Roads24LI0068

CONSTRUCTION OF ROAD, MONKAYO - BOSTON ROAD (MONKAYO SECTION), DAVAO DE ORO

CONSTRUCTION OF ROAD, MONKAYO - BOSTON ROAD (MONKAYO SECTION), DAVAO DE ORO is a DPWH-tracked public work in Davao de Oro 2nd DEO, Region XI. Reported contract value: ₱77,199,349.23. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: AB APONESTO CONST PARTS AND SUPPLY INC. Figures trace to dpwh.

Davao de Oro 2nd DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱5,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-24-0017205 · ₱988,371,108 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24LI0068 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-09-07 → 2018-09-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD, MONKAYO - BOSTON ROAD (MONKAYO SECTION), DAVAO DE ORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Purok 2 Creek, Gabi, Compostela, Davao de Oro
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-24-0017205

₱988,371,108.00 · FY2024

Released to Davao de Oro 2nd DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱77,199,349.23

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

April 29, 2024

Target End

July 24, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao de OroMonkayoMount Diwata
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.