Barangay
Bonifacio
Bonifacio, Bilar, Bohol, Region VII (Central Visayas). Rural. Population 278 (2024 POPCEN).
PSGC 0701208001 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Bonifacio
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Bonifacio itself. This shows the municipality figure for Bilar.
75 records · ₱950,260,717.11
13 placed at Bilar level itself; the rest in LGUs under it.
- Organizational Outcome 1 : Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslides - Secondary Roads, Loay Interior Road - K0182 + 450 - K0182 + 700, Boho₱144,749,320.48 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Loay Interior Rd - K0160+214- K0160+730 , K0173+474 - K0174+225, K0197+509 - K0198+060₱112,496,223.73 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program Preventive Maintenance - Secondary Roads Loay Interior Rd - K0176 + 281 - K0178 + 122; K0186 + 624 - K0187 + 000; K0192 + 480 - K0192 + 930₱110,947,991.35 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1 : Ensure Safe and Reliable National Road System Asset Preservation Program Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads Loay Interior Rd - K0172 + 022 - K0173 + 133, K0174 + 240 - K0175 + 164₱54,718,356.35 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservationprogram/Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse and Landslide - Primary Roads, Loay Interior Road - Ko 182 + 060 - Ko 182 + 500, Ko 191 +₱45,981,600.00 · 2020 · medium confidence (project coordinates inside the barangay boundary)
- Convergence and Special Support Program Basic Infrastructure Program Bip - Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities Construction (Concreting) of Road at Barangay Bugang Sur to Barangay C₱34,649,998.98 · 2023 · medium confidence (project coordinates inside the barangay boundary)
How linked: 62 by project coordinates inside the barangay boundary; 10 by project title names the place; 3 by project coordinates inside the city/municipality boundary.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Bonifacio itself. This shows the municipality figure for Bilar.
1 record · ₱227,972,116.21
- Municipality of Bilar, Bohol₱227,972,116.21 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Bonifacio itself. This shows the province figure for Bohol.
70,045 records · ₱142,452,490,034.71
69,690 placed at Bohol level itself; the rest in LGUs under it.
- Bohol₱142,452,490,034.71 · 69,690 awards · high confidence (area of delivery is this province only)
- Bohol, Cebu, Negros Oriental, Siquijor₱313,071,832.22 · 155 awards · low confidence (area of delivery lists several provinces)
- Bohol, Cebu, Negros Oriental₱111,569,883.99 · 53 awards · low confidence (area of delivery lists several provinces)
- Bohol, Negros Oriental₱74,376,617.00 · 35 awards · low confidence (area of delivery lists several provinces)
- Bohol, Cebu₱73,351,351.76 · 66 awards · low confidence (area of delivery lists several provinces)
- Bohol, Cebu, Siquijor₱60,193,664.40 · 25 awards · low confidence (area of delivery lists several provinces)
How linked: 69,690 by area of delivery is this province only; 355 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
2 records · ₱7,900,169.00
- Provision of Renewable Energy- Based Electrification (Installation of Solar Lights ) Along Brgy. Bonifacio Road for 90 Hhs₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Lgsf_gef₱3,900,169.00 · 2026 · high confidence (location columns in the DBM release)
How linked: 2 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
Not yet linked to Bonifacio itself. This shows the municipality figure for Bilar.
57 records · ₱436,141,000.00
24 placed at Bilar level itself; the rest in LGUs under it.
- Construction of Road, Jct. (Bilar-Oac,Dimiao) Subayon – Villa Aurora Rd., Sta.0+000 - Sta.1+760, Bilar, Bohol₱48,488,000.00 · 2026 · high confidence (GAA line text names the place)
- Construction (Concreting) of Road at Barangay Bugang Sur to Barangay Cambigsi, Bilar, Bohol₱35,000,000.00 · 2023 · high confidence (GAA line text names the place)
- Construction of Roads, Bilar, Bohol₱35,000,000.00 · 2024 · high confidence (GAA line text names the place)
- Installation of Solar Street Lights Along Brgy. Poblacion - Brgy. Yanaya - Brgy. Owac - Brgy. Rizal, Bilar, Bohol₱35,000,000.00 · 2023 · high confidence (GAA line text names the place)
- Construction of Drainage System, Brgy. Poblacion, Bilar, Bohol₱33,000,000.00 · 2022 · medium confidence (GAA line text names the place)
- Jct. (Ter) Dimiao-Oac-Bilar Jct. (Lir) Road in Support of the Agribusiness Industry, Bilar, Bohol₱20,000,000.00 · 2018 · high confidence (GAA line text names the place)
How linked: 57 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Bonifacio itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Bohol.
- Awards Very Close to the Budget CeilingConstruction of Flood Control Structure Along Wahig River, Sierra Bullones, BoholContractor: Claire Const and Supply Corp / Muana Const and Development Corp Formerly
- Awards Very Close to the Budget CeilingConstruction of Ubay Flood Control Structure, Barangay Bongbong-Barangay San Pascual, Ubay, BoholContractor: Zlrej Trading and Const Corp
- Contractor Concentration (Flood Control)Legacy Const Corp Formerly: Legacy ConstContractor: Legacy Const Corp Formerly: Legacy Const
- Contractor Concentration (Flood Control)Hgg Builders & SupplyContractor: Hgg Builders & Supply
- Contractor Concentration (Flood Control)Centerways Const and Development IncContractor: Centerways Const and Development Inc
- Contractor Concentration (Flood Control)Ven Ray Const CorpContractor: Ven Ray Const Corp
Contractors on linked DPWH projects
None linked to Bonifacio itself; showing Bilar.
- NEWINGTON BUILDERS INC FOR: E GARDIOLA CONSTRUC2 projects · ₱223,444,215.08
- J H PAJARA CONST CORP1 project · ₱144,749,320.48
- MUANA CONST AND DEVELOPMENT CORP FORMERLY8 projects · ₱121,636,052.66
- ALOJA BUILDERS AND REALTY11 projects · ₱83,134,547.25
- BIG BERTHA CONST1 project · ₱54,718,356.35
- N N YU CONST INC FORMERLY: YU CONST2 projects · ₱40,684,266.00
- HUSAIN CONST AND SUPPLY CO1 project · ₱34,613,754.08
- ZLREJ TRADING AND CONST CORP / AQUATERRA KONSTRUKT INC1 project · ₱32,337,988.76
- FUENTABUILT CONST CORP4 projects · ₱18,471,203.14
- JEGSTONE CONST3 projects · ₱18,130,042.52

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Bonifacio
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.