Buildings and Facilities16DF0131No coordinates published by DPWH

CONSTRUCTION OF 3STY 12CL SCHOOL BUILDING AT ANABU I ES, IMUS CITY

CONSTRUCTION OF 3STY 12CL SCHOOL BUILDING AT ANABU I ES, IMUS CITY is a DPWH-tracked public work in Cavite 1st DEO, Region IV-A. Reported contract value: ₱18,582,708.16. Status: Reported complete (DPWH). Contractor on record: MONTADEL ENT. Figures trace to dpwh.

Cavite 1st DEO, Region IV-A

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region IV-A

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-16-0027749 · ₱8,540,498 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16DF0131 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 3STY 12CL SCHOOL BUILDING AT ANABU I ES, IMUS CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Brgy. Lantic, Carmona, Cavite
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-16-0027749

₱8,540,498.00 · FY2016

Released to Division of Sorsogon (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

38 projects · ₱903.6M total · 2 flags

Other projects by this contractor

Construction of Revetment along Julian River, Barangay Malagasang I-D, West Side, Imus, Cavite

IMUS CITY (CAVITE), CAVITE, Region IV-A

2023₱91.7M
Reported complete (DPWH)
No sat.

Construction of Revetment along Julian River, Brgy. Malagasang II-A, West Side, Imus, Cavite

IMUS CITY (CAVITE), CAVITE, Region IV-A

2022₱90.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG JULIAN RIVER, BRGY. MALAGASANG 1-F, WEST SIDE

Cavite 1st DEO, Region IV-A

2024₱72.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF REVETMENT ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2021₱49.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOODMANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHINMAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF REVETMENT ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2020₱49.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF BRIDGE/VIADUCT AND ROAD A

Cavite 1st DEO, Region IV-A

2025₱47.5M
Past target date (DPWH On-Going)
View all 38 projects →

4. Implementation

Contract Amount

₱18,582,708.16

Progress

Reported complete (DPWH)

Start Date

May 31, 2016

Target End

December 11, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF 3STY 12CL SCHOOL BUILDING AT ANABU I ES, IMUS CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/0ff8851c-fd71-45c0-b262-63217700b77c

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of Imus
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.