ARCHIE PRINCE CONST is listed as a company organization in Philippine public procurement records on this site, with 1 linked DPWH project(s) totaling about ₱3,911,617.76. No delivery grade published yet (insufficient linked public records).
ARCHIE PRINCE CONST
N/GGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 1
- Total value
- ₱3,911,617.76
- Published flags
- 0
- Region
- Mountain Province 1st DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- ARCHIE ALILIA PAKIPAC · Authorized Managing Officer (PCAB license 51192) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ARCHIE PRINCE CONST — not an accusation or finding of wrongdoing.
Not graded (insufficient records — fewer than 5 linked DPWH projects in this database; 1 on record).
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
1 geotagged project — Open full map · Download projects (CSV)
- BIP, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MABA-AY, BAUKO, MOUNTAIN PROVINCE25PI0055 · ₱3,911,617.76 · mapped
Equipment & capacity
PCAB license
- License no.
- 51192
- Category
- D · Small B
- Minimum net worth for this category
- ₱2,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Sep 13, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 51192); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DepEd Infrastructure: 3 awards · ₱15,093,631.63
- Municipality of Bauko, Mountain Province Infrastructure: 9 awards · ₱12,579,322.82
- Province of Mountain Province Infrastructure: 9 awards · ₱9,896,141.85
- NIA Infrastructure: 2 awards · ₱4,512,611.68
- DPWH Infrastructure: 1 award · ₱3,911,617.76
- Provincial Training Center-Mountain Province Goods & services: 1 award · ₱72,900.00
- CW- MP-45-2025
- 25PI0055₱3,911,617.76· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - MT. PROVINCE I DEO
- CLUSTER 18-2025
- REHAB & MAINT OF BANATA- SUMEY-ANG ROAD, BAUKO
- B PACKAGE 2024 – 16 Construction/Rehabilitation/Installation and Purchase of S.K. Hall, Drainage Pathway, Distribution Tank, Water System and Solar Lights
- B PACKAGE 2024 – 14 Completion/Construction and Improvement of Day Care Center, Multi-purpose Open Gym, MRF and Pathway with Railings
- B PACKAGE 2024 – 09 Construction and Improvement of Parking Space, Drainage and Pathways
- B PACKAGE 2024 – 13 Continuation of Multi-purpose Hall, (Phase 2)
- CLUSTER 95-2024
- CLUSTER 81-2024
- REHAB & IMP OF PANDAYAN ELEM SCHOOL STAGE, TADIAN
- B PACKAGE 2024 – 01 Construction and Improvement of SK Hall, Barangay Hall, Day Care Center, Drainage Canal, Pathway and Community Kitche
- CLUSTER 13-2024
- CW-MP-37-2024
- B PACKAGE 2023 – 04 Construction/Improvement/Fencing and Removal of Pathway, Riprap, Pathway Railings, Water Source, Potable Water, Day Care Center, Primary School, Clinic Site & Multi-purpose, Baran
- CONSTRUCTION PROJECT₱11,053,052.59· 2023-12-13· Other construction· DEPARTMENT OF EDUCATION - SCHOOLS DIVISION OF MT. PROVINCE
- CLUSTER 67-2023
- P – 2023 – 13 Improvement and Rehabilitation of Lilimo - Dumanggap Road and Lamagan – Panta Pathway & Slope Protection
- Construction Materials and Labor₱94,378.25· 2023-07-20· Other construction· DEPARTMENT OF EDUCATION - SCHOOLS DIVISION OF MT. PROVINCE
- IMPROVEMENT OF CHUMILANG PATHWAY
- REHAB/ IMP OF MABILIG-BATO SADSADAN ROAD
- 2023 professional fee
- Repair/ Reconstruction & Replacement of Classrooms₱3,946,200.79· 2023-04-14· School repair· DEPARTMENT OF EDUCATION - SCHOOLS DIVISION OF MT. PROVINCE
- B PACKAGE 2022 – 08 Construction/Improvement/Fencing and Installation of Potable Water Source, Watershed, Pathway, Farm to Market Road, Road, Day Care Center, Primary School, Canal Drainage, Pathway
- B PACKAGE 2022 – 11 Construction and Improvement of Parking Space, Drainage and Pathways
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →