GAA 2017 MFO-117P00007

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) CLAVERIA - CALANASAN - KABUGAO ROAD, K0668+773 - K0671+223, K0671+249 - K0672+638

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) CLAVERIA - CALANASAN - KABUGAO ROAD, K0668+773 - K0671+223, K0671+249 - K0672+638 is a DPWH-tracked public work in Cordillera Administrative Region, Cordillera Administrative Region. Reported contract value: ₱144,749,976.58. Status: Reported complete (DPWH). Contractor on record: KVC CONST. Figures trace to dpwh.

Cordillera Administrative Region, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17P00007 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-12-16 → 2025-03-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱37,705,125 per km= 0.9x the Cordillera Administrative Region median (n=103)

Contract cost ₱144,749,977 ÷ 3.839 km read from the DPWH title (“K0668+773 - K0671+223; K0671+249 - K0672+638”; K-post / station range length). National percentile: 73. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) CLAVERIA - CALANASAN - KABUGAO ROAD, K0668+773 - K0671+223, K0671+249 - K0672+638

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

65 projects · ₱3.1B total · 1 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS, BALLAY - TABIO - TONOMAN - BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2016₱189.6M
Reported complete (DPWH)
No sat.

RD UPGRDNG (UNPVD TO PVD) CLAVERIA - CALANASAN - KABUGAO ROAD K0638+275

Cordillera Administrative Region, Cordillera Administrative Region

2016₱146.2M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) CLAVERIA - CALANASAN - KABUGAO ROAD, K0665+261 - K0668+773

Cordillera Administrative Region, Cordillera Administrative Region

2017₱144.7M
Reported complete (DPWH)
No sat.

ROAD UPGRADING CLAVERIA - CALANASAN - KABUGAO ROAD K0 646+173

Cordillera Administrative Region, Cordillera Administrative Region

2016₱140.7M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS POBLACION-LAPPA-MARAG ROAD LEADING TO MARAG VALLEY, LUNA, APAYAO

Cordillera Administrative Region, Cordillera Administrative Region

2016₱140.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS ABRA CERVANTES ROAD, ABRA

Cordillera Administrative Region, Cordillera Administrative Region

2020₱101.3M
Reported complete (DPWH)
View all 65 projects →

4. Implementation

Contract Amount

₱144,749,976.58

Progress

Reported complete (DPWH)

Start Date

March 16, 2017

Target End

July 22, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoCalanasanNaguilian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.