Roads18FD0026

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MILAOR-MINALABAC-PILI RD-K0436+095-K0436+155,K0436+320-K0436+545

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MILAOR-MINALABAC-PILI RD-K0436+095-K0436+155,K0436+320-K0436+545 is a DPWH-tracked public work in Camarines Sur 2nd DEO, Region V. Reported contract value: ₱7,352,900.00. Status: Reported complete (DPWH). Contractor on record: PMJ CONST. Figures trace to dpwh.

Camarines Sur 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-18-0032622 · · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱7,352,900 · PMJ CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-11-28 → 2020-01-11

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱25,799,649 per km= 0.7x the Region V median (n=146)

Contract cost ₱7,352,900 ÷ 0.285 km read from the DPWH title (“K0436+095-K0436+155; K0436+320-K0436+545”; K-post / station range length). National percentile: 42. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MILAOR-MINALABAC-PILI RD-K0436+095-K0436+155,K0436+320-K0436+545

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation/Improvemen t of Bombon Flood Control, Bombon, Camarines Sur
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-18-0032622

₱0.00 · FY2018

Released to Division of Camarines Sur (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

ROADS

₱7,352,900.00 · PMJ CONSTRUCTION

Contractor

B

22 projects · ₱69.0M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF CLASSROOMS BATCH 1, THREE STOREY SIX CLASSROOM, STO. TOMAS NORTH CENTRAL SCHOOL, STO

Batangas 3rd DEO, Region IV-A

2018₱13.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICE, REHABILITATION OF MULTI-PURPOSE BUILDING IN THE MUNICIPALITY OF LAUREL, BATANGAS

Batangas 3rd DEO, Region IV-A

2022₱9.9M
Reported complete (DPWH)
No sat.

CLUSTER PROJECTS: 1. REHAB. & IMP'T OF BRGY. MAMBULO NUEVO TO DUANG NIOG ROAD, LIB., CS; 2. REHAB. &

Region V, Region V

2018₱6.2M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STA. TERESITA, STO. TOMAS, BATANGAS

Batangas 3rd DEO, Region IV-A

2024₱4.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING IN STO. TOMAS, BATANGAS

Batangas 3rd DEO, Region IV-A

2022₱4.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY QUILING, TALISAY, BATANGAS

Batangas 3rd DEO, Region IV-A

2025₱4.8M
Reported complete (DPWH)
View all 22 projects →

4. Implementation

Contract Amount

₱7,352,900.00

Progress

Reported complete (DPWH)

Start Date

February 8, 2018

Target End

April 28, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MILAOR-MINALABAC-PILI RD-K0436+095-K0436+155,K0436+320-K0436+545.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/054c5a40-f9e8-46b8-89e6-3deb29420747

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurMinalabacDel Carmen-Del Rosario
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.