb0f I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/sultan-kudarat-1st
Write your representative · FY2027 budget
Sultan Kudarat (First District)
Representative: Ruth M. Sakaluran · bills and roles · official House profile
Served by: Sultan Kudarat 1st DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
6 of 8 lines selected.
Sultan Kudarat 1st DEO
- House version (HB 10858)
- ₱680.4M
- 35 lines
- President’s NEP
- ₱663.6M
- 31 lines
- Added by the House
- 6
- ₱59.8M
- Changed / removed
- 0 / 2
- 29 lines unchanged
Lines that differ from the NEP (6)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Road, Junction National Highway to Lasedeco Road, Barangay Kalawag I, Isulan, Sultan Kudarat | Added by the House | — | ₱22,000,000 | HB p. 617 |
| Construction of Road, Chua Road, Barangay Kalawag II, Isulan, Sultan Kudarat | Added by the House | — | ₱16,000,000 | HB p. 616 |
| Construction of Road, from Canja Street to Manua Street, Barangay Kalawag 1, Isulan, Sultan Kudarat | Added by the House | — | ₱5,860,000 | HB p. 616 |
| Construction of Road, Panes-Gacayan Street, Barangay Kalawag I, Isulan, Sultan Kudarat | Added by the House | — | ₱5,780,000 | HB p. 616 |
| Construction of Road, Gabion Street, Barangay Kalawag I, Isulan, Sultan Kudarat | Added by the House | — | ₱5,147,000 | HB p. 616 |
| Construction of Road, from Leonora to Isulan National High School Road, Barangay Kalawag II, Isulan, Sultan Kudarat | Added by the House | — | ₱5,000,000 | HB p. 617 |
NEP lines with no match in the House version (2)
- Construction of Concrete Road, National Highway to Purok Mangudadatu, Barangay Dansuli, Isulan, Sultan Kudarat · ₱27,000,000 · NEP PDF p. 555
- Construction of Road, Sitio New Ega ñ a, Barangay D ' Lotilla, Isulan, Sultan Kudarat to Barangay Dukay, Esperanza, Sultan Kudarat · ₱16,000,000 · NEP PDF p. 556
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
706 contracts from 2016 to 2026 in public DPWH records (₱12.79B): 645 recorded as completed, 47 as ongoing. 652 have a satellite image check on file. Browse them.
18 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Flood Control Structure, Ala River (Impao Section), Isulan, Sultan Kudarat 22MF0011 · Completed · ₱49.0MPattern Consistent with Contract Splitting; Duplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Ala River Basin (Panas-Bambad Section), Isulan, Sultan Kudarat 23MF0014 · Completed · ₱48.8MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Ala River (Madanding Section), Lambayong, Sultan Kudarat 22MF0013 · Completed · ₱48.8MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Banga River (Sampao Section), Isulan, Sultan Kudarat 23MF0017 · Completed · ₱48.8MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Ala River (Dansuli Section), Isulan, Sultan Kudarat 22MF0010 · Completed · ₱48.7MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Ala River (Panas-Bambad Section), Isulan, Sultan Kudarat 22MF0014 · Completed · ₱47.7MDuplicate or Near-Duplicate Projects
- Construction of Flood Control Structure, Sitio Taga, Barangay Tinumigues, Lambayong, Sultan Kudarat 21MF0056 · Completed · ₱45.7MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Barangay Udtong Proper, Lambayong, Sultan Kudarat 21MF0055 · Completed · ₱45.3MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Sitio Concepcion, Barangay Tinumigues, Lambayong, Sultan Kudarat 21MF0058 · Completed · ₱45.2MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Ala River (Kolambog - Bambad), Isulan, Sultan Kudarat 24MF0022 · Completed · ₱45.2MDuplicate or Near-Duplicate Projects; Pattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Ala River (D'Lotilla - Bual), Isulan, Sultan Kudarat 24MF0018 · Completed · ₱45.0MPattern Consistent with Contract Splitting
- Construction of Flood Control Structure, Ala River (Impao - Allah Bridge), Isulan, Sultan Kudarat 24MF0019 · Completed · ₱45.0MPattern Consistent with Contract Splitting
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.