Barangay
Tattawa
Tattawa, Peñarrubia, Abra, Cordillera Administrative Region (CAR). Rural. Population 432 (2024 POPCEN).
PSGC 1400117009 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Tattawa
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Tattawa itself. This shows the municipality figure for Peñarrubia.
35 records · ₱1,206,982,499.91
2 placed at Peñarrubia level itself; the rest in LGUs under it.
- Construction of Sinalang Flood Control, PeñArrubia, Abra₱96,497,036.15 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Patiao Flood Control, PeñArrubia, Abra₱96,497,024.03 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag)-Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/Facilities, Rehabilitation of Malamsit-Sta.Rosa Road, P₱92,288,929.99 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag)-Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Road, Malamsit-Sta.Rosa₱92,269,002.49 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Bugbog-Sta. Rosa Road at Barangay Bugbog and Barangay Sta. Rosa, Bucay and Penarrubia, Abra₱59,397,130.28 · 2021 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Sinalang Flood Control, Barangays Namarabar & Riang, PeñArrubia, Abra₱49,497,153.28 · 2022 · medium confidence (project coordinates inside the barangay boundary)
How linked: 33 by project coordinates inside the barangay boundary; 2 by project title names the place.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
1 record · ₱1,140,572.80
- Barangay Tattawa - PeñArrubia, Abra₱1,140,572.80 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Tattawa itself. This shows the province figure for Abra.
8,355 records · ₱100,465,305,547.71
8,328 placed at Abra level itself; the rest in LGUs under it.
- Abra₱100,465,305,547.71 · 8,328 awards · high confidence (area of delivery is this province only)
- Abra, Agusan del Norte₱67,685,421.80 · 10 awards · low confidence (area of delivery lists several provinces)
- Abra, Albay, Cotabato, Negros Occidental, Nueva Ecija₱9,712,257.84 · 1 awards · low confidence (area of delivery lists several provinces)
- Abra, Benguet, Ilocos Norte, Ilocos Sur, La Union₱4,869,600.00 · 6 awards · low confidence (area of delivery lists several provinces)
- Abra, Benguet, Ilocos Norte, Ilocos Sur, La Union, Mountain Province₱2,793,144.00 · 5 awards · low confidence (area of delivery lists several provinces)
- Abra, Agusan del Norte, Agusan del Sur₱585,000.00 · 4 awards · low confidence (area of delivery lists several provinces)
How linked: 8,328 by area of delivery is this province only; 27 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
2 records · ₱4,351,449.00
- Lgsf_gef₱3,900,169.00 · 2026 · high confidence (location columns in the DBM release)
- Lgsf_gef₱451,280.00 · 2022 · high confidence (location columns in the DBM release)
How linked: 2 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
Not yet linked to Tattawa itself. This shows the municipality figure for Peñarrubia.
13 records · ₱150,900,000.00
10 placed at Peñarrubia level itself; the rest in LGUs under it.
- Construction of Namarabar Bridge (Phase Ii), Sta. 0+000 - Sta. 0+060, PeñArrubia, Abra₱29,400,000.00 · 2026 · high confidence (GAA line text names the place)
- Construction/Improvement of Namarabar Flood Control, Namarabar, PeñArrubia, Abra₱25,000,000.00 · 2019 · high confidence (GAA line text names the place)
- Construction of Multipurpose Building, PeñArrubia, Abra₱25,000,000.00 · 2020 · high confidence (GAA line text names the place)
- Construction of Namarabar Bridge, PeñArrubia, Abra₱25,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Rehabilitation/Repair of Malamsit-Tamtamoyan to Sta. Rosa Road, PeñArrubia, Abra₱10,000,000.00 · 2020 · high confidence (GAA line text names the place)
- Rehabilitation With Road Opening of Lusuac-Sarsaracat Road, PeñArrubia, Abra₱10,000,000.00 · 2020 · high confidence (GAA line text names the place)
How linked: 13 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Tattawa itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Peñarrubia.
- Awards Very Close to the Budget CeilingConstruction of Sinalang Flood Control, Barangays Namarabar & Riang, PeñArrubia, AbraContractor: 739 Builders
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Contractor Concentration (Flood Control)Mg Samidan ConstContractor: Mg Samidan Const
- Pattern Consistent with Contract SplittingConstruction of Sinalang Flood Control, Barangays Namarabar & Riang, PeñArrubia, AbraContractor: 739 Builders
- High Concurrent Workload for One ContractorMg Samidan ConstContractor: Mg Samidan Const
- High Concurrent Workload for One ContractorSt Timothy Const CorpContractor: St Timothy Const Corp
Contractors on linked DPWH projects
None linked to Tattawa itself; showing Peñarrubia.
- ST TIMOTHY CONST CORP4 projects · ₱290,988,246.10
- 739 BUILDERS6 projects · ₱239,519,335.25
- A D MARRERO GEN CONST11 projects · ₱205,215,689.90
- MG SAMIDAN CONST2 projects · ₱184,557,932.48
- R A FANGLAYAN RAF GEN CONST INC FORMERLY:RAF GEN CONST6 projects · ₱167,947,604.71
- PHESCO INC 1453 projects · ₱102,963,868.76
- VIKING CONST1 project · ₱8,367,615.92
- SEMBRI CONST1 project · ₱7,422,206.79

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Tattawa
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
