Buildings and Facilities16HF0111No coordinates published by DPWH

COMPLETION OF BARILI DISTRICT HOSPITAL (ANNEX BUILDING), BRGY. POBLACION, BARILI, CEBU

COMPLETION OF BARILI DISTRICT HOSPITAL (ANNEX BUILDING), BRGY. POBLACION, BARILI, CEBU is a DPWH-tracked public work in Cebu 3rd DEO, Region VII. Reported contract value: ₱4,954,997.89. Status: Reported complete (DPWH). Contractor on record: FIRST GRANDEUR BUILDERS INC FORMERLY: FIRST GRANDEUR BUILDERS. Figures trace to dpwh.

Cebu 3rd DEO, Region VII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-16-0022690 · ₱14,409,557 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16HF0111 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: COMPLETION OF BARILI DISTRICT HOSPITAL (ANNEX BUILDING), BRGY.  POBLACION, BARILI, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Combado River - Himungbongan Flood Control Structures, Sitio Combado, Brgy. Cantu - od, Balamban, Cebu
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-16-0022690

₱14,409,557.00 · FY2016

Released to Mariano Marcos Memorial Hospital and Medical CTo (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

323 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MAHANLUD -BAR

Cebu 7th DEO, Region VII

2025₱141.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANGACO ROAD, BARANGAY MA

Cebu 7th DEO, Region VII

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROADS, PALANAS-CANORONG-MANGACO BRGY. ROADS, GINATIL

Cebu 7th DEO, Region VII

2023₱96.5M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MARIA RIVER (UPSTREAM OF MARIA BRIDGE), PHASE 1, PO

Siquijor DEO, Negros Island Region

2025₱96.5M
Past target date (DPWH On-Going)
No sat.

CSSP: ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES AT AGATON SORONO ST. TO SUBA MASULOG-SUBA PANAS ROAD, BARGY. SUBABASBAS, LAPU-LAPU CITY, CITY

Cebu 6th DEO, Region VII

2023₱96.4M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONST OF ROAD, BRGY ULING - BRGY TAGJAGUIM

Cebu 1st DEO, Region VII

2025₱91.7M
Past target date (DPWH On-Going)
View all 323 projects →

4. Implementation

Contract Amount

₱4,954,997.89

Progress

Reported complete (DPWH)

Start Date

March 23, 2017

Target End

September 8, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.