Roads18GP0116

ROAD WIDENING OF ILOILO - CAPIZ RD. (OLD ROUTE) - K0089+200 - K0090+000

ROAD WIDENING OF ILOILO - CAPIZ RD. (OLD ROUTE) - K0089+200 - K0090+000 is a DPWH-tracked public work in Capiz 2nd DEO, Region VI. Reported contract value: ₱31,511,281.57. Status: Reported complete (DPWH). Contractor on record: WOODLAND CONST. Figures trace to dpwh.

Capiz 2nd DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-CAR-18-0015082 · ₱14,155,136 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18GP0116 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-04-29 → 2025-09-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱39,389,102 per km= 1.3x the Region VI median (n=261)

Contract cost ₱31,511,282 ÷ 0.8 km read from the DPWH title (“K0089+200 - K0090+000”; K-post / station range length). National percentile: 66. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING OF ILOILO - CAPIZ RD. (OLD ROUTE) - K0089+200 - K0090+000

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Control along Panay River Basin at Brgy. Manibad-Sinundojan, Mambusao, Capiz
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-CAR-18-0015082

₱14,155,136.00 · FY2018

Released to Capiz 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱31,511,281.57

Progress

Reported complete (DPWH)

Start Date

March 14, 2019

Target End

September 25, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)CapizDumalagSan Jose
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.