Barangay
Liang
Liang, Irosin, Sorsogon, Region V (Bicol Region). Rural. Population 902 (2024 POPCEN).
PSGC 0506209015 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Liang
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Liang itself. This shows the municipality figure for Irosin.
137 records · ₱7,193,306,772.72
2 placed at Irosin level itself; the rest in LGUs under it.
- Construction of Cadac-An River Flood Mitigation Structure, Barangay Gumapia, Irosin, Sorsogon₱188,204,271.80 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1 : Ensure Safe and Reliable National Road System - Bridge Program - Construction of New Bridges - Irosin Viaduct Along Daang Maharlika, Salvacion, Irosin, Salvacion, Irosin, Sorsogon (2nd Legislative District)₱187,130,520.59 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Construction/Improvement/Rehabilitation of Cadac-An River Flood Mitigation Structure, Sta. 23+752.00 - Sta. 24+575.57 Left Side, Sta. 23+806.50 - Sta. 24+357.50 Right Side, Irosin, Sorsogon₱174,378,350.70 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Mitigation Structure, Barangay Batang, Irosin, Sorsogon₱158,307,468.03 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Mitigation Structure Along Gabao River, Barangay Gabao₱158,307,142.13 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Mitigation Structure, Barangay Buenavista, Irosin, Sors₱148,995,464.59 · 2024 · medium confidence (project coordinates inside the barangay boundary)
How linked: 135 by project coordinates inside the barangay boundary; 1 by project title names the place; 1 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Liang itself. This shows the municipality figure for Irosin.
1 record · ₱758,125,098.05
- Municipality of Irosin, Sorsogon₱758,125,098.05 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Liang itself. This shows the province figure for Sorsogon.
25,488 records · ₱130,924,711,024.93
25,076 placed at Sorsogon level itself; the rest in LGUs under it.
- Sorsogon₱130,924,711,024.93 · 25,076 awards · high confidence (area of delivery is this province only)
- Albay, Sorsogon₱479,979,066.77 · 15 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Sur, Sorsogon₱218,592,208.25 · 4 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Norte, Camarines Sur, Catanduanes, Masbate, Sorsogon₱176,181,300.57 · 161 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Sur, Masbate, Sorsogon₱105,154,378.00 · 31 awards · low confidence (area of delivery lists several provinces)
- Catanduanes, Sorsogon₱96,762,909.05 · 2 awards · low confidence (area of delivery lists several provinces)
How linked: 25,076 by area of delivery is this province only; 412 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
1 record · ₱4,000,000.00
- Upgrading of Water Supply System₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 1 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
1 record · ₱7,500,000.00
- Construction of Multi-Purpose Building, Barangay Liang, Irosin, Sorsogon₱7,500,000.00 · 2022 · medium confidence (GAA line text names the place)
How linked: 1 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Liang itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Irosin.
- Contractor Concentration (Flood Control)Centerways Const and Development IncContractor: Centerways Const and Development Inc
- High Concurrent Workload for One ContractorCenterways Const and Development IncContractor: Centerways Const and Development Inc
- Contractor Concentration (Flood Control)Centerways Const and Development IncContractor: Centerways Const and Development Inc
- High Concurrent Workload for One ContractorHi-Tone Const & Development Corp FormerlyContractor: Hi-Tone Const & Development Corp Formerly
- High Concurrent Workload for One ContractorMakapa CorpContractor: Makapa Corp
- Contractor Concentration (Flood Control)Ramarplus Inc Formerly Ramar EntContractor: Ramarplus Inc Formerly Ramar Ent
Contractors on linked DPWH projects
None linked to Liang itself; showing Irosin.
- CENTERWAYS CONST AND DEVELOPMENT INC12 projects · ₱1,029,072,590.41
- WELEX CONST INC FORMERLY WELEX C14 projects · ₱722,223,723.74
- MUNTOPAR BUILDERS CORP10 projects · ₱683,516,196.91
- ALRO CONST3 projects · ₱465,610,074.75
- MAKAPA CORP3 projects · ₱434,928,136.16
- TR CONST CORP FOR: TR CONST3 projects · ₱340,830,163.57
- AREMAR CONST CORP5 projects · ₱328,599,215.40
- LEGAZPI PREMIUM DEVELOPMENT CORP5 projects · ₱289,145,756.33
- STEVEN CONST6 projects · ₱230,275,954.43
- HI-TONE CONST & DEVELOPMENT CORP FORMERLY / CENTERWAYS CONST AND DEVELOPMENT INC2 projects · ₱228,115,557.10

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Liang
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
