Buildings and Facilities16CC0183No coordinates published by DPWH

CONSTRUCTION OF TWO STOREY FOUR CLASSROOM - STA. CRUZ ES GUIGUINTO, BULACAN

CONSTRUCTION OF TWO STOREY FOUR CLASSROOM - STA. CRUZ ES GUIGUINTO, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱5,549,669.03. Status: Reported complete (DPWH). Contractor on record: WASSECON CORP. Figures trace to dpwh.

Bulacan 1st DEO, Region III

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region III

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-16-0014765 · ₱4,044,848 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱5,549,669 · WASSECON CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,387,417 per classroom= 0.7x the Region III median (n=829)

Contract cost ₱5,549,669 ÷ 4 classroom read from the DPWH title (“FOUR CLASSROOM”; classroom count in title). National percentile: 32. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TWO STOREY FOUR CLASSROOM - STA. CRUZ ES GUIGUINTO, BULACAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Angat River, Bintog, Plaridel. Bulacan
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-16-0014765

₱4,044,848.00 · FY2016

Released to Jose Fabella Memorial High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Sta. Cruz Elem. School Guiguinto, Bulacan

₱5,549,669.03 · WASSECON CORP

Award / contract ref: 16CC0183

Contractor

B

26 projects · ₱59.1M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PLAZA ALDEA, TANAY, RIZAL

Rizal 2nd DEO, Region IV-A

2023₱9.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI- PURPOSE / FACILITIES CONSTRUCTION/ IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. 601, ZONE 59, BACOOD, MANILA

North Manila DEO, National Capital Region

2018₱4.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION / REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS AT R. MAGSAYSAY BLVD., MANILA - (K0004 + -200.50) - (K0004 + 188.60)

North Manila DEO, National Capital Region

2019₱4.6M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI - PURPOSE / FACILITIES - IMPROVEMENT OF MULTI-PURPOSE BUILDING, BARANGAY 587 - A, ZONE 58, STA. MESA MANILA

North Manila DEO, National Capital Region

2019₱3.8M
Reported complete (DPWH)
No sat.

IMPROVEMENT OF BARANGAY HALL, BARANGAY 646, SAN MIGUEL, MANILA CITY 6TH LD CONST./IMPROVEMENT OF BARANGAY HALL, BRGY. 629, STA MESA, MANILA CITY 6TH LD IMPROVEMENT OF MULTI-PURPOSE BUILDING BRGY. 600, STA. MESA, MANILA CITY 6TH LD METRO MANILA 6TH LD.

North Manila DEO, National Capital Region

2016₱3.4M
Reported complete (DPWH)
No sat.

EXPANSION/CONSTRUCTION OF LYING-IN AND PROVISION OF EQUIPMENT, V.L. FUGOSO HEALTH CENTER STA. CRUZ, MANILA

North Manila DEO, National Capital Region

2016₱3.1M
Reported complete (DPWH)
View all 26 projects →

4. Implementation

Contract Amount

₱5,549,669.03

Progress

Reported complete (DPWH)

Start Date

November 2, 2017

Target End

March 1, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Bulacan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.