Buildings and Facilities18BJ0035

CONSTRUCTION OF NEW CLASSROOM UNDER DEPARTMENT OF EDUCATIONS CY 2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-SAN FABIAN ES KAPAYA, NUEVA VIZCAYA

CONSTRUCTION OF NEW CLASSROOM UNDER DEPARTMENT OF EDUCATIONS CY 2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-SAN FABIAN ES KAPAYA, NUEVA VIZCAYA is a DPWH-tracked public work in Nueva Vizcaya 2nd DEO, Region II. Reported contract value: ₱8,155,703.96. Status: Reported complete (DPWH). Contractor on record: E M BAYATAN CONST. Figures trace to dpwh.

Nueva Vizcaya 2nd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-18-0013956 · · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱8,155,704 · E.M. BAYATAN CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-04-19 → 2022-06-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF NEW CLASSROOM UNDER DEPARTMENT OF EDUCATIONS CY 2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-SAN FABIAN ES KAPAYA, NUEVA VIZCAYA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bintawan Flood Control, Brgy. Bintawan, Villaverde, Nueva Vizcaya
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-18-0013956

₱0.00 · FY2018

Released to Division of Nueva Ecija (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of New Classroom under DepED CY 2018

₱8,155,703.96 · E.M. BAYATAN CONSTRUCTION

Award / contract ref: 18BJ0035

Contractor

A

27 projects · ₱275.6M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, AMBAGUIO, NUEVA VIZCAYA (MUNICIPAL BUILDING)

Nueva Vizcaya DEO, Region II

2022₱29.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMCONSTRUCTION OF BENAY RIVER FLOOD CONTROL STRUCTURES, BAGUMBAYAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA

Nueva Vizcaya 2nd DEO, Region II

2019₱25.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM CONSTRUCTION OF WATER SYSTEM FOR BAROBBOB MASOC TO RESERVOIR LUYANG, BAYOMBONG, NUEVA

Nueva Vizcaya DEO, Region II

2025₱24.2M
Reported complete (DPWH)
No sat.

CONVERGENCE SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) ACCESS ROAD LEADING TO LOWER MAGAT ECOTOUR

Nueva Vizcaya DEO, Region II

2023₱20.8M
Reported complete (DPWH)
No sat.

CONST'N OF MULTI-PURPOSE BLDG. AT PUROK 6 BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2016₱19.8M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONCRETING/IMPROVEMENT OF ROAD IN BARANGAY POBLACION, AMBAGUIO, NUEVA VIZCAYA

Nueva Vizcaya DEO, Region II

2021₱18.7M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱8,155,703.96

Progress

Reported complete (DPWH)

Start Date

June 11, 2018

Target End

November 7, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaKayapaSan Fabian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.