Roads24IJ0079

CSSP: CONSTRUCTION OF ROAD, BARANGAY SAN AGUSTIN - BARANGAY HINUGACAN ROAD (PHASE 1), GANDARA, SAMAR

CSSP: CONSTRUCTION OF ROAD, BARANGAY SAN AGUSTIN - BARANGAY HINUGACAN ROAD (PHASE 1), GANDARA, SAMAR is a DPWH-tracked public work in Samar 1st DEO, Region VIII. Reported contract value: ₱24,725,487.60. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: SFORT BUILDERS. Figures trace to dpwh.

Samar 1st DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-24-0019554 · ₱3,782,550 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24IJ0079 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-08-10 → 2025-09-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP: CONSTRUCTION OF ROAD, BARANGAY SAN AGUSTIN - BARANGAY HINUGACAN ROAD (PHASE 1), GANDARA, SAMAR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Gandara River, Barangay Buñagan, Gandara, Samar
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-24-0019554

₱3,782,550.00 · FY2024

Released to Adiong Memorial State College (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱24,725,487.60

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 2, 2024

Target End

March 18, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)SamarGandaraHinugacan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.