Roads24JD0051

CONSTRUCTION OF CABANCALAN ROAD, LILOY, ZAMBOANGA DEL NORTE

CONSTRUCTION OF CABANCALAN ROAD, LILOY, ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Zamboanga del Norte 3rd DEO, Region IX. Reported contract value: ₱39,041,155.82. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ESR CONST AND DEVELOPMENT CORP FORMERLY: ESR CONST. Figures trace to dpwh.

Zamboanga del Norte 3rd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱10,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-24-0016030 · ₱6,897,380 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24JD0051 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-01 → 2025-04-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CABANCALAN ROAD, LILOY, ZAMBOANGA DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Katipunan, Zamboanga del Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-24-0016030

₱6,897,380.00 · FY2024

Released to Davao del Sur District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

335 projects · ₱24.0B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF CONCRETE ROAD AND ROAD SLOPE PROTECTION STRUCTURE BALIGUIAN COASTAL ROAD, JUNCTION BALIGUIAN - KAUSWAGAN - MAMAD SECTION, ZAMBOANGA DEL NORTE, 2ND DEO, K2043+170.00 - K2044+410.00, K2044+810.00 - K2046+464.00, NET LENGTH: 5.79 LANE KM/2,8

Region IX, Region IX

2018₱280.6M
Reported complete (DPWH)
No sat.

CONCRETING OF ZAMBOANGA DEL SUR COASTAL ROAD, ZAMBOANGA DEL SUR (2ND DEO), CHAINAGE 0 - CHAINAGE 3008.75; CHAINAGE 6000 - CHAINAGE 7542.78; CHAINAGE 28510 - CHAINAGE 29558.80; CHAINAGE 97 - CHAINAGE 1097; CHAINAGE 940.00 - CHAINAGE 1979.62; CHAINAGE 21157

Region IX, Region IX

2016₱276.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LABANGAN - PAGADIAN CITY - DUMALINAO ZDS BY-PASS ROAD, INCLUDING ROW, ZAMBOANGA DEL SUR

Region IX, Region IX

2018₱215.6M
Reported complete (DPWH)
No sat.

CONCRETING OF ROAD LUUK - PANAMAO - PATIKUL CIRCUMFERENTIAL ROAD, SULU 2ND LD, STA. 5+000.00 - STA. 10+280.00 (NET LENGTH: 5,280.00 LN.M.)

Region IX, Region IX

2016₱202.5M
Reported complete (DPWH)
No sat.

ROAD WIDENING DIPOLOG - SINDANGAN - LILOY ROAD, ZAMBOANGA DEL NORTE 1ST DEO, K1873+862.00 - K1875+233.00, K1875+377.00 - K1877+534.00, K1881+560.00 - K1884+449.95, K1884+449.95 - K1885+210.00, NET LENGTH: 14.36 LANE KM/7,178.00 LN.M./7.178 KM

Region IX, Region IX

2018₱187.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD ALONG NRJ BARANGAY CAMUL - NRJ BARANGAY LUMBAYAO PACKAGE 2, ZAMBOANGA DEL NORTE

Region IX, Region IX

2024₱173.6M
Past target date (DPWH On-Going)
View all 335 projects →

4. Implementation

Contract Amount

₱39,041,155.82

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

May 21, 2024

Target End

December 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del NorteLiloyCommunal
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.