Roads22FK0089

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-CONSTRUCTION OF SAN RAFAEL-BONGA ROAD, PHASE 1

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-CONSTRUCTION OF SAN RAFAEL-BONGA ROAD, PHASE 1 is a DPWH-tracked public work in Sorsogon DEO, Region V. Reported contract value: ₱74,249,998.01. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ALNINO CONST. Figures trace to dpwh.

Sorsogon DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXII-22-0010251 · ₱155,800 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FK0089 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-07-25 → 2025-06-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-CONSTRUCTION OF SAN RAFAEL-BONGA ROAD, PHASE 1

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure and Embankment of Lungib Seawall, Casiguran, Sorsogon
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXII-22-0010251

₱155,800.00 · FY2022

Released to Esperanza National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

123 projects · ₱5.4B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)PASACAO-BALATAN TOURISM COASTAL HIGHWAY, PASACAO, CAMARINES SUR, CAMARINES SUR (2ND LEGISLA

Region V, Region V

2023₱125.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0399+243-K0400+614.45, LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)

Region V, Region V

2022₱119.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LA MEDALLA-SALVACION-SAN VICENTE DIVERSION ROAD, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2024₱106.3M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY PASS AND DIVERSION ROADS-CASTILLA BY PASS ROAD PACKAGE 3 CASTILLA, SORSOGON

Sorsogon DEO, Region V

2021₱104.0M
Reported complete (DPWH)
No sat.

CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA. PROGRAM-TRIP

Sorsogon 2nd DEO, Region V

2023₱96.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONSTRUCTION OF PASACAO-BALATAN COASTAL ROAD, BRGY. PINAMASAGAN, SAN FERNANDO, CAMARINES SUR, SAN FERNANDO,

Region V, Region V

2020₱96.5M
Reported complete (DPWH)
View all 123 projects →

4. Implementation

Contract Amount

₱74,249,998.01

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

July 12, 2022

Target End

November 29, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonCastillaAmomonting
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.