Roads25PG0044

CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NAL'S. RDS.-TERTIARY ROADS-BAN-HUNG-BENG BDRY. RD.-K0386+218,K0389+336-K0389+354,K0394+522,K0396+727,K0397+142-K0397+225,K0397+992,K0398+405,K0398+693,K0402+295, TINOC, IFUGAO

CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NAL'S. RDS.-TERTIARY ROADS-BAN-HUNG-BENG BDRY. RD.-K0386+218,K0389+336-K0389+354,K0394+522,K0396+727,K0397+142-K0397+225,K0397+992,K0398+405,K0398+693,K0402+295, TINOC, IFUGAO is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱20,019,445.64. Status: Past target date (DPWH On-Going). Contractor on record: LOKNOY CONST. Figures trace to dpwh.

Ifugao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-25-0019468 · · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25PG0044 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    39% reported · imagery 2023-02-10 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST'N./UPGRADING/REHAB. OF DRAINAGE ALONG NAL'S. RDS.-TERTIARY ROADS-BAN-HUNG-BENG BDRY. RD.-K0386+218,K0389+336-K0389+354,K0394+522,K0396+727,K0397+142-K0397+225,K0397+992,K0398+405,K0398+693,K0402+295, TINOC, IFUGAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Poblacion Pakawit Communal Irrigation System (CIS), Tinoc, Ifugao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-25-0019468

₱-7,848,864.00 · FY2025

Released to Bicol Region General Hospital and Geriatric Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

21 projects · ₱165.0M total · 0 flags

Other projects by this contractor

No sat.

REHAB./RECON'STN./UPGRADING OF DAMAGED PAVED ROADS ALONG KIANGAN-TINOC-BUGUIAS RD. K0351+274-K0351+395, K0353+834-K0353+874,K0355+291-K0355+327,K0355+453-K0355+498,K0357+957-K0358+610, TINOC,IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2025₱21.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - KIANGAN-TINOC-BUGUIAS RD - (S00634LZ) CHAINAGE 42685 - CHAINAGE 43246, CHAINAGE 44572 - CHAINAGE 44870, CHAINAGE 45301 - CHAINAGE 46081, CHAINAGE 46905 - CHAINA

Cordillera Administrative Region, Cordillera Administrative Region

2024₱21.5M
Past target date (DPWH On-Going)
No sat.

CONCRETING OF SITIO BANAAW TO SITIO TAMMANGAN, BARANGAY WANGWANG FMR, BARANGAY WANGWANG, TINOC, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2025₱14.5M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONSTRUCTION OF NAT'L. ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BANAUE-HUNGDUAN-BENGUET BDRY. RD.-K0405+438-K0405+506,K0405+883-K0405+900, K0405+926-K0405+977, K0407+(-052)-K0407+(-039), TINOC, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2023₱12.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BANAUE-HUNGDUAN-BENGUET BDRY. RD.-K0372+730-K0372+771,K0378+490-K0378+513,K0379+177-K0379+191,K0380+533-K0380+572,K0382+569-K0382+596, HUNGDUAN, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2025₱9.6M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BAN-HUNG-BENG BDRY. RD.-K0396+496-K0396+525,K0397+052-K0397+081, TINOC, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2023₱5.5M
Reported complete (DPWH)
View all 21 projects →

4. Implementation

Contract Amount

₱20,019,445.64

Progress

Past target date (DPWH On-Going)

Start Date

March 24, 2025

Target End

November 11, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)IfugaoTinocTulludan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.