Hon. Marlesa "Doc Marly" Hofer-Hasim Representative, Zamboanga Sibugay (Second District) House of Representatives Subject: Request for explanation and documents on FY2027 DPWH budget lines for Zamboanga Sibugay (Second District) Dear Representative Marlesa "Doc Marly" Hofer-Hasim: Good day. I live in Zamboanga Sibugay (Second District), and I would like to ask about some DPWH lines for the Zamboanga Sibugay 2nd DEO in the FY2027 budget. When I compared the National Expenditure Program (NEP) with House Bill No. 10858 (third reading), I noticed the following: 1. Construction of Flood Control Structure along Sibuguey River, Siay, Zamboanga Sibugay 0 + 000 to 0 + 245 (Zamboanga Sibugay 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 365; no matching NEP line for this office] 2. Construction of River Wall along the Sibuguey River, Barangay Minsulao to Barangay Paruk, Siay, Zamboanga Sibugay 0 + 000 to 0 + 228 (Zamboanga Sibugay 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 365; no matching NEP line for this office] 3. Construction of Access Road, Barangay Sta Clara, Naga - Barangay Banker, Kabasalan, Zamboanga Sibugay (Zamboanga Sibugay 2nd DEO): not in the NEP; ₱50,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 598; no matching NEP line for this office] 4. Construction of Access Road, Barangay Ipil Heights, Ipil, Zamboanga Sibugay (Zamboanga Sibugay 2nd DEO): not in the NEP; ₱30,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 598; no matching NEP line for this office] 5. Completion of Multi-Purpose Building, Barangay Poblacion, Ipil, Zamboanga Sibugay (Zamboanga Sibugay 2nd DEO): not in the NEP; ₱8,000,000 in the House version. [HB 10858 (3rd Reading) Vol. I-C, p. 863; no matching NEP line for this office] For each line above, may I ask for: 1. The reason or basis for adding, increasing, reducing or removing it, and who requested it; 2. The feasibility study, program of work, or detailed engineering design, if one exists; 3. The exact location and the expected beneficiaries; and 4. Any earlier projects at the same location and their status. For context, this is what public DPWH records show for past projects: - Zamboanga Sibugay 2nd DEO: 899 contracts (2016–2025) in public DPWH records; 815 recorded as completed and 70 as ongoing. I am asking only for information and am not alleging any wrongdoing. Thank you for your time and your reply. Respectfully, [Your name] [Barangay, city or municipality] — Sources: House Bill No. 10858, third reading, Vol. I-C (DPWH); National Expenditure Program FY2027, Vol. II-B (DBM). Data as of 2026-10-31. Page numbers are given on each line. Prepared with https://lovethephilippines.com/write-your-rep/zamboanga-sibugay-2nd
Write your representative · FY2027 budget
Zamboanga Sibugay (Second District)
Representative: Marlesa "Doc Marly" Hofer-Hasim · bills and roles · official House profile
Served by: Zamboanga Sibugay 2nd DEO. Committee memberships are not shown because the House has not published a machine-readable list.
Language / Wika
Tone
Lines to include
Sign it (stays in your browser; nothing is sent or saved)
We do not have a sourced email address for this office, so the email opens with the “To” field blank. Find the office’s contact details on the official House profile. Long letters are shortened in the email link; use Copy for the full text.
5 of 12 lines selected.
Zamboanga Sibugay 2nd DEO
- House version (HB 10858)
- ₱525.2M
- 30 lines
- President’s NEP
- ₱372.2M
- 26 lines
- Added by the House
- 6
- ₱194.0M
- Changed / removed
- 4 / 2
- 20 lines unchanged
Lines that differ from the NEP (10)
| Line | Change | NEP | House | Sources |
|---|---|---|---|---|
| Construction of Flood Control Structure along Sibuguey River, Siay, Zamboanga Sibugay 0 + 000 to 0 + 245 | Added by the House | — | ₱50,000,000 | HB p. 365 |
| Construction of River Wall along the Sibuguey River, Barangay Minsulao to Barangay Paruk, Siay, Zamboanga Sibugay 0 + 000 to 0 + 228 | Added by the House | — | ₱50,000,000 | HB p. 365 |
| Construction of Access Road, Barangay Sta Clara, Naga - Barangay Banker, Kabasalan, Zamboanga Sibugay | Added by the House | — | ₱50,000,000 | HB p. 598 |
| Construction of Access Road, Barangay Ipil Heights, Ipil, Zamboanga Sibugay | Added by the House | — | ₱30,000,000 | HB p. 598 |
| Construction of New Tampilisan-Diampak-Shiolan Road, Barangay New Tampilisan, Kabasalan, Zamboanga Sibugay | Reduced | ₱50,000,000 | ₱20,000,000 | HB p. 598 NEP PDF p. 548 |
| Completion of Multi-Purpose Building, Barangay Poblacion, Ipil, Zamboanga Sibugay | Added by the House | — | ₱8,000,000 | HB p. 863 |
| Construction of Multi-Purpose Building, Barangay Caparan, Ipil, Zamboanga SibugayA similar title appears in another NEP listing; check before citing. | Added by the House | — | ₱6,000,000 | HB p. 863 |
| Construction of Multi-Purpose Building, Barangay Poblacion, Ipil, Zamboanga SibugayMatched to the NEP by a close title, not an exact one. | Increased | ₱50,000,000 | ₱51,000,000 | HB p. 863 NEP PDF p. 655 (scan reading; check the page) |
| Construction of Multi-Purpose Building (Ipil District Office), Barangay Poblacion, Ipil, Zamboanga Sibugay | Increased | ₱6,000,000 | ₱7,000,000 | HB p. 863 NEP PDF p. 655 (scan reading; check the page) |
| Construction of Multi-Purpose Building, Barangay Sanito, Ipil, Zamboanga SibugayMatched to the NEP by a close title, not an exact one. | Increased | ₱6,000,000 | ₱7,000,000 | HB p. 863 NEP PDF p. 655 (scan reading; check the page) |
NEP lines with no match in the House version (2)
- Construction of Multi-Purpose Building, Brgy. Little Baguio, Kabasalan, Zamboanga Sibugay · ₱8,000,000 · NEP PDF p. 655
- Construction of Multi-Purpose Building , (BJMP Kitchen ), Brgy. Sanito, Ipil, Zamboanga Sibugay · ₱6,000,000 · NEP PDF p. 655
A line can look removed when the House reworded its title. Treat these as questions.
Past DPWH contracts under this office
899 contracts from 2016 to 2025 in public DPWH records (₱11.59B): 815 recorded as completed, 70 as ongoing. 885 have a satellite image check on file. Browse them.
How this was made. House lines come from the native text of House Bill No. 10858, third reading, Vol. I-C (official record); every one of the 15,977 amounts was checked against its printed page. NEP lines come from the FY2027 National Expenditure Program, Vol. II-B as read by the open BetterGov DPWH NEP–HB analysis. Lines are matched by office and title. A line marked “added” had no matching title under the same office in the NEP; “uncertain” means a similar title appears in the DPWH Transparency NEP listing or our own NEP reading, or the scan reading of the NEP amount needs a check. Past contracts and indicators come from public DPWH records on this site.
Disclaimer. This page and the letters it makes ask for explanations and documents. They do not say that anyone did anything wrong. A budget change can have a good reason; that is what the letter asks about. Your name and place stay in your browser and are never sent to us.