Buildings and Facilities22CE0090

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PUNCAN, CARRANGLAN, NUEVA ECIJA

CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PUNCAN, CARRANGLAN, NUEVA ECIJA is a DPWH-tracked public work in Nueva Ecija 1st DEO, Region III. Reported contract value: ₱4,850,077.68. Status: Reported complete (DPWH). Contractor on record: NULAS BUILDERS. Figures trace to dpwh.

Nueva Ecija 1st DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱12,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-22-0008471 · ₱125,000 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CE0090 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-13 → 2022-06-22

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PUNCAN, CARRANGLAN, NUEVA ECIJA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱12,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure at Malayop Creek, Barangay Bertese, Quezon, Nueva Ecija
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-22-0008471

₱125,000.00 · FY2022

Released to PENRO Guimaras (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

86 projects · ₱752.5M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS AT SAPANG CABALANTIAN, TAGUM CREEK TO BURACAN CREEK (ZONE 2 - ZONE 4)

Pampanga 1st DEO, Region III

2024₱64.2M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (EXECUTIVE BUILDING), BARANGAY SAN NICOLAS, MINALIN, PAMPANGA

Pampanga 1st DEO, Region III

2024₱47.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FOUR(4)-STOREY, SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT CADUANG TETE HS, MACABEBE, PAMPANGA

Pampanga 1st DEO, Region III

2018₱33.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO (2) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING AT LOURDES E.S., MINALIN, PAMPANGA

Pampanga 1st DEO, Region III

2018₱25.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, SITIO LACMIT, BRGY. SAN ISIDRO, MINALIN, PAMPANGA (PHASE 1), MINALIN. PAMPANGA

Pampanga 1st DEO, Region III

2024₱23.4M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING RELATED GROUND IMPROVEMENTS, MACABEBE NATIONAL HIGH SCHOOL, BARANGAY SAN ROQUE, MACABEBE, PAMPANGA

Pampanga 1st DEO, Region III

2022₱23.3M
Reported complete (DPWH)
View all 86 projects →

4. Implementation

Contract Amount

₱4,850,077.68

Progress

Reported complete (DPWH)

Start Date

February 24, 2022

Target End

August 22, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)Nueva EcijaCarranglanPuncan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.