Construction of Revetment23DF0015

Construction of Revetment along Cañas River, Barangay Paradahan, Phase I, Tanza, Cavite

Construction of Revetment along Cañas River, Barangay Paradahan, Phase I, Tanza, Cavite is a DPWH-tracked public work in TANZA (CAVITE), CAVITE, Region IV-A. Reported contract value: ₱49,000,000.00. Status: Reported complete (DPWH). Contractor on record: N B AVILA CONST. Figures trace to sumbong.

TANZA (CAVITE), CAVITE, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System in Barangay Binakayan (Covelandia Road and Tirona Highway), Kawit, Cavite
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-23-0024870

₱60,191.00 · FY2023

Source

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

266 projects · ₱6.8B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS- CONSTRUCTION/REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, WIDENING OF MALAGASANG-BUCANDALA-ALAPAN RD., IMUS, CAVITE

Cavite 1st DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0054+(-536)-K0055+730,K005

Cavite 2nd DEO, Region IV-A

2024₱96.5M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CAVITE-BATANGAS ROAD (S01988LZ)

Cavite 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG BALUCTOT RIVER, PHASE II, BRGY.

Cavite 3rd DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY. SABANG TO BRGY. SAN JOSE, DASMARIÑAS CITY, CAVIT

Cavite 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE

Cavite 1st DEO, Region IV-A

2024₱95.6M
Past target date (DPWH On-Going)
View all 266 projects →

4. Implementation

Contract Amount

₱49,000,000.00

Progress

Reported complete (DPWH)

Start Date

March 6, 2023

Target End

November 30, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.