Roads19PL0072

CONSTRUCTION OF LANLANA LOCAL ROAD, BRGY. LACNOG, TABUK CITY, KALINGA

CONSTRUCTION OF LANLANA LOCAL ROAD, BRGY. LACNOG, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱1,623,703.01. Status: Past target date (DPWH On-Going). Contractor on record: BAHRAMLEY CONST. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROIII-19-0011575 · ₱229,674 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19PL0072 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-04-13 → 2025-06-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF LANLANA LOCAL ROAD, BRGY. LACNOG, TABUK CITY, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-19-0011575

₱229,674.00 · FY2019

Released to al Wo Baler National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

31 projects · ₱343.7M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM(BIP)- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, BRGY. CAGLAYAN-MAUBBA TO MAKATEL, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2023₱49.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MASABLANG-RAGAS-CALLUGAYAN ROAD, BARANGAY MASABLANG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF TOMIANGAN FLOOD CONTROL, DUPAG, TABUK CITY, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2020₱24.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD, KATAO LACNOG TO ANUNANG, LIWAN WEST, RIZAL ROAD, LACNOG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱19.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF DUPAG PROPER FLOOD CONTROL ALONG CHICO RIVER, BRGY. DUPAG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱17.5M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱1,623,703.01

Progress

Past target date (DPWH On-Going)

Start Date

July 17, 2019

Target End

December 23, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaCity of TabukLacnog West
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.