RNMK CONST SUPPLY AND DEVELOPMENT CORP FOR: RNMK CONST is listed as a company organization in Philippine public procurement records on this site, with 144 linked DPWH project(s) totaling about ₱4,381,687,351.41. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
RNMK CONST SUPPLY AND DEVELOPMENT CORP FOR: RNMK CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 144
- Total value
- ₱4,381,687,351.41
- Published flags
- 0
- Region
- Northern Samar 1st DEO · Region VIII
Public Record Grade
A transparent, data-derived summary of reported public records for RNMK CONST SUPPLY AND DEVELOPMENT CORP FOR: RNMK CONST — not an accusation or finding of wrongdoing.
Score: 77.70 / 100 · Projects in sample: 144 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 58.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 58.9
- lateCompletedProjects
- 19
- onTimeCompletedProjects
- 90
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 139
- pastTargetOngoingProjects
- 30
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 144
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 144
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 144
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 144
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 131 geotagged projects (largest by contract value) — Open full map
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-ALLEN-CATARMAN RD- K0737+360 - K0738+523, CATARMAN & BOBON, NORTHERN SAMAR25IH0039 · ₱105,063,931.64 · mapped
- IMPROVEMENT/WIDENING OF CALBAYOG DIVERSION ROAD K0729+400-K0732+400, SAMAR 1ST LD17IJ0104 · ₱100,447,425.43 · mapped
- CONSTRUCTION OF CAG-ABACA - CULARIMA - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR25IH0092 · ₱98,009,278.40 · mapped
- CONSTRUCTION OF RIVERBANK PROTECTION, CATARMAN-BOBON IRRIGATION PROJECT, BARANGAY TURA, BOBON, NORTHERN SAMAR24IH0106 · ₱96,472,516.18 · mapped
- REHABILITATION OF FLOOD CONTROL, CARANGIAN CREEK, BARANGAY SOUTH - BARANGAY WEST, SAN JOSE, NORTHERN SAMAR24IH0112 · ₱96,468,363.41 · mapped
- CONSTRUCTION OF ROAD FROM LAVEZARES PORT TO NATIONAL HIGHWAY, LAVEZARES, NORTHERN SAMAR24IH0065 · ₱96,399,498.37 · mapped
- CONSTRUCTION OF SAN ISIDRO-LOPE DE VEGA ROAD, SAN ISIDRO AND LOPE DE VEGA NORTHERN SAMAR24IH0066 · ₱96,398,576.37 · mapped
- CONSTRUCTION OF SAN ISIDRO-LOPE DE VEGA ROAD, SAN ISIDRO, NORTHERN SAMAR22IH0103 · ₱95,999,442.79 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG COASTAL ROAD, PACKAGE 4A, SAMAR21IJ0036 · ₱95,717,376.00 · mapped
- CONSRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE 3A, SAMAR21IJ0035 · ₱95,709,156.50 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY- PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE C, CALBAYOG CITY, SAMAR19IJ0067 · ₱94,500,430.00 · mapped
- 001: ENSURE SAFE AND RELIABLE ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE 1A, CALBAYOG CITY, SAMAR19IJ0065 · ₱93,660,806.80 · mapped
- 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT, CONSTRUCTION OF BY - PASS AND DIVERSION ROADS, CALBAYOG CITY, COASTAL ROAD, PACKAGE B, CALBAYOG CITY, SAMAR19IJ0066 · ₱93,564,950.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, ALLEN-CATARMAN ROAD, KO714+000 -KO714+687; KO714+699.50 - KO714+900; KO715+300 - KO717+000; KO717+140 - KO717+458.70; KO719+000 - KO721+000; KO725+500 - KO727+000, NORTHERN SAMAR 1ST LD18I00052 · ₱93,306,840.22 · mapped
- 001: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS,CALBAYOG CITY COASTAL ROAD, PACKAGE B,SAMAR20IJ0013 · ₱88,520,000.00 · mapped
- 001: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CALBAYOG CITY COASTAL ROAD, PACKAGE C,SAMAR20IJ0014 · ₱88,518,000.00 · mapped
- 001: DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) ,KO719+124 - KO720+964, KO720+990 - KO721+500 (INCLUDING RROW PAYMENT), SAMAR20IJ0003 · ₱81,699,000.00 · mapped
- CONSTRUCTION OF SAN ISIDRO-LOPE DE VEGA ROAD, SAN ISIDRO AND LOPE DE VEGA, NORTHERN SAMAR25IH0081 · ₱73,061,546.64 · mapped
- BRIDGE PROGRAM-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES MAGALLANES FLYOVER NB (PASAY-CUBAO)(B03220LZ) ALONG EPIFANIO DELOS SANTOS AVENUE (EDSA),MAKATI CITY, METRO MANILA24OC0048 · ₱55,130,430.06 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CATARMAN - LAOANG RD - K0759+000 - K0761+30724IH0025 · ₱50,437,939.60 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - SABANG BR. (B00278SM) ALONG ALLEN- CATARMAN RD, LAVEZARES, NORTHERN SAMAR25IH0069 · ₱49,520,206.29
- CONSTRUCTION OF POLANGI TO MABINI ROAD PHASE IV, CATARMAN NORTHERN SAMAR24IH0056 · ₱48,899,736.89 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER(UPSTREAM), BRGY. HAMPTON, GANDARA, SAMAR21IJ0052 · ₱48,848,030.00 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) - KO694+(-286) - KO694+(-160), KO695+150-KO695+31021IJ0112 · ₱48,718,542.88 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER (UPSTREAM), BRGY. HIPARAYAN, GANDARA, SAMAR21IJ0055 · ₱48,583,500.00 · mapped
- 001: SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT: ROAD WIDENING - SECONDARY ROAD,CALBAYOG - CATARMAN RD - K0785+(-261)-K0786 - 786+942, SAMAR19IJ0125 · ₱48,385,108.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSED AND LANDSLIDE - CATARMAN - CALBAYOG RD - K0753+879 - K0753+949, K0758+458 - K0758+510, K0766+000 - K0766+144, CATARMAN, NORTHERN SAMAR21IH0072 · ₱47,964,753.75 · mapped
- CONSTRUCTION/IMPROVEMENT OF CAG-ABACA - CULARIMA ROAD - GENERAL MALVAR ROAD, CATARMAN, NORTHERN SAMAR21IH0090 · ₱47,547,837.39 · mapped
- CONSTRUCTION/IMPROVEMENT OF ROAD/BRIDGE, BRGY. POLANGI - GEBULWANGAN - QUEZON - TRANGUE - MABINI ROAD, CATARMAN, NORTHERN SAMAR21IH0084 · ₱47,490,832.02 · mapped
- CONSTRUCTION OF BRGY. HAPPY VALLEY (SAN ISIDRO) - BRGY. CAGAMESARAG (LOPE DE VEGA) ROAD, SAN ISIDRO & LOPE DE VEGA, NORTHERN SAMAR25IH0085 · ₱47,476,607.01 · mapped
- CONSTRUCTION OF ROAD, BRGY.CURRY - BRGY. AGRUFACION, STA. MARGARITA, SAMAR21IJ0121 · ₱46,060,000.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SN ANTONIO CIRCUMFERENTIAL RD - K0003+630 - K0003+680, K0004+000 - K0004+425, K0005+829 - K0005+988, K0006+775 - K0006+875, K0008+590 - K0008+945, K0023+805 - K0024+11524IH0037 · ₱43,820,122.90 · mapped
- PREVENTIVE MAINTENANCE, TERTIARY ROADS, RAWIS-CATUBIG RD., K0791+284 - K0792+000, K0799+226.60 - K0799+298, K0799+322 - K0799+771, K0800+180 - K0800+574, K0801+190, K0801+472, K0801+487 -K0801+770, K0801+784 - K0801+858, K0801+872 - K0802+000, 2ND DISTRIC23II0005 · ₱43,534,012.32 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - CATARMAN - CALBAYOG RD - K0763+390 - K0763+502, CATARMAN, NORTHERN SAMAR23IH0019 · ₱41,806,207.99 · mapped
- WIDENING OF PERMANENT BRIDGE - VERIATO BR. (B00239SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR), SAN ISIDRO, NORTHERN SAMAR22IH0041 · ₱41,350,379.66 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES BUENDIA FLYOVER (BO0562LZ) ALONG SOUTH SUPER HIGHWAY (BUENDIA FLYOVER), MAKATI CITY, METRO MANILA23OC0004 · ₱41,160,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CATARMAN-CALBAYOG RD - K0781+450 - K0781+751, K0782+(-174) - K0782+251, K0782+267 - K0783+100, LOPE DE VEGA, NORTHERN SAMAR24IH0012 · ₱40,969,206.16 · mapped
- PREVENTATIVE MAINTENANCE - ASPHALT OVERLAY - ALLEN - CATARMAN ROAD - K0699+838 - K0701+711, ALLEN, NORTHERN SAMAR23IH0006 · ₱40,038,271.06 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) KO695+410 - KO695+505, KO696+701 - KO696+80421IJ0110 · ₱39,767,900.35 · mapped
- CONSTRUCTION OF ROAD, BRGY. POLANGI - BRGY. MABINI, CATARMAN, NORTHERN SAMAR (PHASE V)24IH0060 · ₱39,529,391.57 · mapped
- CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURES, BARANGAY SAN LORENZO, SAN JOSE, NORTHERN SAMAR25IH0068 · ₱39,499,685.65 · mapped
- CONSTRUCTION OF LAVEZARES BY-PASS ROAD, LAVEZARES, NORTHERN SAMAR23IH0104 · ₱39,189,306.30 · mapped
- BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAWO PARALLEL BR. (B00599SM) ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.), NORTHERN SAMAR 1ST24I00354 · ₱39,144,661.11 · mapped
- REHABILITATION AND IMPROVEMENT OF CARANGIAN CREEK FLOOD CONTROL, SAN JOSE NORTHERN SAMAR25IH0065 · ₱39,098,861.27 · mapped
- OO1: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -SECONDARY ROADS CALBAYOG-CATARMAN RD. KO795+009-KO795+15722IJ0070 · ₱38,964,663.43 · mapped
- LOCAL PROGRAM: CONSTRUCTION OF BARANGAY ROAD, BRY. PALALE,STA. MARGARITA,SAMAR20IJ0048 · ₱38,626,660.00 · mapped
- CONSTRUCTION/REHABILITATION OF ROAD WITH BRIDGE, MABINI - QUEZON - GEBULWANGAN - POLANGI ROAD, CATARMAN, NORTHERN SAMAR23IH0125 · ₱38,584,879.63 · mapped
- LOCAL PROGRAM: CONSTRUCTION OF ROAD, SITIO TOMALON, BRGY. GADGARAN, CALBAYOG CITY,SAMAR20IJ0042 · ₱38,515,960.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - CATARMAN-CALBAYOG RD - K0783 + 170 - K0783 + 442, LOPE DE VEGA, NORTHERN SAMAR22IH0015 · ₱37,149,030.46 · mapped
- 001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET.PRESERVATION,REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROADS-SECONDARY ROADS CALBAYOG-CATARMAN RD-KO786+000-KO786+942,KO789+533-KO789+874,KO797+060-KO797+320,KO804+139-KO804+804,SAMAR19IJ0167 · ₱37,010,000.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
