Barangay

Pao

Pao, San Jose, Tarlac, Region III (Central Luzon). Rural. Population 2,004 (2024 POPCEN).

PSGC 0306918010 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Pao

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

Not yet linked to Pao itself. This shows the municipality figure for San Jose.

178 records · ₱8,306,775,254.72

11 placed at San Jose level itself; the rest in LGUs under it.

  1. Network Development Program-Construction of Missing Links/New Roads, Capas-Botolan Road, Tarlac 2nd Legislative District, Province of Tarlac₱144,750,000.00 · 2019 · medium confidence (project coordinates inside the barangay boundary)
  2. Network Development Program-Const. of Missing Links/New Roads, Capas-Botolan Road & Network Development Program-Const. of Missing Links/New Roads, Capas-Botolan Road (Package 3), Province of Tarlac₱142,820,000.00 · 2022 · medium confidence (project coordinates inside the barangay boundary)
  3. Network Development - Improvement/Widening of National Roads; Capas-San Jose-Mayantoc-Malacampa Rd, Ko125+436 - Ko128+000 & Ko141+000- Ko144+175₱126,939,285.63 · 2017 · medium confidence (project coordinates inside the barangay boundary)
  4. Network Development Program-Construction of Missing Links/New Roads-Capas-Botolan Road, Package 1, Tarlac, Province of Tarlac₱120,625,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  5. Installation of Safety Devices and Solar Led Street Lights Along Capas-San Jose-Mayantoc-Malacampa Rd to Tarlac City - Sn Jose Via Tibag-Burgos Rd (San Jose Section), Tarlac₱102,964,885.70 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  6. Basic Infrastructure Program (Bip) Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities Construction of Road Slope Protection Including Road Slips Along San Jose, Tarlac Palauig, Zambales Road (Pack₱99,000,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)

How linked: 167 by project coordinates inside the barangay boundary; 10 by project coordinates inside the city/municipality boundary; 1 by project title names the place.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

1 record · ₱660,946.65

  1. Barangay Pao - San Jose, Tarlac₱660,946.65 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Pao itself. This shows the province figure for Tarlac.

57,415 records · ₱158,954,717,031.01

57,358 placed at Tarlac level itself; the rest in LGUs under it.

  1. Tarlac₱158,954,717,031.01 · 57,358 awards · high confidence (area of delivery is this province only)
  2. Aurora, Bataan, Bulacan, Nueva Ecija, Pampanga, Tarlac, Zambales₱315,284,183.51 · 23 awards · low confidence (area of delivery lists several provinces)
  3. Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Isabela, Pampanga, Tarlac₱112,839,000.00 · 2 awards · low confidence (area of delivery lists several provinces)
  4. Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Pampanga, Tarlac₱9,570,790.00 · 4 awards · low confidence (area of delivery lists several provinces)
  5. Surigao del Sur, Tarlac₱4,544,878.21 · 4 awards · low confidence (area of delivery lists several provinces)
  6. Surigao del Sur, Tarlac, Tawi-Tawi, Zambales₱3,546,000.00 · 1 awards · low confidence (area of delivery lists several provinces)

How linked: 57,358 by area of delivery is this province only; 57 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Pao itself. This shows the municipality figure for San Jose.

8 records · ₱25,000,000.00

2 placed at San Jose level itself; the rest in LGUs under it.

  1. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Construction of Sea Wall Or River Wall (Construction of Flood Control Project-Concrete Revetment) at Barangay Iba₱5,000,000.00 · 2022 · high confidence (location columns in the DBM release)
  3. Concreting of Farm-to-Market Road (Fmr) in Barangay Villa Aglipay₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  4. Concreting of Farm-to-Market Road (Fmr) in Barangay Sula₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  5. Concreting of Farm-to-Market Road (Fmr) in Barangay Iba₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
  6. Rehabilitation of Farm-to-Market Road (Fmr) in Barangay Lubigan₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)

How linked: 8 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

5 records · ₱39,500,000.00

  1. Construction of Solar Water System, Brgy. Pao, San Jose, Tarlac₱10,000,000.00 · 2023 · medium confidence (GAA line text names the place)
  2. Construction of Solar Water System, Brgy. Pao, San Jose, Tarlac₱10,000,000.00 · 2023 · medium confidence (GAA line text names the place)
  3. Rehabilitation of Road in Brgy. Pao, San Jose, Tarlac₱10,000,000.00 · 2022 · medium confidence (GAA line text names the place)
  4. Construction (Completion) of Multi-Purpose Building (Covered Court), Barangay Pao, San Jose, Tarlac₱5,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  5. Construction of Covered Court, Brgy. Pao, San Jose, Tarlac₱4,500,000.00 · 2018 · medium confidence (GAA line text names the place)

How linked: 5 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Pao itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, San Jose.

See all 4 published flags in San Jose

Contractors on linked DPWH projects

None linked to Pao itself; showing San Jose.

Share card: Pao

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Pao

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG