← All districts

Write your representative · FY2027 budget

Zamboanga Del Norte (Third District)

Representative: Adrian Michael A. Amatong · bills and roles · official House profile

Served by: Zamboanga del Norte 3rd DEO; Zamboanga del Norte 4th DEO. Committee memberships are not shown because the House has not published a machine-readable list.

Language / Wika

Tone

Lines to include

Sign it (stays in your browser; nothing is sent or saved)

Open in email

We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.

10 of 19 lines selected.

Hon. Adrian Michael A. Amatong
Representative, Zamboanga Del Norte (Third District)
House of Representatives

Subject: Request for explanation and documents on FY2027 DPWH budget lines for Zamboanga Del Norte (Third District)

Dear Representative Adrian Michael A. Amatong:

Good day. I live in Zamboanga Del Norte (Third District), and I would like to ask about some DPWH lines for the Zamboanga del Norte 3rd DEO and Zamboanga del Norte 4th DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following:

1. Construction of Multi-Purpose Building in Godod, Zamboanga del Norte, 8.006772, 122.844892 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
2. Construction of Multi-Purpose Building (DSWD-SWADT), Liloy, Zamboanga Del Norte, 8.122048, 122.675668 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱25,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
3. Construction of Multi-Purpose Building in Kalawit, Zamboanga del Norte, 7.906022, 122.522743 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱20,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
4. Completion of Multi-Purpose Building in Salug, Zamboanga del Norte, 8.10778, 122.75749 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱15,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
5. Rehabilitation of Punta Barangay Site - Purok 7, Barangay Punta, Liloy, Zamboanga del Norte, 8.03833600, 122.67463300 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱7,150,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 594; no matching NEP line for this office]
6. Construction of Multi-Purpose Building, in Barangay Lopoc, Labason, Zamboanga del Norte (Zamboanga del Norte 3rd DEO): not in the NEP; ₱7,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
7. Construction of Multi-Purpose Building in Barangay Poblacion, Tampilisan, Zamboanga del Norte, 7.974596, 122.664029 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱6,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
8. Construction of Multi-Purpose Bldg in Liloy, Zamboanga del Norte, 8.133699, 122.660502 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱6,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
9. Rehabilitation/Completion of Multi-Purpose Building in Siocon, Zamboanga del Norte, 7.706657, 122.135133 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱4,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]
10. Completion of Multi-Purpose Building in Barangay Malambuhangin, Siocon, Zamboanga del Norte,7.616604, 122.125952 (Zamboanga del Norte 3rd DEO): not in the NEP; ₱4,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 859; no matching NEP line for this office]

For each line above, may I ask for:
1. The reason or basis for adding, increasing, reducing or removing it, and who requested it;
2. The feasibility study, program of work, or detailed engineering design, if one exists;
3. The exact location and the expected beneficiaries; and
4. Any earlier projects at the same location and their status.

For context, this is what public DPWH records show for past projects:
- Zamboanga del Norte 3rd DEO: 836 contracts (2016–2026) in public DPWH records; 708 recorded as completed and 94 as ongoing.
- Zamboanga del Norte 4th DEO: 129 contracts (2023–2025) in public DPWH records; 85 recorded as completed and 39 as ongoing.
Some of these were marked by automated indicators on public data. These are not findings of wrongdoing; I would only like an explanation for:
- Construction of Flood Control Structure (Revetment/Bank Protection) along Layawan River, Dapdap Bridge (Labrador Section), Polanco, Zamboanga del Norte (22JD0060): Awards Very Close to the Budget Ceiling. https://lovethephilippines.com/projects/8953d476-813f-469b-93af-96d418f3ff8c

I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply.

Respectfully,
[Your name]
[Barangay, city or municipality]

—
Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/zamboanga-del-norte-3rd

Zamboanga del Norte 3rd DEO

House version (HB 10858)
₱657.6M
45 lines
President’s NEP
₱594.0M
35 lines
Added by the House
12
₱127.2M
Changed / removed
0 / 2
33 lines unchanged
Lines that differ from the NEP (12)
LineChangeNEPHouseSources
Construction of Multi-Purpose Building in Godod, Zamboanga del Norte, 8.006772, 122.844892Added by the House—₱25,000,000HB p. 859
Construction of Multi-Purpose Building (DSWD-SWADT), Liloy, Zamboanga Del Norte, 8.122048, 122.675668Added by the House—₱25,000,000HB p. 859
Construction of Multi-Purpose Building in Kalawit, Zamboanga del Norte, 7.906022, 122.522743Added by the House—₱20,000,000HB p. 859
Completion of Multi-Purpose Building in Salug, Zamboanga del Norte, 8.10778, 122.75749Added by the House—₱15,000,000HB p. 859
Rehabilitation of Punta Barangay Site - Purok 7, Barangay Punta, Liloy, Zamboanga del Norte, 8.03833600, 122.67463300Added by the House—₱7,150,000HB p. 594
Construction of Multi-Purpose Building, in Barangay Lopoc, Labason, Zamboanga del NorteAdded by the House—₱7,000,000HB p. 859
Construction of Multi-Purpose Building in Barangay Poblacion, Tampilisan, Zamboanga del Norte, 7.974596, 122.664029Added by the House—₱6,000,000HB p. 859
Construction of Multi-Purpose Bldg in Liloy, Zamboanga del Norte, 8.133699, 122.660502Added by the House—₱6,000,000HB p. 859
Rehabilitation/Completion of Multi-Purpose Building in Siocon, Zamboanga del Norte, 7.706657, 122.135133Added by the House—₱4,000,000HB p. 859
Completion of Multi-Purpose Building in Barangay Malambuhangin, Siocon, Zamboanga del Norte,7.616604, 122.125952Added by the House—₱4,000,000HB p. 859
Rehabilitation/Completion of Multi-Purpose Building (Building 1), Liloy, Zamboanga del Norte, 8.121807, 122.675024Added by the House—₱4,000,000HB p. 859
Rehabilitation/Completion of Multi-Purpose Building, Labason, Zamboanga del NorteAdded by the House—₱4,000,000HB p. 859
NEP lines with no match in the House version (2)
  • Construction of Flood Control Structure at Talinga River (Downstream ), Leon T. Postigo, Zamboanga del Norte · ₱38,600,000 · NEP PDF p. 391
  • Labason ByPass Road, Labason, Zamboanga del Norte · ₱25,000,000 · NEP PDF p. 292

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

836 contracts from 2016 to 2026 in public DPWH records (₱11.97B): 708 recorded as completed, 94 as ongoing. 821 have a satellite image check on file. Browse them.

1 past contracts marked by public-data indicators

Indicators are automated statistical checks on public data. They are not findings of wrongdoing, and a marked contract may have a full explanation.

Zamboanga del Norte 4th DEO

House version (HB 10858)
₱1.04B
41 lines
President’s NEP
₱1.22B
46 lines
Added by the House
0
₱0
Changed / removed
0 / 5
41 lines unchanged

Every House line for this office matches the NEP line and amount.

NEP lines with no match in the House version (5)
  • Siocon-Sirawai-Sibuco-Limpapa Rd - K2100 + 000 - K2102 + 000 · ₱49,710,000 · NEP PDF p. 273
  • Siocon-Sirawai Rd - K2075 + 000 - K2076 + 645 · ₱40,836,000 · NEP PDF p. 273
  • Siocon-Sirawai Rd - K2078 + 600 - K2080 + 000 · ₱37,630,000 · NEP PDF p. 273
  • Construction of Road, Barangay Mamad, Baliguian, Zamboanga del Norte · ₱25,000,000 · NEP PDF p. 546
  • Construction of Road, NH Lower Tan-awan - Barangay Poblacion, Barangay Tan-awan, Baliguian, Zamboanga del Norte · ₱25,000,000 · NEP PDF p. 546

A line can look removed when the House reworded its title. Treat these as questions.

Past DPWH contracts under this office

129 contracts from 2023 to 2025 in public DPWH records (₱3.22B): 85 recorded as completed, 39 as ongoing. 125 have a satellite image check on file. Browse them.

How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.

Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.