Barangay

Biga

Biga, City of Toledo, Cebu, Region VII (Central Visayas). Rural. Population 4,415 (2024 POPCEN).

PSGC 0702251004 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Biga

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

Not yet linked to Biga itself. This shows the city figure for City of Toledo.

195 records · ₱4,656,724,588.11

3 placed at City of Toledo level itself; the rest in LGUs under it.

  1. Cssp , Sustainable Infrastructure Projects Alleviating Gaps (Sipag) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction of Flood Mitigation Structure at Camanchilles River, Brgy.Talavera, Toledo City, Cebu₱212,299,996.48 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Oo2: Protect Lives and Properties Against Major Floods, Flood Mgt. Program, Const./Rehab. of Flood Mitigation Facilities Within Major River Basins and Principal Rivers, Const. of Flood Mitigation Structures Along Dumlog River (Upstream) Barangay Carmen,₱193,000,000.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Cssp, Sustainable Infrastructure Projects Alleviating Gaps (Sipag) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Const. of Flood Mitigation Structure at Camanchilles River (Upstream), Brgy. Talavera, Toledo City₱192,999,998.08 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  4. Rehabilitation/Reconstruction of National Roads With Slips, Slope Collapse and Landslide Secondary Roads, Cebu-Balamban-Transcentral Highway, Sec.1: K0037+980-K0038+540.09, Cebu Province₱139,620,000.00 · 2016 · medium confidence (project coordinates inside the barangay boundary)
  5. Convergence and Special Support Program: Basic Infrastructure Program (Bip), Multi-Purpose Buildings/ Facilities to Support Social Services, Construction of the Toledo City Sports Complex, Toledo City, Cebu₱123,749,997.66 · 2023 · medium confidence (project coordinates inside the barangay boundary)
  6. Oo2: Protect Lives and Properties Against Major Floods, Flood Management Program, Const./ Rehab. of Flood Mitigation Facilities Within Major River Basins and Principal Rivers, Const. of Flood Mitigation Structure, Sapangdaku River, Barangay Ilihan,Toledo₱115,699,999.99 · 2025 · medium confidence (project coordinates inside the barangay boundary)

How linked: 192 by project coordinates inside the barangay boundary; 3 by project coordinates inside the city/municipality boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Biga itself. This shows the city figure for City of Toledo.

3 records · ₱5,164,925,588.45

1 placed at City of Toledo level itself; the rest in LGUs under it.

  1. City of Toledo, Cebu₱5,161,593,295.31 · high confidence (the LGU itself is the buyer)
  2. Barangay Dumlog, Toledo City, Cebu₱3,061,355.64 · high confidence (the LGU itself is the buyer)
  3. Barangay Ibo, Toledo, Cebu₱270,937.50 · high confidence (the LGU itself is the buyer)

How linked: 3 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Biga itself. This shows the province figure for Cebu.

161,655 records · ₱506,755,681,657.63

161,308 placed at Cebu level itself; the rest in LGUs under it.

  1. Cebu₱506,755,681,657.63 · 161,308 awards · high confidence (area of delivery is this province only)
  2. Bohol, Cebu, Negros Oriental, Siquijor₱313,071,832.22 · 155 awards · low confidence (area of delivery lists several provinces)
  3. Bohol, Cebu, Negros Oriental₱111,569,883.99 · 53 awards · low confidence (area of delivery lists several provinces)
  4. Bohol, Cebu₱73,351,351.76 · 66 awards · low confidence (area of delivery lists several provinces)
  5. Bohol, Cebu, Siquijor₱60,193,664.40 · 25 awards · low confidence (area of delivery lists several provinces)
  6. Cavite, Cebu₱52,454,843.07 · 12 awards · low confidence (area of delivery lists several provinces)

How linked: 161,308 by area of delivery is this province only; 347 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Biga itself. This shows the city figure for City of Toledo.

3 records · ₱77,213,764.34

1 placed at City of Toledo level itself; the rest in LGUs under it.

  1. Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱64,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Concreting of Farm to Market Road₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)
  3. Rehabilitation of Level Ii Potable Water Supply System₱6,606,882.17 · 2023 · high confidence (location columns in the DBM release)

How linked: 3 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

Not yet linked to Biga itself. This shows the city figure for City of Toledo.

105 records · ₱2,085,739,000.00

41 placed at City of Toledo level itself; the rest in LGUs under it.

  1. Construction of Flood Mitigation Structure at Camanchilles River, Brgy. Talavera, Toledo City, Cebu₱220,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  2. Cosntruction of Flood Mitigation Structure at Camanchilles River ( Upstream ) , Brgy. Talavera, Toledo City, Cebu₱200,000,000.00 · 2024 · medium confidence (GAA line text names the place)
  3. Construction of the Toledo City Sports Complex, Toledo City, Cebu₱125,000,000.00 · 2023 · high confidence (GAA line text names the place)
  4. Construction of Flood Mitigation Structure, Sapangdaku River, Barangay Ilihan, Toledo City, Cebu₱120,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  5. Construction of Water Supply Project, Toledo City, Cebu₱91,000,000.00 · 2017 · high confidence (GAA line text names the place)
  6. Talavera Br. (B00661cb) Along Toledo-Tabuelan-Sn Remigio Rd, K0050+590 - K0050+905, Brgy. Talavera, Toledo City, Cebu₱81,590,000.00 · 2026 · medium confidence (GAA line text names the place)

How linked: 105 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Biga itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, City of Toledo.

See all 12 published flags in City of Toledo

Contractors on linked DPWH projects

None linked to Biga itself; showing City of Toledo.

Share card: Biga

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Biga

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG