Bridges22CI0039

WIDENING OF SAN ROQUE BRIDGE I - KO107+943-KO107+958, MAGALANG, PAMPANGA

WIDENING OF SAN ROQUE BRIDGE I - KO107+943-KO107+958, MAGALANG, PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱14,699,936.88. Status: Reported complete (DPWH). Contractor on record: RD5 CONST. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-22-0008163 · ₱38,865,479 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CI0039 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-10-29 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: WIDENING OF SAN ROQUE BRIDGE I - KO107+943-KO107+958, MAGALANG, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Santol Creek, San Jose Section, Brgy. San Jose, Floridablanca, Pampanga
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-22-0008163

₱38,865,479.00 · FY2022

Released to Regional Office XI - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

30 projects · ₱244.6M total · 4 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF ROAD MINING-TABUN, ANGELE

Pampanga 3rd DEO, Region III

2023₱19.6M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONCRETING OF ROADS AND DRAINAGE BRGY SAN PEDRO II, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱14.7M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES ALONG DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM AT PAMPANGA DELTA RIS, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱14.7M
Past target date (DPWH On-Going)
No sat.

INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG MANILA NORTH RD (S04206LZ)-K0094+375-K0095+377, DOLORES, MABALACAT, PAMPANGA

Pampanga 3rd DEO, Region III

2024₱14.4M
Reported complete (DPWH)
No sat.

INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG MANILA NORTH RD (S04206LZ)-K0095+597-K0096+618, TABUN, MABALACAT, PAMPANGA

Pampanga 3rd DEO, Region III

2024₱14.4M
Reported complete (DPWH)
No sat.

SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF ROADS AND DRAINAGE AT BRGY AYALA, MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱14.4M
Past target date (DPWH On-Going)
View all 30 projects →

4. Implementation

Contract Amount

₱14,699,936.88

Progress

Reported complete (DPWH)

Start Date

February 8, 2022

Target End

August 6, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “WIDENING OF SAN ROQUE BRIDGE I - KO107+943-KO107+958, MAGALANG, PAMPANGA.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/011cca55-f7db-4ab5-bd17-4d443c9c1ec6

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaMagalangSan Roque
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.