Bridges23BD0030

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE BR. 4 & APPROACHES ALONG CABASAN - SISIM - BUGATAY - SAN ROQUE - NANNARIAN - AGUGADDAN RD. PEÑABLANCA, CAGAYAN

SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE BR. 4 & APPROACHES ALONG CABASAN - SISIM - BUGATAY - SAN ROQUE - NANNARIAN - AGUGADDAN RD. PEÑABLANCA, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱11,760,000.00. Status: Reported complete (DPWH). Contractor on record: DOUBLE J1908 CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-23-0024446 · ₱679,288 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱11,658,396 · DOUBLE J1908 CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-11-24 → 2023-08-13

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SAN ROQUE BR. 4 & APPROACHES ALONG CABASAN - SISIM - BUGATAY - SAN ROQUE - NANNARIAN - AGUGADDAN RD. PEÑABLANCA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Pinacanauan River, Barangay Quibal, Pe±ablanca, Cagayan
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-23-0024446

₱679,288.00 · FY2023

Released to 0000000 Philippine Statistical - Research and Training Institute (formerly Statistical Research and Training Center) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Sustainable Infrastructure Projects Alleviating Ga

₱11,658,396.22 · DOUBLE J1908 CONSTRUCTION

Award / contract ref: 23BD0030

Contractor

D

144 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-SOLANA DIVERSION ROAD (TUGUEGARAO- SOLANA BRIDGE AND APPROACHES), PHASE 3 (PACKAGE 2), CAGAYAN

Region II, Region II

2024₱270.0M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - TUGUEGARAO CITY BOULEVARD (PINACANAUAN BRIDGE 2 AND APPROACHES), PHASE 3 (PACKAGE 2) TUGUEGARAO CITY, CAGAYAN

Region II, Region II

2024₱264.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO - ENRILE DIVERSION ROAD (INCLUDING TUGUEGARAO - ENRILE BRIDGE AND APPROACHES, PHASE 3, CAGAYAN

Region II, Region II

2024₱237.9M
Past target date (DPWH On-Going)

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARA

Region II, Region II

2024₱183.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO - SOLANA DIVERSION ROAD (TUGUEGARAO - SOLANA BRIDGE AND APPROACHES), PACKAGE 1, CAGAYAN

Region II, Region II

2025₱141.7M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO - SOLANA DIVERSION ROAD (TUGUEGARAO - SOLANA BRIDGE AND APPROACHES), PACKAGE 2, CAGAYAN

Region II, Region II

2025₱141.7M
Past target date (DPWH On-Going)
View all 144 projects →

4. Implementation

Contract Amount

₱11,760,000.00

Progress

Reported complete (DPWH)

Start Date

March 21, 2023

Target End

November 17, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanPeñablancaNannarian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →