Buildings and Facilities23JG0077

CONSTRUCTION OF 1STY2CL WITH TOILET, BUSOL ES, TIGBAO, ZAMBOANGA DEL SUR

CONSTRUCTION OF 1STY2CL WITH TOILET, BUSOL ES, TIGBAO, ZAMBOANGA DEL SUR is a DPWH-tracked public work in Zamboanga del Sur 2nd DEO, Region IX. Reported contract value: ₱4,682,598.18. Status: Reported complete (DPWH). Contractor on record: NRMM CONST AND DEV'T CORP. Figures trace to dpwh.

Zamboanga del Sur 2nd DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱120,000

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-23-0020457 · ₱111,485,938 · release to the district office, not itemized per project

    Possible match · score 0.57

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23JG0077 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-12-18 → 2019-12-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1STY2CL WITH TOILET, BUSOL ES, TIGBAO, ZAMBOANGA DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱120,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project, Barangay Kahayagan, Bayog, Zamboanga del Sur Phase III
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-23-0020457

₱111,485,938.00 · FY2023

Released to Division of Palawan (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

207 projects · ₱2.4B total · 0 flags

Other projects by this contractor

No sat.

Construction of Flood Control along Brgy. Katipunan, Ramon Magsaysay, Zamboanga del Sur

RAMON MAGSAYSAY (LIARGO) (ZAMBOANGA DEL SUR), ZAMBOANGA DEL SUR, Region IX

2023₱53.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF DPWH ZAMBOANGA DEL SUR 2ND DEO STAFF HOUSE, BARANGAY POBLACION, GUIPOS, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2025₱53.8M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PRIMARY ROADS - DIPOLOG - SINDANGAN - LILOY ROAD (S01057MN) - K1874+155 - K1874+494

Zamboanga del Norte 2nd DEO, Region IX

2023₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE II, BARANGAY BULAWAN, SAN MIGUEL, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2025₱49.0M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUMALIAN RIVER, PHASE II, BARANGAY DUMALIAN, SAN MIGUEL, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2025₱49.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG KUMALARANG RIVER LEADING TO SEASHORE, KUMALARANG, ZAMBOANGA DEL SUR

Zamboanga del Sur 2nd DEO, Region IX

2024₱49.0M
Past target date (DPWH On-Going)
View all 207 projects →

4. Implementation

Contract Amount

₱4,682,598.18

Progress

Reported complete (DPWH)

Start Date

September 18, 2023

Target End

January 13, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga del SurTigbaoBusol
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.