Buildings and Facilities16OH0063

PROPOSED CONSTRUCTION OF FOUR (4) STOREY TWENTY (24) CLASSROOMS FOR T. PAEZ ELEMENTARY SCHOOL, PASAY

PROPOSED CONSTRUCTION OF FOUR (4) STOREY TWENTY (24) CLASSROOMS FOR T. PAEZ ELEMENTARY SCHOOL, PASAY is a DPWH-tracked public work in South Manila DEO, National Capital Region. Reported contract value: ₱44,760,071.56. Status: Reported complete (DPWH). Contractor on record: MRRM TRADING. Figures trace to dpwh.

South Manila DEO, National Capital Region
Region: National Capital Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱7,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Estero de Pandacan (Flood Control Structure and Fencing), Zone 92/93, Pandacan, Manila 6th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXIII-16-0003972

₱43,000.00 · FY2016

Released to Amando A. Fabio Memorial National High School Relea (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

79 projects · ₱2.9B total · 0 flags

Other projects by this contractor

SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN

Region III, Region III

2024₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY.

Region IV-A, Region IV-A

2018₱92.6M
Reported complete (DPWH)
No sat.

REHABILITATION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT. - STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 07+486.20 - STA. 07+634.80, STA. FE, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0008+940 - K0008+986, TABLAS ISLAND, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

CONST. OF TWO (2) UNITS FOUR (4) STOREY, SIXTEEN (16) CLASSROOM S/B AT PEDRO E. DIAZ, H/S, MUNTINLUP

Las Piñas-Muntinlupa DEO, National Capital Region

2018₱78.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+100.00 - STA. 11+200.00, STA. 11+510.00 - STA. 11+548.30, SAN AGUSTIN, ROMBLON

Romblon DEO, Region IV-B

2022₱77.2M
Reported complete (DPWH)
View all 79 projects →

4. Implementation

Contract Amount

₱44,760,071.56

Progress

Reported complete (DPWH)

Start Date

August 24, 2016

Target End

April 20, 2017