Water Provision and Storage20LA0325

CONSTRUCTION OF WATER SYSTEM, LAAK NHS, BRGY. POBLACION LAAK, COMPOSTELA VALLEY

CONSTRUCTION OF WATER SYSTEM, LAAK NHS, BRGY. POBLACION LAAK, COMPOSTELA VALLEY is a DPWH-tracked public work in Davao de Oro 1st DEO, Region XI. Reported contract value: ₱1,979,520.84. Status: Reported complete (DPWH). Contractor on record: DOUBLE J CONST AND SUPPLY. Figures trace to dpwh.

Davao de Oro 1st DEO, Region XI
Region: Region XI

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROVIII-20-0015835 · ₱5,000,000 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20LA0325 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-03-17 → 2024-10-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF WATER SYSTEM, LAAK NHS, BRGY. POBLACION LAAK, COMPOSTELA VALLEY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Matti River, Brgy. Matti, Digos City, Davao del Sur
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVIII-20-0015835

₱5,000,000.00 · FY2020

Released to Division of Catbalogan City (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱1,979,520.84

Progress

Reported complete (DPWH)

Start Date

October 19, 2020

Target End

February 15, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao de OroLaakLaac
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.