GAA 2024 SSP24PK0060

BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SUPPLY SYSTEMS - CONSTRUCTION OF POTABLE WATER SYSTEM, CADAMAYAN (KEZU GALCAS) - LUBUAGAN, KALINGA

BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SUPPLY SYSTEMS - CONSTRUCTION OF POTABLE WATER SYSTEM, CADAMAYAN (KEZU GALCAS) - LUBUAGAN, KALINGA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱9,890,609.54. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: 619 BUILDERS CONST CORP. Figures trace to dpwh.

Upper Kalinga DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROIII-24-0001358 · ₱186,833 · release to the district office, not itemized per project

    Possible match · score 0.57

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24PK0060 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-01-14 → 2023-01-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SUPPLY SYSTEMS - CONSTRUCTION OF POTABLE WATER SYSTEM, CADAMAYAN (KEZU GALCAS) - LUBUAGAN, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Janom - Sisim Flood Control, Sta. 179 + 410 - Sta. 179 + 560 ( LS ) , Western Uma, Lubuagan, Kalinga
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-24-0001358

₱186,833.00 · FY2024

Released to Regional Office - III (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

33 projects · ₱616.6M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION OF VARIOUS GOVERNMENT BUILDINGS OF LOCAL GOVERNMENT UNIT OF SAN MANUEL, ISABELA, MUNICIPAL COMPOUND SAN MANUEL, ISABELA

Isabela 2nd DEO, Region II

2024₱96.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BRGY. EDEN ROAD, EDEN, SAN MANUEL, ISABELA

Isabela 2nd DEO, Region II

2024₱40.4M
Reported complete (DPWH)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF BABANUANG LOCAL ROAD, BARANGAY BABANUANG, SAN MANUEL, ISABELA

Isabela 2nd DEO, Region II

2023₱37.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD - REHABILITATION/IMPROVEMENT OF BRGY. DISTRICT 3 MUNICIPAL AND BRGY. ROAD, SAN MANUEL, ISABELA, NEW CONSTRUCTION STA. 0+487.0 - STA. 0+496.0, STA. 0+724.0 - STA. 0+876.0,

Isabela 2nd DEO, Region II

2020₱36.6M
Reported complete (DPWH)
No sat.

ONVERGENCE AND SPECIAL SUPPORT PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF BRGY. MALALINTA ROAD, MALALINTA, SAN MANUEL, ISABELA

Isabela 2nd DEO, Region II

2024₱35.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF DISTRICT 1 MANANAO ROAD (BRGY. DISTRICT 1), SAN MANUEL, ISABELA

Isabela 2nd DEO, Region II

2022₱33.6M
Reported complete (DPWH)
View all 33 projects →

4. Implementation

Contract Amount

₱9,890,609.54

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

June 13, 2024

Target End

January 28, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)KalingaPasil
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultLandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.