Roads19DM0076

REHABILITATION OF PAGSANGAHAN - KUMBAHAN, SAN FRANCISCO, QUEZON

REHABILITATION OF PAGSANGAHAN - KUMBAHAN, SAN FRANCISCO, QUEZON is a DPWH-tracked public work in Quezon 3rd DEO, Region IV-A. Reported contract value: ₱4,900,000.00. Status: Reported complete (DPWH). Contractor on record: WYDERWAYS BUILDERS AND SUPPLIES. Figures trace to dpwh.

Quezon 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0004171 · ₱46,809,683 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,783,668 · WYDERWAYS BUILDERS AND SUPPLIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-01-31 → 2023-01-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF PAGSANGAHAN - KUMBAHAN, SAN FRANCISCO, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0004171

₱46,809,683.00 · FY2019

Released to Jose R. Reyes Memorial Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Rehabilitation of Pagsangahan - Kumbahan San Franc

₱4,783,668.07 · WYDERWAYS BUILDERS AND SUPPLIES

Award / contract ref: 19DM0076

Contractor

C

40 projects · ₱800.9M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (LUCENA GENERAL HOSPITAL), LUCENA CITY, QUEZON

Quezon 2nd DEO, Region IV-A

2024₱144.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM: NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF FOUR-STOREY MULTI-PURPOSE BUILDING WITH EMPLOYEE'S QUARTERS OF DPWH QUEZON 2ND DEO, DALAHICAN ROAD, BARANGAY IBABANG DUPAY, LUC

Quezon 2nd DEO, Region IV-A

2023₱86.8M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 3), LUCENA CITY

Quezon 2nd DEO, Region IV-A

2024₱79.1M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 12), LUCENA CIT

Quezon 2nd DEO, Region IV-A

2023₱77.2M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION (COMPLETION) OF 3 STOREY CAMP NAKAR STATION HOSPITAL BUILDING, SOUTHERN LUZON COMMAND, LUCENA CITY

Quezon 2nd DEO, Region IV-A

2024₱75.7M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 7), QUEZON

Quezon 2nd DEO, Region IV-A

2022₱49.0M
Reported complete (DPWH)
View all 40 projects →

4. Implementation

Contract Amount

₱4,900,000.00

Progress

Reported complete (DPWH)

Start Date

July 15, 2019

Target End

October 12, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonSan FranciscoPagsangahan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.