Hon. Alexander Ty Pimentel Representative, Surigao Del Sur (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Surigao Del Sur (Second District) Dear Representative Alexander Ty Pimentel: Good day. I live in Surigao Del Sur (Second District), and I would like to ask about some DPWH lines for the Surigao del Sur 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: (No differences were found between the NEP and the House version for this office.) For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Surigao del Sur 2nd DEO: 830 contracts (2016–2026) in public DPWH records; 754 recorded as completed and 49 as ongoing. Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for: - Construction of Bank Revetment along Bislig River (Burboanan Section), Bislig City, Surigao del Sur (24NI0051): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/19bd2500-39de-42f5-8234-957693f16345 - Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Road, Surigao del Sur (23NI0052): Duplicate or Near-Duplicate Projects. https://lovethephilippines.com/projects/8a0c5ef1-abbb-4c16-9fe4-7d75dd71a781 - Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+750 (22NI0069): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/1a68edbf-1ff9-4b99-863c-b8880381e0b0 - Construction of River Bank Protection along Hinatuan River, Surigao del Sur (21NI0062): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/71133c2d-d5df-41c4-a4b2-c55a8f9054eb I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/surigao-del-sur-2nd
Write your representative · FY2027 budget
Surigao Del Sur (Second District)
Representative: Alexander Ty Pimentel · bills and roles · official House profile
Served by: Surigao del Sur 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
0 of 0 lines selected.
Surigao del Sur 2nd DEO
- House version (HB 10858)
- ₱655.5M
- 35 lines
- President’s NEP
- ₱655.5M
- 35 lines
- Added by the House
- 0
- ₱0
- Changed / removed
- 0 / 0
- 35 lines unchanged
Every House line for this office matches the NEP line and amount.
Past DPWH contracts under this office
830 contracts from 2016 to 2026 in public DPWH records (₱17.68B): 754 recorded as completed, 49 as ongoing. 724 have a satellite image check on file. Browse them.
4 past contracts marked by public-data indicators
Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.
- Construction of Bank Revetment along Bislig River (Burboanan Section), Bislig City, Surigao del Sur 24NI0051 · Completed · ₱96.5MDuplicate or Near-Duplicate Projects · satellite before / after
- Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Road, Surigao del Sur 23NI0052 · Completed · ₱77.2MDuplicate or Near-Duplicate Projects
- Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 -K1508+750 22NI0069 · Completed · ₱96.4MAwards Very Close to the Budget Ceiling · satellite before / after
- Construction of River Bank Protection along Hinatuan River, Surigao del Sur 21NI0062 · Completed · ₱39.0MAwards Very Close to the Budget Ceiling
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.