Bridges, Roads19DK0079

CONSTRUCTION OF BYPASS AND DIVERSION ROAD, MAUBAN BYPASS ROAD (PACKAGE A) MAUBAN, QUEZON

CONSTRUCTION OF BYPASS AND DIVERSION ROAD, MAUBAN BYPASS ROAD (PACKAGE A) MAUBAN, QUEZON is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱51,376,600.00. Status: Reported complete (DPWH). Contractor on record: R T Y CONST. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0004171 · ₱46,809,683 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19DK0079 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-05-29 → 2016-05-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BYPASS AND DIVERSION ROAD, MAUBAN BYPASS ROAD (PACKAGE A) MAUBAN, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0004171

₱46,809,683.00 · FY2019

Released to Jose R. Reyes Memorial Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

177 projects · ₱6.4B total · 4 flags

Other projects by this contractor

No sat.

MFO-1 NATIONAL ROAD NETWORK SERVICES NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASSES/DIVERSION ROADS INCL. ROW LOPEZ BY-PASS ROAD, INCL. ROW, QUEZON

Region IV-A, Region IV-A

2017₱145.9M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (CONCRETE PAVING) ALONG SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD, K0318+216-K0321+966

Quezon 3rd DEO, Region IV-A

2016₱144.7M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL STRATEGIES TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD, K0272+067-K0275+840, BUENAVISTA, QUEZON

Region IV-A, Region IV-A

2017₱144.7M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD, K0262+323-K0266+025, BUENAVISTA, QUEZON

Region IV-A, Region IV-A

2017₱144.7M
Reported complete (DPWH)
No sat.

FY 2018 DPWH INFRASTRUCTURE PROGRAM, ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM, ROAD WIDENING/PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0192+100.00-K0192+729.00, K0201+730-K0203+839.00, QUEZON

Region IV-A, Region IV-A

2018₱144.7M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG MSR JCT-LOPEZ-CATANAUAN ROAD, K0248+912-K0250+790 & K0250+816-K0254+275, CATANAUAN, QUEZON

Region IV-A, Region IV-A

2017₱144.3M
Reported complete (DPWH)
View all 177 projects →

4. Implementation

Contract Amount

₱51,376,600.00

Progress

Reported complete (DPWH)

Start Date

June 26, 2019

Target End

July 19, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonMaubanPolo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.