Roads24JB0037

BIP- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BAGONG BAGUIO, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE

BIP- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BAGONG BAGUIO, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE is a DPWH-tracked public work in Zamboanga del Norte 1st DEO, Region IX. Reported contract value: ₱49,480,000.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: A I YU BUILDERS. Figures trace to dpwh.

Zamboanga del Norte 1st DEO, Region IX
Region: Region IX

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱21,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-24-0005040 · ₱375,603 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱49,480,000 · A.I. YU BUILDERS & ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-08-30 → 2015-08-30

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BIP- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BAGONG BAGUIO, SERGIO OSMEÑA, ZAMBOANGA DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱21,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Layawan River ( Batotiltil Section ) along Dipolog - Punta - Dansullan - S Osmeña - Zamboanga del Norte / Sur Bdry Road, Sergio Osmeña, Zamboanga del Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-24-0005040

₱375,603.00 · FY2024

Released to Davao del Sur District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CONSTRUCTION PROJECTS

₱49,480,000.00 · A.I. YU BUILDERS & ENTERPRISES

Award / contract ref: 24JB0037

Contractor

F

92 projects · ₱1.6B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION (COMPLETION) OF STANDARD TWO-STOREY BUILDING OF DPWH ZAMBOANGA DEL NORTE 2ND DEO (FORMER ZAMBOANGA DEL NORTE 1ST DEO), GULAYON, DIPOLOG CITY, ZAMBOANGA DEL NORTE

Zamboanga del Norte 2nd DEO, Region IX

2023₱96.4M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE RIZAL-DAKAK-DAPITAN COASTAL LOOP ROAD K1823+899-K1824+000, K1824+000-K1825+000, 1827+000-K1828+000, K1828+000-K1828+673.20

Zamboanga del Norte 1st DEO, Region IX

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

SIPAG FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ILAYA BRIDGE, ABUTMENT B, DOWNSTREAM SECTION ILAYA, DAPITAN CITY, ZAMBOANGA DEL NORTE, PACKAGE 3

Zamboanga del Norte 1st DEO, Region IX

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG SINDANGAN - LILOY RD - K1945+000 - K1946 + 000, K1959 + 000 - K1959 + 679, K1962 + 000 - K1962 + 551, K1962 + 726 - K1963 + 836, ZAMBOANGA DEL NORTE

Zamboanga del Norte 3rd DEO, Region IX

2024₱75.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS DIPOLOG-OROQUIETA NATIONAL RD K1801+404-K1802+000, K1805+000-K1805+219, K1807+000-K1807+580, K1817+538-K1817+747, K1826+1003-K1827+1028, K1828+805-K1829+557

Zamboanga del Norte 1st DEO, Region IX

2024₱63.1M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF TWO-STOREY DPWH STANDARD OFFICE BUILDING ZAMBOANGA DEL NORTE 3RD DISTRICT ENGINEERING OFFICE,ZN

Zamboanga del Norte 1st DEO, Region IX

2023₱62.6M
Past target date (DPWH On-Going)
View all 92 projects →

4. Implementation

Contract Amount

₱49,480,000.00

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

March 20, 2024

Target End

October 3, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del NorteSergio Osmeña Sr.Bagong Baguio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.