Municipality

Daet

Daet, Camarines Norte, Region V (Bicol Region). 1st income class. Population 106,465 (2024 POPCEN).

Data-quality note: 32 DPWH projects linked to Daet have no coordinates published by DPWH, so they are not on the map and cannot be checked with satellite images.

PSGC 0501603000 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Daet

Counts include this municipality and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

361 records · ₱8,269,426,327.86

32 placed at Daet level itself; the rest in LGUs under it.

  1. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Daet River Flood Control Structure (Dogongan Section-Package₱238,692,313.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Daet River Flood Control Structure (Dogongan Section-Package₱236,424,166.73 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Mitigation Structure, Daet River, Barangay Bibirao, Dae₱235,217,975.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  4. Convergence and Special Support Program-Basic Infrastructure Program (Bip)-Bip-Evacuation Centers/Quarantine Facilities/Public Health Facilities-Construction of Camarines Norte Provincial Hospital, Daet, Camarines Norte₱216,663,532.51 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  5. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Rehabilitation of Flood Mitigation Facilities Within Major River Basins and Principal Rivers-Construction of Flood Mitigation Structure Along₱162,117,940.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  6. Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Mitigation Structure, Barangay Mambalite, Daet, Camarin₱149,767,039.80 · 2025 · medium confidence (project coordinates inside the barangay boundary)

How linked: 329 by project coordinates inside the barangay boundary; 32 by project title names the place.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

4 records · ₱98,683,421.62

1 placed at Daet level itself; the rest in LGUs under it.

  1. Municipality of Daet, Camarines Norte₱85,790,864.14 · high confidence (the LGU itself is the buyer)
  2. Barangay Alawihao, Daet, Camarines Norte₱5,348,462.98 · high confidence (the LGU itself is the buyer)
  3. Barangay V, Daet, Camarines Norte₱4,150,601.90 · high confidence (the LGU itself is the buyer)
  4. Barangay Dogongan, Daet, Camarines Norte₱3,393,492.60 · high confidence (the LGU itself is the buyer)

How linked: 4 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Daet itself. This shows the province figure for Camarines Norte.

37,045 records · ₱74,318,760,468.03

36,695 placed at Camarines Norte level itself; the rest in LGUs under it.

  1. Camarines Norte₱74,318,760,468.03 · 36,695 awards · high confidence (area of delivery is this province only)
  2. Albay, Camarines Norte₱401,903,240.34 · 2 awards · low confidence (area of delivery lists several provinces)
  3. Albay, Camarines Norte, Camarines Sur, Catanduanes, Masbate, Sorsogon₱176,181,300.57 · 161 awards · low confidence (area of delivery lists several provinces)
  4. Albay, Camarines Norte, Masbate₱102,726,190.19 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Albay, Camarines Norte, Camarines Sur, Masbate, Sorsogon₱73,068,254.65 · 90 awards · low confidence (area of delivery lists several provinces)
  6. Albay, Camarines Norte, Camarines Sur, Sorsogon₱30,814,671.16 · 30 awards · low confidence (area of delivery lists several provinces)

How linked: 36,695 by area of delivery is this province only; 350 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

4 records · ₱16,000,000.00

2 placed at Daet level itself; the rest in LGUs under it.

  1. Concreting of Farm-to-Market Road₱6,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  3. Rehabilitation/Improvement of Health Station₱4,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  4. Purchase of Vehicle - Ambulance₱1,000,000.00 · 2024 · high confidence (location columns in the DBM release)

How linked: 4 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

206 records · ₱4,946,716,000.00

100 placed at Daet level itself; the rest in LGUs under it.

  1. Construction of Daet River Flood Control Structure ( Dogongan Section - Package 1 ) , Daet, Camarines Norte₱255,000,000.00 · 2024 · high confidence (GAA line text names the place)
  2. Construction of Flood Mitigation Structure, Daet River, Barangay Bibirao, Daet, Camarines Norte₱250,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  3. Construction of Daet River Flood Control Structure ( Dogongan Section - Package 2 ) , Daet, Camarines Norte₱245,000,000.00 · 2024 · high confidence (GAA line text names the place)
  4. Construction of Flood Mitigation Structure Along Daet River, Barangay Gubat, Daet, Camarines Norte₱168,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  5. Construction of Flood Mitigation Structure, Barangay Mambalite, Daet, Camarines Norte₱160,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  6. Construction of Flood Control Structure, Barangay Alawihao, Daet, Camarines Norte ( Package I )₱150,000,000.00 · 2024 · medium confidence (GAA line text names the place)

How linked: 206 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

See all 3 published flags

Contractors on linked DPWH projects

All 62 contractors on DPWH projects linked to Daet and the LGUs under it. Click a column to sort.

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Daet

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Barangays in Daet (25)

QR codes for Daet

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG