Barangay

Imelda

Imelda, Allen, Northern Samar, Region VIII (Eastern Visayas). Rural. Population 384 (2024 POPCEN).

PSGC 0804801019 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Imelda

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

Not yet linked to Imelda itself. This shows the municipality figure for Allen.

88 records · ₱1,014,832,069.50

18 placed at Allen level itself; the rest in LGUs under it.

  1. Preventive Maintenance: Asphalt Overlay Along Allen - Catarman Rd-K0701+711 - K0702+076, K0706+301 - K0707+000, K0714+118 - K0715+300₱61,216,196.26 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  2. Bridge Program - Retrofitting/Strengthening of Permanent Bridges Jubasan Br. 1 (B00249sm) Along Daang Maharlika (Sm) (Sn Isidro - Sn Juanico Br), Northern Samar 1st Ld₱50,825,099.47 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Construction of Seawall (Tide Control) Shorefront Protection Riprap Along Brgy. Cabacungan Shoreline, Brgy. Cabacungan, Municipality of Allen, Northern Samar₱48,974,593.23 · 2021 · medium confidence (project coordinates inside the barangay boundary)
  4. Construction of Flood Control Structure Along Brgy. Sabang Zone 2 and Brgy. Looc, Allen, Northern Samar₱48,960,370.30 · 2022 · high confidence (project coordinates inside the city/municipality boundary)
  5. Imprvt./Widening of National Road, Daang Maharlika (Sm) (San Isidro - San Juanico Bridge) K0695+325 - K0696+010, K0696+090 - K0696+836, Section Id: S00002sm, Jubasan, Northern Samar₱40,497,378.44 · 2016 · medium confidence (project coordinates inside the barangay boundary)
  6. Preventative Maintenance - Asphalt Overlay - Allen - Catarman Road - K0699+838 - K0701+711, Allen, Northern Samar₱40,038,271.06 · 2023 · medium confidence (project coordinates inside the barangay boundary)

How linked: 70 by project coordinates inside the barangay boundary; 16 by project title names the place; 2 by project coordinates inside the city/municipality boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Imelda itself. This shows the municipality figure for Allen.

1 record · ₱11,695,694.01

  1. Municipality of Allen, Northern Samar₱11,695,694.01 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Imelda itself. This shows the province figure for Northern Samar.

21,081 records · ₱74,697,738,933.51

20,576 placed at Northern Samar level itself; the rest in LGUs under it.

  1. Northern Samar₱74,697,738,933.51 · 20,576 awards · high confidence (area of delivery is this province only)
  2. Biliran, Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱743,171,851.61 · 183 awards · low confidence (area of delivery lists several provinces)
  3. Eastern Samar, Leyte, Northern Samar, Samar, Southern Leyte₱378,221,917.42 · 160 awards · low confidence (area of delivery lists several provinces)
  4. Eastern Samar, Leyte, Northern Samar, Samar₱115,043,836.36 · 28 awards · low confidence (area of delivery lists several provinces)
  5. Eastern Samar, Northern Samar, Samar₱105,706,083.00 · 35 awards · low confidence (area of delivery lists several provinces)
  6. Biliran, Eastern Samar, Leyte, Northern Samar, Samar₱74,244,709.72 · 10 awards · low confidence (area of delivery lists several provinces)

How linked: 20,576 by area of delivery is this province only; 505 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

Not yet linked to Imelda itself. This shows the municipality figure for Allen.

2 records · ₱32,780,000.00

  1. Lgsf_gef₱30,000,000.00 · 2026 · high confidence (location columns in the DBM release)
  2. Lgsf_gef₱2,780,000.00 · 2025 · high confidence (location columns in the DBM release)

How linked: 2 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

Not yet linked to Imelda itself. This shows the municipality figure for Allen.

44 records · ₱366,270,000.00

22 placed at Allen level itself; the rest in LGUs under it.

  1. Construction of Flood Control Structure Along Brgy. Sabang Zone 2 and Brgy. Looc, Allen, Northern Samar₱50,000,000.00 · 2022 · high confidence (GAA line text names the place)
  2. Construction of Seawall (Tide Control) Shorefront Protection Riprap Along Brgy. Cabacungan Shoreline, Brgy. Cabacungan, Municipality of Allen, Northern Samar₱50,000,000.00 · 2021 · high confidence (GAA line text names the place)
  3. Construction of Shore Protection Along Kinaguitman, Brgy. Kinaguitman, Allen, Northern Samar₱30,000,000.00 · 2022 · medium confidence (GAA line text names the place)
  4. Allen Municipal Wharf, Allen, Northern Samar₱25,000,000.00 · 2022 · high confidence (GAA line text names the place)
  5. Construction (Completion) of Multipurpose Building (Diploma Building), Balicuatro College of Arts and Trade, Allen, Northern Samar₱20,000,000.00 · 2025 · high confidence (GAA line text names the place)
  6. Rehabilitation/Improvement of Allen Municipal Wharf, Allen, Northern Samar₱20,000,000.00 · 2021 · high confidence (GAA line text names the place)

How linked: 44 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

No published flags are linked to Imelda itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Allen.

  • Contractor Concentration (Flood Control)Cdu ConstContractor: Cdu Const

See all 1 published flag in Allen

Contractors on linked DPWH projects

None linked to Imelda itself; showing Allen.

Share card: Imelda

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Imelda

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG