Bridges18IA0071

CLUSTER I: A. EMERGENCY REPAIR / RESTORATION OF SANTOL BRIDGE ABUTMENT ALONG BILIRAN CIRCUMFERENTIAL ROAD (S00002BR) K1008+286 BILIRAN, BILIRAN; B. EMERGENCY REPAIR / RESPTORATION OF BAGONGBONG BRIDGE ABUTMENT ALONG BILIRAN CIRCUMFERENTIAL ROAD (S00002BR)

CLUSTER I: A. EMERGENCY REPAIR / RESTORATION OF SANTOL BRIDGE ABUTMENT ALONG BILIRAN CIRCUMFERENTIAL ROAD (S00002BR) K1008+286 BILIRAN, BILIRAN; B. EMERGENCY REPAIR / RESPTORATION OF BAGONGBONG BRIDGE ABUTMENT ALONG BILIRAN CIRCUMFERENTIAL ROAD (S00002BR) is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱11,632,696.78. Status: Reported complete (DPWH). Contractor on record: LJPM BUILDERS. Figures trace to dpwh.

Biliran DEO, Region VIII
Region: Region VIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-C-18-0024228 · ₱11,034,798 · release to the district office, not itemized per project

    Possible match · score 0.73

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18IA0071 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-03-28 → 2025-10-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER I: A. EMERGENCY REPAIR / RESTORATION OF SANTOL BRIDGE ABUTMENT ALONG BILIRAN CIRCUMFERENTIAL ROAD (S00002BR) K1008+286 BILIRAN, BILIRAN; B. EMERGENCY REPAIR / RESPTORATION OF BAGONGBONG BRIDGE ABUTMENT ALONG BILIRAN CIRCUMFERENTIAL ROAD (S00002BR)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Extension of Flood Control Structure along Santol River protecting Santol River Bridge and Biliran Circumferential Road, Biliran, Biliran
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-18-0024228

₱11,034,798.00 · FY2018

Released to Regional Office - III (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

45 projects · ₱311.9M total · 0 flags

4. Implementation

Contract Amount

₱11,632,696.78

Progress

Reported complete (DPWH)

Start Date

August 8, 2018

Target End

October 6, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)BiliranBiliranSan Isidro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.