DOUBLE J CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 142 linked DPWH project(s) totaling about ₱1,893,896,414.28. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
DOUBLE J CONST AND SUPPLY
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 142
- Total value
- ₱1,893,896,414.28
- Published flags
- 0
- Region
- Davao de Oro 1st DEO · Region XI
Online presence
Google Maps: Double J Construction and Supply Mawab branchGoogle Maps, 2026-10-22
Purok 19, Brgy, Poblacion, Mawab, Davao de Oro
Licensed officers (PCAB)
- Michael Carbonilla Salarda · Authorized Managing Officer (PCAB license 40528) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for DOUBLE J CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 89.30 / 100 · Projects in sample: 142 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 82.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 82.4
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 120
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 136
- pastTargetOngoingProjects
- 12
- undatedCompletedProjectsExcluded
- 5
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 142
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 142
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 142
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 142
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 141 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- WIDENING OF ROAD ALONG SURIGAO-DAVAO COASTAL ROAD, PANTUKAN, COMPOSTELA VALLEY PROVINCE17LA0027 · ₱79,815,134.72 · mapped
- ROAD WIDENING ALONG NABUNTURAN-MARAGUSAN ROAD (S00127MN) NABUNTURAN-MARAGUSAN, DAVAO DE ORO22LA0066 · ₱56,584,055.00 · mapped
- CONCRETING OF CAMP GENERAL MANUEL T YAN SR. ROAD, CAMP GENERAL MANUEL T YAN SR., BRGY. TUBORAN, MAWAB, COMPOSTELA VALLEY21LA0231 · ₱55,485,322.33 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), PHASE 2, BARANGAY POBLACION, MAWAB, DAVAO DE ORO25LA0045 · ₱49,450,641.44 · mapped
- CONSTRUCTION OF REVETMENT ALONG BUKAL RIVER, BUKAL, NABUNTURAN, DAVAO DE ORO24LA0123 · ₱48,949,446.32 · mapped
- CONSTRUCTION OF REVETMENT FLOOD CONTROL GARINAN CREEK, POBLACION, MAWAB, DAVAO DE ORO24LA0137 · ₱48,249,999.13 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAWAB MUNICIPAL HALL (PHASE III), MAWAB, DAVAO DE ORO25LA0057 · ₱44,499,981.18 · mapped
- RECHANNELING AND CONSTRUCTION OF DIKE IN KINGKING RIVER AT MOSAHAMAT SECTION (LEFT SIDE) PANTUKAN 2ND LD, COMPOSTELA VALLEY PROVINCE17LA0051 · ₱44,251,391.63 · mapped
- REHABILITATION/RECONSTRUCTION OF REVETMENT FLOOD MITIGATION STRUCTURE ALONG TAGBALAOBAO RIVER LOCATED AT PUROKS MADRE DE CACAO, MABOLO, NARRA, AND MAHOGANY, BRGY. PINDASAN, MABINI, DAVAO DE ORO24L00336 · ₱42,944,044.53
- SAN ROQUE - SAN ISIDRO ROAD CONNECTING TO NABUNTURAN PUBLIC TRANSPORT TERMINAL AND PARK 5, SAN ISDIRO FOOD TERMINAL, NABUNTURAN, DAVAO DE ORO22LA0063 · ₱41,159,963.48 · mapped
- WIDENING OF CADUNAN BRIDGE (B00205MN) INCLUDING APPROACHES, MABINI ALONG SURIGAO-DAVAO COASTAL ROAD, COMPOSTELA VALLEY PROVINCE17LA0033 · ₱37,161,596.42 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, HALL OF JUSTICE, BARANGAY CABIDIANAN, NABUNTURAN, DAVAO DE ORO25LA0088 · ₱34,600,039.03 · mapped
- ROAD WIDENING - ALONG NABUNTURAN - MAINIT PARK ROAD (S00138MN), COMPOSTELA VALLEY PROVINCE20LA0016 · ₱32,289,871.06 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE), BARANGAY CABIDIANAN, NABUNTURAN, DAVAO DE ORO24LA0036 · ₱29,649,544.72 · mapped
- CONSTRUCTION OF ROAD, AMOR CRUZ, LAAK, DAVAO DE ORO22LA0135 · ₱29,399,970.28 · mapped
- CONSTRUCTION OF ROAD, AMPAWID, LAAK, DAVAO DE ORO22LA0132 · ₱29,399,959.34 · mapped
- CONSTRUCTION OF ROAD ALONG NATIONAL HIGHWAY JUNCTION TO BRGY. STA. EMILIA, NEW BETHLEHEM TO LUBHO LAAK, DAVAO DE ORO22LA0076 · ₱29,399,855.77 · mapped
- CONSTRUCTION OF CONCRETE ROAD, BINASBAS-IMELDA ROAD, LAAK, DAVAO DE ORO24LA0022 · ₱29,398,903.00 · mapped
- CONCRETING OF NATIONAL HIGHWAY JUNCTION TO BRGY. STA. EMILIA, NEW BETHLEHEM TO LUBHO LAAK, COMPOSTELA VALLEY PROVINCE20LA0179 · ₱29,349,727.94 · mapped
- CONCRETING OF ROAD BRGY. POBLACION LAAK-BRGY. INAKAYAN, LAAK, COMPOSTELA VALLEY PROVINCE19LA0433 · ₱29,342,407.71 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - DAANG MAHARLIKA (MN) - K1427+251 - K1429+917, DAVAO DE ORO24L00046 · ₱28,660,034.19 · mapped
- CONCRETING NATIONAL HIGHWAY JUNCTION TO BRGY. STA EMILIA, NEW BETHLEHEM TO LUBHO LAAK, COMPOSTELA VALLEY PROVINCE19LA0315 · ₱28,517,470.13 · mapped
- ROAD WIDENING - ALONG ASUNCION - SAN ISIDRO - LAAK - VERUELA RD., COMPOSTELA VALLEY PROVINCE20LA0011 · ₱26,467,707.06 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BLDG. (PUBLIC MARKET) MAWAB, COMPOSTELA VALLEY20LA0136 · ₱24,500,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (PUBLIC MARKET), MAWAB, DAVAO DE ORO22LA0137 · ₱24,499,979.95 · mapped
- CONSTRUCTION OF ROAD, PUROK 1 - PUROK 7 - PUROK 8, NUEVA VISAYAS, MAWAB, DAVAO DE ORO24LA0061 · ₱24,499,858.51 · mapped
- CONSTRUCTION OF CONCRETE ROAD, STA. EMILIA - NEW BETHLEHEM, LUBHO, LAK, DAVAO DE ORO21LA0151 · ₱24,449,601.49 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABIDIANAN, NABUNTURAN, DAVAO DE ORO22LA0128 · ₱19,799,863.48 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET PHASE 1) POB. MAWAB, COMPOSTELA VALLEY PROVINCE18LA0317 · ₱19,600,000.00 · mapped
- IMPROVEMENT OF MULTI-PURPOSE BUILDING, NABUNTURAN COMPREHENSIVE NATIONAL HIGH SCHOOL, NABUNTURAN COMPOSTELA VALLEY PROVINCE19LA0504 · ₱19,599,978.82 · mapped
- IMPROVEMENT OF MULTI-PURPOSE BUILDING, NABUNTURAN COMPREHENSIVE NATIONAL HIGH SCHOOL, NABUNTURAN COMPOSTELA VALLEY20LA0285 · ₱19,599,942.97 · mapped
- CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (MUNICIPAL GYM) LAAK, DAVAO DE ORO22LA0162 · ₱19,599,923.93 · mapped
- CONSTRUCTION OF MPB PUBLIC MARKET, MAWAB DAVAO DE ORO21LA0090 · ₱19,599,889.72 · mapped
- COMPLETION OF MPB (MUNICIPAL GYM) LAAK, DAVAO DE ORO (PHASE 2)21LA0194 · ₱19,599,812.93 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BLDG., (MUNICIPAL GYM) LAAK, COMPOSTELA VALLEY20LA0284 · ₱19,549,705.15 · mapped
- CONCRETING OF BRGY. KIOKMAY TO BRGY. AGUINALDO FMR, BRGY. KIOKMAY, LAAK, DAVAO DE ORO25LA0073 · ₱14,875,064.43 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (PROVINCIAL SPORTS COMPLEX) IN CABIDIANAN, NABUNTURAN, DAVAO DE ORO23LA0103 · ₱14,799,236.43 · mapped
- CONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, TWO (2) CLASSROOM BUILDING AT: CW1. AMORCRUZ ES, LAAK CW2. CEBOLEDA ES, LAAK CW3. KALIGUTAN ES, LAAKCONSTRUCTION OF ONE (1) UNIT, ONE (1) STOREY, FOUR (4) CLASSROOM BUILDING AT: CW4. DALIMDIM ES,17LA0268 · ₱14,764,985.19 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (COMPLETION) LAAK, COMPOSTELA VALLEY (MUNICIPAL MPB) COMPOSTELA VALLEY PROVINCE19LA0503 · ₱14,700,000.00 · mapped
- SAN ROQUE - SAN ISIDRO ROAD CONNECTING TO NABUNTURAN PUBLIC TRANSPORT TERMINAL AND PRK 5, SAN ISIDRO FOOD TERMINAL, NABUNTURAN COMPOSTELA VALLEY PROVINCE20LA0020 · ₱14,700,000.00 · mapped
- MAINIT ROAD LEADING TO MAINIT HOT SPRING OF MAINIT PROTECTED LANDSCAPE, BRGY. MAINIT, NABUNTURAN COMPOSTELA VALLEY PROVINCE20LA0017 · ₱14,700,000.00 · mapped
- CONSTRUCTION OF CONCRETING ROAD, DONA JOSEFA, STA. EMELIA ROAD (PHASE 2) LAAK, DAVAO DE ORO21LA0129 · ₱14,699,932.23 · mapped
- CONSTRUCTION OF ROAD, MALINAO, LAAK, DAVAO DE ORO22LA0118 · ₱14,699,876.72 · mapped
- CONCRETING OF ROAD, POBLACION LAAK COMPOSTELA VALLEY PROVINCE20LA0062 · ₱14,649,958.53 · mapped
- CONSTRUCTION OF ROAD BRGY. MALINAO, LAAK, DAVAO DE ORO23LA0056 · ₱14,649,316.47 · mapped
- CONSTRUCTION OF ROAD AND WIDENING, MAWAB, COMPOSTELA VALLEY PROVINCE18LA0275 · ₱14,473,513.01 · mapped
- REPAIR/REHABILITATION OF ROAD SLOPE PROTECTION STRUCTURE ALONG NABUNTURAN-MAINIT PARK ROAD (S00138MN) STA.1440+900-K1440+980, BRGY. MAINIT, NABUNTURAN, DAVAO DE ORO24LA0126 · ₱13,224,295.84 · mapped
- BASAK ROAD CONNECTING NABUNTURAN PUBLIC TRANSPORT TERMINAL AND BASAK RURAL IMPROVEMENT CLUB (BARIC) FOOD PROCESSING SHARED SERVICE FACILITY (SSF) IN SUPPORT OF OIL PALM, FOOD PROCESSING AND WOOD CRAFT INDUSTRIES, BRGY. BASAK NABUNTURAN COMPOSTELA VALLEY20LA0077 · ₱12,934,982.92 · mapped
- POBLACION ROAD CONNECTING LAAK PUBLIC TRANSPORTTERMINAL AND CRUMB PROCESSING PLANT IN SUPPORT OF RUBBER INDUSTRY, BRGY. POBLACION, LAAK COMPOSTELA VALLEY PROVINCE20LA0018 · ₱12,444,950.33 · mapped
- CONSTRUCTION OF ONE (1) UNIT, UNIQUE TECHNICAL AND VOCATIONAL FACILITIES/WORKSHOP BUILDING AT:CW1. DON VICENTE ROMUALDEZ NHS, LAAK CW2. KAPATAGAN NHS, LAAKCW3. MELALE NHS, LAAKCOMPOSTELA VALLEY PROVINCE17LA0283 · ₱12,428,391.53 · mapped
Equipment & capacity
PCAB license
- License no.
- 40528
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Aug 26, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 40528); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 4 GPPB CPES releases; average final rating 92.2% over 1 rated project; 3 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 8, 2024 | Prov. Davao de Oro | ₱4,850,812.00 | On-going | 88.8% | — | 39th (rev), p. 52 |
| Jun 22, 2023 | DPWH | ₱56,584,055.00 | Final | 92.9% | 92.2% | 36th, p. 56 |
| Oct 3, 2022 | DPWH | ₱56,483,447.00 | On-going | 91.7% | — | 35th, p. 43 |
| Jun 27, 2022 | DPWH | ₱55,485,322.00 | Completed | — | — | 34th, p. 22 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →